- ML12310A060 + (Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System)
- W3P88-1257, Response to NRC Bulletin 87-002,Suppl 1 Re Fastener Testing to Determine Conformance W/Applicable Matl Specs.List of Suppliers from Which safety-related & nonsafety-related Fasteners Purchased,Encl + (Response to NRC Bulletin 87-002,Suppl 1 Re Fastener Testing to Determine Conformance W/Applicable Matl Specs.List of Suppliers from Which safety-related & nonsafety-related Fasteners Purchased,Encl)
- ML18054A358 + (Response to NRC Bulletin 88-004 Re Potential safety-related Pump Loss)
- ML20195K454 + (Response to NRC Bulletin 88-005 for Plant Vogtle. Response Consists of Records Review,Testing Results,Analyses & Conclusions from Program for Determining Whether Ref safety- Related Fittings & Flanges Consistent W/Asme Code Criteria)
- ML20154G203 + (Response to NRC Bulletin 88-05 & Suppls 1 & 2,Nonconforming Matls)
- ML041590520 + (Response to NRC Bulletin No. 90-01, Supplement 1 - Loss of Fill Oil in Transmitters Manufactured by Rosemount)
- ML040690711 + (Response to NRC Bulleting 2003-02: Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity)
- ML023180082 + (Response to NRC Bulletins 2002-01 & 2002-02: Reactor Pressure Vessel Head and Penetrations Inspection)
- B18792, Response to NRC Bulletins Regarding Reactor Pressure Vessel Head Inspections + (Response to NRC Bulletins Regarding Reactor Pressure Vessel Head Inspections)
- ML060380531 + (Response to NRC CAL Followup Inspection Phase 2 Performance Improvement Initiative Review Inspection Report 0500440-05-014)
- ML20325A176 + (Response to NRC CFO, Letter Dated April 18, 2019 Re Reimbursement Request for Activities Associated with the Fees That Were Not Performed in a Satisfactory Manner)
- ML080930462 + (Response to NRC Chilling Effect Concerns at the Rhode Island Nuclear Science Center, December 27, 2007)
- ML16117A499 + (Response to NRC Clarification Request for NFPA-805 License Amendment Request)
- L-2003-104, Response to NRC Comment on Relief Request Risk Informed ISI + (Response to NRC Comment on Relief Request Risk Informed ISI)
- ML20246G388 + (Response to NRC Comments)
- TSTF-15-03, Response to NRC Comments Regarding TSTF-545, Revision 1, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing and Submittal of TSTF-545, Revision 2 + (Response to NRC Comments Regarding TSTF-545, Revision 1, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing and Submittal of TSTF-545, Revision 2)
- TSTF-10-17, Response to NRC Comments and Submittal of Revision 2 of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection + (Response to NRC Comments and Submittal of Revision 2 of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection)
- RA-05-011, Response to NRC Comments on Maine Yankee Area Classification Change: Storm Drains (D3500) - Section 7 + (Response to NRC Comments on Maine Yankee Area Classification Change: Storm Drains (D3500) - Section 7)
- ML22244A115 + (Response to NRC Comments on Relief Request RR-ENG-3-25)
- ML18192A186 + (Response to NRC Comments on the Construction-Phase Groundwater and Ecological Monitoring Programs. Also Enclosed Are 3 Additional Pages to the Program Submitted on 4/5/1976)
- ML092610651 + (Response to NRC Comments on the Final Status Survey Report for Concrete Rubble in Sub-Area F)
- ML091330236 + (Response to NRC Comments on the Fourth Interval ISI Program)
- ML16204A307 + (Response to NRC Component Design Bases Inspection, Inspection Report)
- L-2011-487, Response to NRC Component Performance and Testing Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (Response to NRC Component Performance and Testing Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request)
- ML16092A030 + (Response to NRC Concern with Temperature Effects on Safety-Related Electronics in Main Control Room)
- ML19323A577 + (Response to NRC Concerns on Liquefaction Potential)
- ML19322E590 + (Response to NRC Concerns on Liquefaction Potential, Prepared for LACBWR)
- ML19030A722 + (Response to NRC Concerns on Reactor Cavity Annulus Seal Ring)
- ML081000567 + (Response to NRC Confirmatory Action Letter (CAL)-4-07-004, List of Specific Tasks, Due Dates, Measures and Metrics)
- ENOC-10-00015, Response to NRC Confirmatory Order EA-09-060 from Entergy Nuclear Operations, Inc + (Response to NRC Confirmatory Order EA-09-060 from Entergy Nuclear Operations, Inc)
- ML090710679 + (Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008)
- L-2011-475, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request)
- L-2011-383, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request)
- L-2011-367, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request)
- L-2011-187, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request)
- L-2011-476, Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment + (Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment)
- TSTF-08-02, Response to NRC December 13, 2007 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Store Fuel Oil and Lube Oil Volume Values to Licensee Control + (Response to NRC December 13, 2007 Request for Additional Information Regarding TSTF-501, Revision 0, Relocate Store Fuel Oil and Lube Oil Volume Values to Licensee Control)
- ML20216C458 + (Response to NRC Demand for Info (NRC OI Rept 1-95-050))
- ML053500099 + (Response to NRC Demand for Information on Mitigation Strategies)
- ML20248D446 + (Response to NRC Diagnostic Evaluation Team Rept for Brunswick Plant & Supporting Organizations)
- ML20032E369 + (Response to NRC Discovery Request 79 Re Adequacy of NRC Plan for Retesting Operators & Monitoring Exams.Related Correspondence)
- RA-16-0012, Response to NRC Draft Audit Report Regarding License Amendment Request Regarding Alternate Fission Gas Gap Fractions + (Response to NRC Draft Audit Report Regarding License Amendment Request Regarding Alternate Fission Gas Gap Fractions)
- ML13247A709 + (Response to NRC Draft RAIs on the Seabrook Station Relief Request RA-13-001)
- DCL-10-162, Response to NRC Draft Request for Additional Information (Draft Set 34), Dated November 10, 2010, for the License Renewal Application + (Response to NRC Draft Request for Additional Information (Draft Set 34), Dated November 10, 2010, for the License Renewal Application)
- DCL-10-164, Response to NRC Draft Request for Additional Information (Draft Set 35), Dated November 29, 2010, for License Renewal Application + (Response to NRC Draft Request for Additional Information (Draft Set 35), Dated November 29, 2010, for License Renewal Application)
- LR-N11-0164, Response to NRC Draft Request for Additional Information B.2.1.28-4 Related to the ASME Section Xl Subsection IWE Aging Management Program Associated with the License Renewal Application + (Response to NRC Draft Request for Additional Information B.2.1.28-4 Related to the ASME Section Xl Subsection IWE Aging Management Program Associated with the License Renewal Application)
- ML11223A023 + (Response to NRC Draft Request for Additional Information 2010 Decommissioning Funding Status Report)
- ML111250573 + (Response to NRC Draft Request for Additional Information 2010 Steam Generator Tube Inspections)
- ML13056A603 + (Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks)
- PNP 2013-017, Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks + (Response to NRC Draft Safety Evaluation for License Amendment Request Replacement of Spent Fuel Pool Region I Storage Racks)
- ML23279A071 + (Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011)