NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2 - Resubmittal of Revision 20 to the Updated Final Safety Analysis Report Cd Roms

From kanterella
(Redirected from ML16330A404)
Jump to navigation Jump to search
Vogtle Electric Generating Plant, Units 1 & 2 - Resubmittal of Revision 20 to the Updated Final Safety Analysis Report Cd Roms
ML16330A404
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/02/2016
From: Wheat J T
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16330A408 List:
References
NL-16-2280
Download: ML16330A404 (3)


Text

. _, Justin T. Wheat Nuclear Licensing Manager November 2, 2016 Docket Nos.: 50-424 50-425 Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 Tel 205.992.5998 Fax 205.992.7601 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Southern Nuclear NL-16-2280 Vogtle Electric Generating Plant, Units 1 & 2 Resubmit of Revision 20 to the Updated Final Safety Analysis Report CD ROMs

Reference:

1. Letter to the NRC (NL-16-1575), Vogtle Electric Generating Plant, Units 1 & 2 Revision 20 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 1 O CFR 50.59 Summary Report, and Revised NRC Commitments Report, dated September 21, 2016. Ladies and Gentlemen:

This letter replaces the three CD-ROMs provided in Enclosure 2 of NL-16-1575 (Reference

1) in its entirety.

The resubmittal correction is necessary because the Updated Final Safety Analysis Report included a design change that will not be implemented until the spring 2017 Unit 1 outage. This letter contains no NRC commitments.

If you have any questions, please contact Ken McElroy at 205.992.7369.

\

.1"'* ., U.S. Nuclear Regulatory Commission NL-16-2280 Page 2 Mr. Justin T. Wheat states he is Nuclear Licensing Manager for Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true. Respectfully submitted, Justin T. Wheat Nuclear Licensing Manager JTW/GLS/lac Sworn to and subscribed before me this L day of , 2016.

Notary Public My commission expires: /tJ -1/-d.() t 7

Enclosure:

CD-ROMs (3 discs) containing Files 001 -029 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President

& CEO (w/o enclosure)

Mr. D. G. Bost, Executive Vice President

& Chief Nuclear Officer (w/o enclosure)

Mr. D. R. Madison, Vice President-Fleet Operations (w/o enclosure)

Mr. M. D. Meier, Vice President-Regulatory Affairs (w/o enclosure)

Mr. B. K. Taber, Vice President

-Vogtle 1 & 2 (w/o enclosure)

Mr. B. J. Adams, Vice President-Engineering (w/o enclosure)

Mr. 0.0. Sutton, Regulatory Affairs Manager -Vogtle 1 & 2 (w/o enclosure)

RType: CVC7000 U. S. Nuclear Regulatory Commission Ms. C. Haney, Regional Administrator (w/o enclosure)

Mr. R. E. Martin, NRA Senior Project Manager -Vogtle 1 & 2 (w/o enclosure)

Mr. E. T. Coffman, Senior Resident Inspector

-Vogtle 1 & 2 (w/o enclosure)

_, Vogtle Electric Generating Plant, Units 1 & 2 Resubmit of Revision 20 to the Updated Final Safety Analysis Report CD ROMs Enclosure CD-ROMs (3 discs) containing Files 001 -029