- ) entergy GNRO2024-00021 June 11, 2024 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 Jeffery A. Hardy Manager Regulatory Assurance Grand Gulf Nuclear Station Tel: 802-380-5124
SUBJECT:
Grand Gulf Nuclear Station, Unit 1 Updated Final Safety Analysis Report Submittal Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 Renewed License No. NPF-29 Entergy Operations Inc. hereby resubmits one unredacted pdf copy (USB - Enclosure) of the Grand Gulf Nuclear Station (GGNS) Updated Final Safety Analysis Report (UFSAR). Entergy initially submitted the unredacted UFSAR on May 23, 2024 (Reference 1 ). This submittal contained three incorrect files. This submittal corrects the identified errors.
This submittal is a complete copy of the 1 O CFR 50 Appendix B controlled copy of the UFSAR.
This revision of the UFSAR includes changes made to the facility as described in the UFSAR during the period of July 20, 2022 through April 30, 2024. One USB is enclosed and labeled GGNS UFSAR-Full.
This letter contains no new Regulatory Commitments. Should you have any questions concerning the content of this letter, please contact me at 802-380-5124.
Sin9Ai11/
JAH/ram
Enclosure:
- 1. Grand Gulf Nuclear Station UFSAR-Full
GNRO2024-00021 Page 2 of 2
Reference:
- 1. Entergy Operations Inc. Letter to U.S. Nuclear Regulatory Commission, "Grand Gulf Nuclear Station, Unit 1 Updated Final Safety Analysis Report Submittal," Dated May 23, 2024 cc:
NRC Region IV - Regional Administrator NRC Senior Resident Inspector, Grand Gulf Nuclear Station NRR Project Manager