Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19209B211 + (Responses to Miami Valley Power Project Interrogatories Re Contention 17.Contains Affirmation That Test at Const Technology Labs Was Designed to Qualify Fire Barrier Capability of Kaowool Matl Only.Certificate of Svc Encl)
- ML17041A330 + (Responses to NEI Comments on SPRA Checklist)
- ML19282C848 + (Responses to NRC 781228 Questions Re Mount Taylor U Mill Project.W/Oversized Drawings)
- ML19260A204 + (Responses to NRC 790524 Interrogatories.Includes Info on Vulnerability of RCS to Stress Corrosion Cracking. Certificate of Svc Encl)
- ML19345G471 + (Responses to NRC 810316 Requests for Admissions & Interrogatories Re Verona Fault.Affidavits & Certificate of Svc Encl)
- ML20050E441 + (Responses to NRC 820329 Request for Addl Info Re Fast Scram Hydrodynamic Loads in Piping & on Supports of CRD Sys. Required Mod to Design of Pipe Supports in CRD Sys Accomplished.Response to Expected by 820528)
- ML20058G376 + (Responses to NRC 820708 Request for Addl Info Re Safety Relief Valve Testing.Certificate of Svc Encl)
- ML20212M742 + (Responses to NRC 860808 Interrogatories Re Onsite Emergency Planning & Safety Issues.W/Certificate of Svc & Svc List)
- CNL-15-147, Responses to NRC Acceptance Review Questions Regarding Essential Raw Cooling Water and Component Cooling System License Amendment Request + (Responses to NRC Acceptance Review Questions Regarding Essential Raw Cooling Water and Component Cooling System License Amendment Request)
- CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request + (Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request)
- ML20153A785 + (Responses to NRC Clarification Questions on Emergency Plan)
- ML040490687 + (Responses to NRC Clarification Questions on Responses to RAIs Regarding License Amendment Request 195, Stretch Power Uprate)
- ML040420418 + (Responses to NRC Clarification Questions on Responses to Requests for Additional Information Regarding License Amendment Request 195, Stretch Power Uprate)
- ML033570513 + (Responses to NRC Clarification Questions on Responses to Requests for Additional Information Regarding License Amendment Request 195, Stretch Power Uprate)
- ML24113A219 + (Responses to NRC Comments on Ballot 23-2109)
- ML24113A220 + (Responses to NRC Comments on Ballot 23-2109RC1)
- ML21012A307 + (Responses to NRC Comments on the West Valley Demonstration Project Main Plant Process Building Decommissioning & Demolition Work Plan, Revision 4)
- ML20072F234 + (Responses to NRC Des.Des Does Not Impact Contentions on Safety,Mgt Capability,Security or Emergency Planning)
- ML20076E956 + (Responses to NRC First Set of Interrogatories.Certificate of Svc Encl.Related Correspondence)
- ML20083Q419 + (Responses to NRC First Set of Interrogatories)
- ML20054H541 + (Responses to NRC Interrogatories & Document Requests. Certificate of Svc Encl.Related Correspondence)
- ML20054H566 + (Responses to NRC Interrogatories & Document Requests. Certificate of Svc Encl)
- ML19224C814 + (Responses to NRC Interrogatories & Document Requests.Answers Contentions 3,4,6 & 7,re Missile Accidents,Matl Integrity, Occupational Exposure & Alternatives.Certificate of Svc Encl)
- ML20054H530 + (Responses to NRC Interrogatories & Requests for Documents. Certificate of Svc Encl.Related Correspondence)
- ML20196F118 + (Responses to NRC Interrogatories.* All Responses Re Disposal of Accident Generated Water by Intervenor F Skolnick. Certificate of Svc Encl.Related Correspondence)
- ML18346A719 + (Responses to NRC Questions)
- ML20032A284 + (Responses to NRC Questions Re FSAR & Text Changes Including Additions to App E)
- ML20147B294 + (Responses to NRC Questions Re Fast Response Narrow Range, Thermowell Mounted Resistance Temp Detectors)
- NOC-AE-03001528, Responses to NRC Questions Regarding Bottom Mounted Instrumentation Penetration Indications + (Responses to NRC Questions Regarding Bottom Mounted Instrumentation Penetration Indications)
- ML031360611 + (Responses to NRC Questions Regarding Bottom Mounted Instrumentation Penetration Indications)
- ML031340277 + (Responses to NRC Questions Regarding Bottom Mounted Instrumentation Penetration Indications)
- DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts + (Responses to NRC Questions Regarding License Renewal Efforts)
- ML20070T017 + (Responses to NRC Questions for SEP Topic III-2:Wind & Tornado Loadings)
- ML041560459 + (Responses to NRC Questions from Telecons on 5/25/04 & 5/27/04)
- ML20065B131 + (Responses to NRC Questions on Enrico Fermi Atomic Power Plant Unit 2 Plant-Unique Analysis Rept)
- ML20205T055 + (Responses to NRC Questions on RTD Bypass Elimination Licensing Rept)
- NL-03-0815, Responses to NRC Questions on Relaxation Request to Order EA-03-009 + (Responses to NRC Questions on Relaxation Request to Order EA-03-009)
- ML040650378 + (Responses to NRC RAI Regarding License Amendment Request 195, Stretch Power Uprate)
- ML23347A213 + (Responses to NRC Rais/Observations on NEI 22-01, Revision 0, License Termination Process)
- ML19326B513 + (Responses to NRC Re Fire Protection,W/Nrc Positions)
- L-16-252, Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations + (Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations)
- CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company + (Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company)
- ML25128A185 + (Responses to NRC Request for Additional Information Set 2 and Request for Confirmation of Information Set 3 Related to Subsequent License Renewal Application)
- ML25128A184 + (Responses to NRC Request for Additional Information Set 2 and Request for Confirmation of Information Set 3 Related to Subsequent License Renewal Application)
- ML18135A062 + (Responses to NRC Request for Additional Information Forwestinghouse Topical Report WCAP-18032-P/WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio)
- NL-23-0068, Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report + (Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report)
- ML102150029 + (Responses to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System)
- RA-22-0036, Responses to NRC Request for Additional Information Set 2 + (Responses to NRC Request for Additional Information Set 2)
- ML25100A133 + (Responses to NRC Request for Additional Information Set 1 and Request for Confirmation of Information Sets 1 and 2 Related to the Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application)
- ML25100A132 + (Responses to NRC Request for Additional Information Set 1 and Request for Confirmation of Information Sets 1 and 2 Related to the Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application)
- ML24150A092 + (Responses to NRC Request for Additional Information for EPRI Topical Report MRP-227, Rev. 2, Materials Reliability Program PWR Internals Inspections & Evaluations Guideline)