Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Requests Facility Decommissioning". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17086A282  + (Requests FEMA Review State & Local Planning Efforts for Areas Around CA Nuclear Power Plant Sites W/Respect to Complications Arising in Event of Extreme Natural Phenomena)
  • IA-87-823, Requests FEMA Review of Encl Final Rule Revising Exercise Timing Prior to Licensing.Only Last Two Sentences of Proposed Rule Revised for Clarity.Response Requested by 870327  + (Requests FEMA Review of Encl Final Rule Revising Exercise Timing Prior to Licensing.Only Last Two Sentences of Proposed Rule Revised for Clarity.Response Requested by 870327)
  • ML20245A295  + (Requests FEMA Review of Encl Final Rule Revising Exercise Timing Prior to Licensing.Only Last Two Sentences of Proposed Rule Revised for Clarity.Response Requested by 870327)
  • ML20127C371  + (Requests FEMA Take Lead in Evaluation of Scope & Objectives of Emergency Exercise Proposed for Wk of 850211.Evaluation Involves Outstanding Plan Inadequacies & Legal Authority Issues.Util & Addl Correspondence Encl)
  • ML19329D488  + (Requests FSAR & FSAR Amends)
  • ML20031G249  + (Requests FSAR Be Amended to Include Addl Info Required to Complete License Application Evaluation.Questions Encl)
  • ML20154C188  + (Requests FSAR Be Sent to Listed Address)
  • ML20197E782  + (Requests FY84 Obligations from Apr-Sept Using Mar 1984 Actuals as Base Forecast)
  • ML20041E633  + (Requests Facilities Be Shut Down)
  • ML20032E139  + (Requests Facilities Be Shut Down)
  • ML20032E141  + (Requests Facilities Be Shut Down)
  • ML20011B061  + (Requests Facilities Be Shut Down Pending Remedial Action Re Reactor Pressure Vessel Shock)
  • ML19319B480  + (Requests Facilities W/Westinghouse or Combustion Engineering Design Steam Generators Take Actions,Including Possible Design Mods,To Assure Acceptably Low Health & Safety Risks. NRC Continues Assessing Water Hammer Effects on Safety)
  • ML19305A966  + (Requests Facility 790722 SER & Placement on NRC Mailing List for Future Updated SERs)
  • ML19284A423  + (Requests Facility Allowable Settlement Not Be Increased. Requests Hearing.Asks Why Util Waited Until 780428 to Rept Major Pumphouse Sinking in Aug 1977)
  • ML19284A424  + (Requests Facility Allowable Settlement Not Be Increased. Requests Hearing.Asks Why Util Waited Until 780428 to Rept Major Pumphouse Sinking in Aug 1977)
  • ML19260D894  + (Requests Facility Be Closed Down.Plant Violates NRC Rules & Congressional Intent Re Locating of Nuclear Power Facilities in Densely Populated Areas.Facilities Store Spent Fuel on Site Rather than Shipping to Waste Plant)
  • ML17249A480  + (Requests Facility Be Closed Until Review of Documentation Assuring Quality & Reliability of Electrical Connectors in Facility Reactor Safety Sys & Review of TMI Accident to Determine Reactor Safety Sys Adequacy)
  • ML19297E440  + (Requests Facility Be Shut Down & Requests Funds for Any Legal Fees Incurred in Connection W/Filing Petition)
  • ML20041E636  + (Requests Facility Be Shut Down Until Workable Evacuation Plan Has Been Devised)
  • ML19326D059  + (Requests Facility CP Stage Environ Rept & Federal Agency Comments Re Unit 2.Requests Clarification Re Unit 1 & 2 Environ Offsite Radiation Limits)
  • ML19259C392  + (Requests Facility Const Cease)
  • ML19259C391  + (Requests Facility Const Cease Due to Possible Health Hazards)
  • ML19259C393  + (Requests Facility Const Cease Due to Radiation Hazards)
  • ML19329B152  + (Requests Facility Control Circuit Review within 60 Days, Assuring Deficiencies Do Not Exist.Need for Review Based on Two Incidents Involving Inadvertent Disabling of Component by Racking Out Breaker for Different Component)
  • ML17297B178  + (Requests Facility Des & List of Groups Involved in Licensing Proceeding)
  • ML20107E854  + (Requests Facility Determination Re Compliance of Util Leakage Testing W/App J)
  • ML19326D056  + (Requests Facility Environ Rept.Expresses Interest in Cooperating in Facility Development)
  • ML20126A813  + (Requests Facility Exemption from Examination of Reactor Coolant Makeup Sys Components Under LOCA Conditions,As Described in GE Document 22A2756,Revision 2)
  • ML20034D454  + (Requests Facility Furnish Items Listed in Encl, Reference Material Requirements at Least 60-days Prior to Exam Date to Able Examiners Adequate Preparation for Visit)
  • ML20031G464  + (Requests Facility Hearing in Lehigh Valley in Evening or on Weekend Day to Accommodate Working Schedules)
  • ML20052A490  + (Requests Facility Inspectors Be Asked to Conduct Trend Analysis of Performance of Each of Active Licensees During 1976.Specific Areas to Be Considered Listed)
  • ML17249A466  + (Requests Facility Not Reopen Until All Findings Available on TMI-2)
  • ML17249A463  + (Requests Facility Not Reopen Until Safety Sys Checked)
  • ML17249A462  + (Requests Facility Not Reopen Until Thorough Review Conducted on TMI-2 Accident)
  • ML20037B854  + (Requests Facility Restart)
  • ML20037B852  + (Requests Facility Restart)
  • ML20037B853  + (Requests Facility Restart)
  • ML20037B855  + (Requests Facility Restart)
  • ML20037B850  + (Requests Facility Restart)
  • ML20037B851  + (Requests Facility Restart)
  • ML20037B856  + (Requests Facility Restart)
  • ML19341B646  + (Requests Facility SER Be Issued Immediately & Six Month Delay Period Be Rescinded.Certificate of Svc Encl)
  • ML20150A725  + (Requests Facility Specific Analysis Based Upon Postulated Locked Rotor Event to Support 871120 & 880527 Applications to Change Tech Specs Re Nuclear Fuel Design & Power Distribution Limits)
  • ML18138A044  + (Requests Facility Startup Following Installation of Piping Sys Mods Identified in Encl Rept on Reanalysis of Safety- Related Piping Sys. Remaining Analytical & Mod Work Outside Containment Will Be Expedited During Operation)
  • ML18138A045  + (Requests Facility Startup Following Installation of Piping Sys Mods Identified in Encl Rept on Reanalysis of Safety- Related Piping Sys. Remaining Analytical & Mod Work Outside Containment Will Be Expedited During Operation)
  • PY-CEI-NRR-1369, Requests Facility Svc List Be Updated to Replace RA Newkirk W/Kp Donovan & to Add RA Stratman  + (Requests Facility Svc List Be Updated to Replace RA Newkirk W/Kp Donovan & to Add RA Stratman)
  • ML19351D318  + (Requests Facility Tour for SL Davis for Completion of NRC Contracted Research Rept, Behavioral Observation Program to Assure Continued Reliability for Employees)
  • ML19351D315  + (Requests Facility Tour for SL Davis for Completion of NRC Contracted Research Rept, Behavioral Observation Program to Assure Continued Reliability for Employees)
  • ML19351D312  + (Requests Facility Tour for SL Davis for Completion of NRC Contracted Research Rept, Behavioral Observation Program to Assure Continued Reliability for Employees)