Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-95-0569, Responds to RAI Re NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (Responds to RAI Re NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode)
- L-96-311, Responds to RAI Re NRC Bulletin 96-001, Control Rod Insertion Problems. Hot Rod Drop Test Results,Encl + (Responds to RAI Re NRC Bulletin 96-001, Control Rod Insertion Problems. Hot Rod Drop Test Results,Encl)
- ML18153A109 + (Responds to RAI Re NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment)
- ML20129B693 + (Responds to RAI Re Operating Interval Between Eddy Current Insps for Circumferential Indications in Plant SGs)
- ML20129B697 + (Responds to RAI Re Operating Interval Between Eddy Current Insps for Circumferential Indications in Plant SGs)
- ML20129D434 + (Responds to RAI Re Operating Interval Between Eddy Current Inspections for Circumferential Indication in Steam Generators)
- ML20197G533 + (Responds to RAI Re Pbaps,Unit 3 Jet Pump Riser Cracking Which Was Identified During Recent Unit 3 Refueling Outage)
- ML20065G907 + (Responds to RAI Re Planned Implementation of Power Rerate Program at Pbaps,Units 2 & 3)
- ML18038B824 + (Responds to RAI Re Plans for Evaluation of Indications at Core Spray Sys Piping collar-to-shroud Weld)
- ML20117K612 + (Responds to RAI Re Plant IPE Rept & GL 88-20)
- ML18065A882 + (Responds to RAI Re Preliminary Thermal Annealing Rept & RAI Re Request for Approval of ASME Code Case N-557, In-Place Dry Annealing of PWR Nuclear Reactor Vessel (Section 11, Div 1))
- ML20113A665 + (Responds to RAI Re Pressure Locking & Thermal Binding of SR Gate Valves)
- PLA-4794, Responds to RAI Re Proposed Amend 197 & 155 to Licenses NPF-14 & NPF-22 Re HPCI Transfer to Suppression Pool Logic Elimination.W/Seven Oversize Drawings + (Responds to RAI Re Proposed Amend 197 & 155 to Licenses NPF-14 & NPF-22 Re HPCI Transfer to Suppression Pool Logic Elimination.W/Seven Oversize Drawings)
- L-96-117, Responds to RAI Re Proposed Amend Concerning Thermal Power Uprate + (Responds to RAI Re Proposed Amend Concerning Thermal Power Uprate)
- U-602608, Responds to RAI Re Proposed Amend of Licencse NPF-62, Requesting Changes to Eliminate Periodic Response Testing of Analog Trip Modules + (Responds to RAI Re Proposed Amend of Licencse NPF-62, Requesting Changes to Eliminate Periodic Response Testing of Analog Trip Modules)
- ML20128Q720 + (Responds to RAI Re Proposed Amend to Operating Licenses DPR-39 & DPR-48)
- ML20197H900 + (Responds to RAI Re Proposed Amends to OSTR Ts.Replacement Pages to Amends Proposed in ,Encl.Changes to Personnel Shown in Encl Organization Chart of OSTR Ts,Per TS 6.7.c.3,noted)
- ML20059G941 + (Responds to RAI Re Proposed Change 177 to License DPR-36 Re Spent Fuel Pool Reracking)
- ML20236S847 + (Responds to RAI Re Proposed Change to QA Policy That Was Deemed to Be Reduction in Commitment)
- ML20115G564 + (Responds to RAI Re Proposed Change to TS 3/4.8.1, Electrical Power Sys - AC Sources & Associated Bases)
- ML20087F328 + (Responds to RAI Re Proposed Conversion of Units 1 & 2 TS Based on NUREG-1431)
- ML20136H396 + (Responds to RAI Re Proposed Extension of Byron & Braidwood Unit 1 3.0 Volt IPC License Amend for ODSCC)
- BSEP-98-0051, Responds to RAI Re Proposed Rev to Tech Specs for DG Surveillance Requirements + (Responds to RAI Re Proposed Rev to Tech Specs for DG Surveillance Requirements)
- JPN-97-027, Responds to RAI Re Proposed Ts,Revising Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of Edgs.Revised TS Pp 217,224 & 258f,describing Licensees Configuration Risk Mgt Program,Encl + (Responds to RAI Re Proposed Ts,Revising Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of Edgs.Revised TS Pp 217,224 & 258f,describing Licensees Configuration Risk Mgt Program,Encl)
- ML20063G322 + (Responds to RAI Re Reactor Vessel Weld Upper Shelf Energy for Units 1 & 2)
- ULNRC-03381, Responds to RAI Re Relief Request E-6 to ISI Program Plan + (Responds to RAI Re Relief Request E-6 to ISI Program Plan)
- ML20134P962 + (Responds to RAI Re Removal of cycle-specific Parameter Limits from Tech Specs)
- ML20117B976 + (Responds to RAI Re Request for Approval to Change QA Program Description by Changing Fire Protection Program Assessment Frequencies)
- ML20116C391 + (Responds to RAI Re Request for Authorization to Utilize ASME Boiler and Pressure Vessel Code Case N-521)
- BVY-96-145, Responds to RAI Re Request for Exemption from Requirement of 10CFR50,App R,Section Iii.G to Permit Use of Rockbestos Firezone + (Responds to RAI Re Request for Exemption from Requirement of 10CFR50,App R,Section Iii.G to Permit Use of Rockbestos Firezone)
- BVY-96-152, Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G + (Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G)
- ML20107J478 + (Responds to RAI Re Request for Relief 94-05 Second Ten Yr Interval ISI Program Plan)
- NG-96-2000, Responds to RAI Re Request for Rev to Tech Spec 3.7, Plant Containment Systems + (Responds to RAI Re Request for Rev to Tech Spec 3.7, Plant Containment Systems)
- B15804, Responds to RAI Re Request to Use Alternative to ASME Boiler and Pressure Vessel Code,Section 3 + (Responds to RAI Re Request to Use Alternative to ASME Boiler and Pressure Vessel Code,Section 3)
- ML20117H054 + (Responds to RAI Re Requesting Withholding Encl Info from Public Disclosure.Withholding Requested Because Encl Identifies Individuals Associated W/Pilgrim Security. Encl Withheld)
- LIC-96-0121, Responds to RAI Re Resolution of USI A-46 + (Responds to RAI Re Resolution of USI A-46)
- ML20097F915 + (Responds to RAI Re Response Time Testing)
- ML18153A773 + (Responds to RAI Re Response to GL 95-03, Circumferential Cracking of SG Tubes)
- ML20087F789 + (Responds to RAI Re Rev 2 to Relief Request GVRR-2 to Second 10-yr Interval IST Program)
- ML20133C849 + (Responds to RAI Re Rev 4.1 to Second 10-yr ISI Program)
- ML18065B001 + (Responds to RAI Re Rev to Pidal in-core Monitoring Computer Code.Chart Indicating Change in Predicted Rhodium Depletion Rates,Provided)
- BSEP-97-0024, Responds to RAI Re Rev to TS 3.0 & 4.0 Bases on Applicability & Surveillance Requirements,Per Guidance in GL 87-09 & NUREG-1433 + (Responds to RAI Re Rev to TS 3.0 & 4.0 Bases on Applicability & Surveillance Requirements,Per Guidance in GL 87-09 & NUREG-1433)
- ML20217P729 + (Responds to RAI Re Rev to TS 3/4.4, Reactor Coolant Sys)
- ML20097F806 + (Responds to RAI Re Review of IPEEE for Limerick Generating Station Units 1 & 2)
- ML20216H548 + (Responds to RAI Re Revised Loop Stop Valve Operation for North Anna Power Station,Units 1 & 2)
- ML20108D169 + (Responds to RAI Re Second 10-yr ISI Interval)
- GO2-97-099, Responds to RAI Re Second Ten Yr Interval ISI Program Relief 2ISI-15 for Exam Category C-G Pump Casing Welds + (Responds to RAI Re Second Ten Yr Interval ISI Program Relief 2ISI-15 for Exam Category C-G Pump Casing Welds)
- ML20116L538 + (Responds to RAI Re Spent Fuel Pool & Provides Commitments to Revise FSAR)
- ML20195H372 + (Responds to RAI Re Submittal of Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67.Item 6 Addressed Separately as It Contains Proprietary Info.Proprietary Encl Withheld)
- ML20117E447 + (Responds to RAI Re TMI-1 Core Reload Methodology & Provides Info Re TR-078,Rev 0, TMI-1 Transient Analyses Using the Retran Computer Code)
- ML20056G301 + (Responds to RAI Re TR NEDO-32205 on Upper Shelf Energy Equivalent Margin Analysis)