Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18298A146 + (Renotice - Federal Register Notice for the Comment Period for Standard Review Plan 2.5.3)
- ML21194A252 + (Renshaw J - Ai.Epri Initiative, Accelerating Adoption of Artificial Intelligence Technologies - RIC 2021)
- RCF 19-03, Rensselaer - Requests a Revision to the RPI Critical Experiments Facility, License CX-22, Technical Specifications + (Rensselaer - Requests a Revision to the RPI Critical Experiments Facility, License CX-22, Technical Specifications)
- EPID:L-2019-LLA-0254 + (Rensselaer - Requests a Revision to the RPI Critical Experiments Facility, License CX-22, Technical Specifications)
- ML11131A180 + (Rensselaer - Response to Request for Additional Information - Reactor Operators Requalification Program)
- ML21050A386 + (Rensselaer Polytech Institute - Request for RAI License Amendment Request for Modifications to the Restricted and Exclusion Area for the Renewed Facility Operating License (No≫ CX-22)
- ML20070P166 + (Rensselaer Polytechnic Inst Critical Facility Sar)
- ML20244B012 + (Rensselaer Polytechnic Inst QA Program)
- ML20215H898 + (Rensselaer Polytechnic Inst QA Program)
- ML12030A191 + (Rensselaer Submittal of Quality Assurance Program - Docket 71-XXXX)
- ML040920298 + (Rensselaer, Notification for Change in Contact at New York State Dept. of Environmental Conservation)
- ML20235M490 + (Rensselear Polytechnic Inst High Enrichment to Low Enrichment Fuel Conversion, Informal Rept)
- ML22279B051 + (Reopening of Public Comment Period for Direct Final Rule - Holtec HI-STORM 100 Renewal Certificate of Compliance No. 1014, Renewal of Initial Certificate and Amendments Nos. 1 Through 15)
- ML12090A602 + (Reopening of Public Comment Period on Draft License Renewal Interim Staff Guidance LR-ISG-2011-03: Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, Buried and Underground Piping and Tanks)
- ML19270H073 + (Reopens Evidentiary Hearing Due to Changes in Mgt Which Are Materially Relevant to Remanded Issue.Directs Util to Submit Affidavit Detailing Changes)
- ML20028F156 + (Reopens Significant Const Deficiency Repts 42 & 48 Due to Inadequate Description of Scope of Corrective Action Performed.Final Repts Expected by 830214)
- PMNS20250199, Reordersadf + (Reordersadf)
- ML053080290 + (Reorganization Letter)
- ML053080192 + (Reorganization Letter for Clinton, Unit 1)
- ML19308B873 + (Reorganization Plan 3 of 1978, Re Establishment of Federal Emergency Mgt Agency.Fr Notice Encl)
- ML022540918 + (Reorganization of Senior Management Team)
- ML20054J311 + (Reorganization of Witnesses Necessary to Prove Contentions 3.7 & 4.7 on Emergency Evacuation & Notification.Svc List Encl)
- ML20073R332 + (Reorganized Testimony of Jr Thornborough & D Bohning Re Contention 6.2 Concerning Impact of Shutdown on Physical Environ Near Facility)
- ML17332A992 + (Repair Boundary for Parent Tube Indications within Upper Joint Zone of Hybrid Expansion Joint Sleeved Tubes)
- ML20042A657 + (Repair Procedure - Nuclear Containment Vessel)
- ML20094M946 + (Repair Roll Qualification)
- ML19317H190 + (Repair Weld Induced Residual Stresses in Thick Walled Steel Pressure Vessels)
- 05000346/FIN-2014003-05 + (Repair Work Priority Did Not Support Timely Corrective Action)
- ML030100006 + (Repair of Allow 600 Small Bore Nozzles Without Flaw Removal Unit 1 Relief Request 23 & Unit 2 Relief Request 33)
- ML20043C951 + (Repair of Canal & Gamma Pit Spec 90-03)
- ML071080222 + (Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report)
- ML20138N988 + (Repairability & Maint)
- ML20138N864 + (Repairability of Nutec 11S/Nutec 11/Reactic 1201)
- 05000263/FIN-2014008-03 + (Repairs Credited for Hot Shutdown Conditions)
- 05000298/FIN-2009002-01 + (Repeat Failure to Assess and Manage the Risk of Heavy Equipment Operations (Section 1R13))
- 05000298/FIN-2011002-04 + (Repeat Failure to Follow Procedure for Initiating Condition Reports)
- 05000298/FIN-2010002-01 + (Repeat Failure to Follow Procedure for Initiating Condition Reports)
- ML16103A385 + (Repeat Fr Notice of Issuance of Operating License and Rod)
- 05000254/FIN-2018001-01 + (Repeat Use of Written Exams During Licensed Operator Requalification Examinations)
- 05000254/FIN-2017004-01 + (Repeat Use of Written Exams during Licensed Operator Requalification Examinations)
- 05000286/FIN-2010005-01 + (Repeated Control Room Air Conditioner Gasket Failures)
- 05000445/FIN-2011006-04 + (Repeated Diesel Generator Cam Cover Bolt Failures)
- 05000259/FIN-2011002-05 + (Repeated Failure to Control Transient Combustibles in Proximity of the Independent Spent Fuel Storage Facility)
- 05000259/FIN-2010005-03 + (Repeated Failure to Provide Complete and Accurate Information in LER 0500296/2009-003-02)
- 05000259/FIN-2012002-04 + (Repeated Failure to Report ECCS Analyses Methodology Change or Errors)
- ML20009C533 + (Repeats & Notarizes Util 810713 Response to NRC 810210 Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys)
- ML20207J406 + (Repeats 860519 Request for Data Responsive to Reg Guide 9.3 Re Antitrust OL Review.Responses from All co-owners Required to Assess Whether or Not Any Significant Changes Occurred Since 1980 Antitrust Settlement)
- ML20207J394 + (Repeats 860519 Request for Data Responsive to Reg Guide 9.3 Re Antitrust OL Review.Responses from All co-owners Required to Assess Whether or Not Any Significant Changes Occurred Since 1980 Antitrust Settlement)
- ML20214Q009 + (Repeats 870319 Request for Payment of Fees for 820303 & 830705 Applications Requesting Relief from ASME Code Requirements for First 10-yr Interval.Fees Reguested within 15 Days of Ltr Receipt)
- ML20083Q383 + (Repeats Request for ASLB to Withhold Decision on Intervenor 830808 Motion to Litigate Issues Raised by Dow Suit & to Open Discovery on Dow Issues.Review of Documents Should Be Complete in 2 Wks)
- 05000237/FIN-2008004-02 + (Repetitive Contaminated Water Spills in the Unit 2 Reactor Building)