Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035A331 + (Resubmittal of Prior Applications & Suppls for Approval to Transport MW-3000 Radioisotope Thermoelectric Generator as Type B Package)
- ML20035A336 + (Resubmittal of Prior Applications & Suppls for Approval to Transport Dentinel 8 Radioisotope Thermoelectric Generator as Type B Package)
- NRC-03-0016, Resubmittal of Proposed License Amendment for the Revision of Control Room Emergency Filtration System Technical Specification Surveillance Requirements Regarding Unfiltered Inleakage + (Resubmittal of Proposed License Amendment for the Revision of Control Room Emergency Filtration System Technical Specification Surveillance Requirements Regarding Unfiltered Inleakage)
- ML20054G197 + (Resubmittal of Proposed Supplemental Contention 7. Psychological Stress Should Have Been Considered in Environ Rept & NRC & Applicant Studies.Proof of Svc Encl)
- PLA-6199, Resubmittal of Proprietary Information + (Resubmittal of Proprietary Information)
- ZS-2017-0058, Resubmittal of Radioactive Effluent Release Report, Radioactive Effluent Control Program Report, Offsite Dose Calculation Manual and Process Control Program for 2016 + (Resubmittal of Radioactive Effluent Release Report, Radioactive Effluent Control Program Report, Offsite Dose Calculation Manual and Process Control Program for 2016)
- ML16293A130 + (Resubmittal of Radiological Survey and Dose Assessment Report for the Western New York Nuclear Service Center and Off-Site Areas in Follow Up to Aerial Gamma Radiation Survey, Rev. 0, Dated August 22, 2016, Appendices and References)
- W3F1-2019-0022, Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results + (Resubmittal of Reactor Vessel Material Surveillance Program Capsule Test Results)
- ML050660425 + (Resubmittal of Redacted Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Report and Action Plans for the Davis-Besse Nuclear Power Station)
- RA-24-0254, Resubmittal of Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components + (Resubmittal of Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components)
- 3F0407-15, Resubmittal of Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 0 + (Resubmittal of Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 0)
- ML16323A193 + (Resubmittal of Request for Approval of Security Plan)
- ML102150230 + (Resubmittal of Request for Approval of the PVNGS Cyber Security Plan)
- ET 10-0002, Resubmittal of Request for Exemption from Specific 10 CFR Par 73 Requirements + (Resubmittal of Request for Exemption from Specific 10 CFR Par 73 Requirements)
- ML20076C310 + (Resubmittal of Request for License Amendment: Retained Premises Radiation Protection Requirements)
- ML19284C736 + (Resubmittal of Request for Relief No. 1-ISI-27 for the Period of Extended Operation)
- RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles + (Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles)
- ML20093D162 + (Resubmittal of Request to Extend the Due Date for Submitting Doe/Nrc Forms 742, 742C, and NRC Form 327 Following Inventory at Framatome Inc., Richland, Washington Site)
- EPID:L-2020-MCA-0002 + (Resubmittal of Request to Extend the Due Date for Submitting Doe/Nrc Forms 742, 742C, and NRC Form 327 Following Inventory at Framatome Inc., Richland, Washington Site)
- RC-03-0196, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19 + (Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19)
- RC-03-0197, Resubmittal of Request to Use Alternative to ASME Boiler and Pressure Vessel Code, Section XI (C-02-3202), RR-II-9, RR-11-9, RR-II-10, RR-II-11, RR-II-12 + (Resubmittal of Request to Use Alternative to ASME Boiler and Pressure Vessel Code, Section XI (C-02-3202), RR-II-9, RR-11-9, RR-II-10, RR-II-11, RR-II-12)
- RC-03-0189, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (0-C-03-0262) RR-II-20 and RR-II-21 + (Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (0-C-03-0262) RR-II-20 and RR-II-21)
- NL-12-001, Resubmittal of Response to RAI on Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act + (Resubmittal of Response to RAI on Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act)
- ML102870109 + (Resubmittal of Response to Request for Additional Information for Exemption Request for the RCP Oil Collection System)
- ML16330A404 + (Resubmittal of Revision 20 to the Updated Final Safety Analysis Report Cd Roms)
- DCL-19-063, Resubmittal of Revision 24 to Updated Final Safety Analysis Report + (Resubmittal of Revision 24 to Updated Final Safety Analysis Report)
- GO2-04-174, Resubmittal of Revisions to Physical Security Plan for Columbia Generating Station Pursuant to Order EA-03-086 + (Resubmittal of Revisions to Physical Security Plan for Columbia Generating Station Pursuant to Order EA-03-086)
- ML042580024 + (Resubmittal of Revisions to Physical Security Plan for Columbia Generating Station Pursuant to Order EA-03-086)
- SBK-L-06068, Resubmittal of Semi-Annual Fitness-For-Duty Report + (Resubmittal of Semi-Annual Fitness-For-Duty Report)
- W3F1-2016-0021, Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Resubmittal of Sixth Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ML21277A246 + (Resubmittal of Solutions Decommissioning Quality Assurance Program (Dqap), Revision 0)
- ML19197A319 + (Resubmittal of Supplement to 2018 Annual Radioactive Effluent Release Report)
- ML19197A320 + (Resubmittal of Supplement to 2018 Annual Radioactive Effluent Release Report)
- ML20052A505 + (Resubmittal of Tech Specs for Nuclear Science Ctr,Reactor Facility License R-83)
- ML15086A157 + (Resubmittal of Technical Requirements Manual Update to the NRC Waterford Steam Electric Station, Unit 3)
- W3F1-2004-0082, Resubmittal of Waterford 3 Security Plan + (Resubmittal of Waterford 3 Security Plan)
- ML102850435 + (Resubmittal of Westinghouse Documentation Supporting License Amendment 249, Changes to the Steam Generator Inspection Scope and Repair Requirements)
- ML20113E923 + (Resubmittal of Westinghouse Request for Temporary Change to Site Emergency Plan)
- ML24267A195 + (Resubmittal of Westinghouse Topical Report WCAP-16747-P/NP Appendices C and D, Revision 2, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D)
- ML22182A076 + (Resubmittal of the 2021 Annual Radioactive Effluent Release Report)
- NOC-AE-04001760, Resubmittal of the Annual Environmental Operating Report for 2003 + (Resubmittal of the Annual Environmental Operating Report for 2003)
- ML042180422 + (Resubmittal of the Annual Environmental Operating Report for 2003)
- ML15181A290 + (Resubmittal of the Areva Small Break LOCA Summary Report within the Application for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel)
- LR-N13-0024, Resubmittal of the Core Operating Limits Report for Cycle 22, Revision 4 + (Resubmittal of the Core Operating Limits Report for Cycle 22, Revision 4)
- CY-07-120, Resubmittal of the Final Status Survey Report for Phase V + (Resubmittal of the Final Status Survey Report for Phase V)
- ML080230450 + (Resubmittal of the Third 10-Year Interval for the Pump and Valve Inservice Testing Relief Requests PRR-03, PRR-05 and VRR-01)
- NL-11-079, Resubmittal to Clarify the IPEC Cyber Security Plan + (Resubmittal to Clarify the IPEC Cyber Security Plan)
- ML24165A269 + (Resubmittal, Updated Final Safety Analysis Report)
- L-2020-058, Resubmittal. Re Use of Wood Flour for Unit 4 Condenser Tubes + (Resubmittal. Re Use of Wood Flour for Unit 4 Condenser Tubes)
- ML12094A409 + (Resubmittal; Beyond Nuclear Pleading to Co-Petition in the Matter of Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Fuel Pool Modifications)
- JAFP-09-0117, Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008 + (Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008)