Responses to NRC 820329 Request for Addl Info Re Fast Scram Hydrodynamic Loads in Piping & on Supports of CRD Sys. Required Mod to Design of Pipe Supports in CRD Sys Accomplished.Response to Expected by 820528
ML20050E441
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/09/1982
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AECM-82-147, NUDOCS 8204130293
Download: ML20050E441 (2)


Text

-4

.. g MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi meAMiddB P. O. 8 O X 16 4 0. J A C K S O N, MISSISSIPPI 3 g

b A ril 9, 1982

  • 7Ecgm 1

P noct r An enocx>ciloN OFPAR f MF NT eo U.S. Nuclear Regulatory Commission ESy 3

q,,,,g 788g g Office of Nuclear Reactor Regulation Warhington, D.C.

20555

\\

  • >. 7.%.,

Attention:

Mr. Ilarold R. Denton, Director g

6

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/6140 liydrodynamic Loads on Control Rod Drive Systems AECM-82/147 In response to your request for additional information in letter MAEC-82/72, dated March 29, 1982, Mississippi Power & Light Company (MP&L) is providing the following information pertaining to " fast scram" hydrodynamic loads in the piping and on the supports of Control Rod Drive (CRD) systems. Considerations of hydrodynamic loads were included in the stress analyses of the piping and supports in the CRD system on Grand Gulf Nuclear Station (GGNS).

Modifications to the design of the pipe supports in the CRD system as required by these analyses were subsequently accomplished. Thus, the safety concerns identified to the NRC by Reactor Controls, Inc., in their letter dated October 14, 1981, are no longer applicable to GGNS.

Ilowever, MP&L will respond to the items identified in your letter dated March 29, 1982, on or before May 28, 1982. This issue and schedule has been discussed by telephone with Mr. M. D. IIouston, NRC Project Manager, on April 9, 1982.

Yours truly, l

L. F. Dale Manager of Nuclear Services JIIS/JGC/JDR:Im cc:

(See Next Page)

M E'204130293 820409 PDR ADOCK 05000416 h\\jO

^

PDR AElBB1 l

Member Middle South Utilities System

AECM-82/147 MITITIPPI POWER O LIGHT COMPANY Page 2 cc:

Mr. N. L. Stampley Mr. G. B. Taylor Mr. R. B. McGehee Mr. T. B. Conner Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. J. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 i

j 4

AElBB2