Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262H983 + (Reactor Auxiliary Building Sections & Details. Sheet 7)
- ML20261N074 + (Reactor Auxiliary Building Seismic Supports Electrical Cable Trays & Conduits. Sheet 51)
- ML20261D700 + (Reactor Auxiliary Building Storage Building (Sect & Elev):I&E Bulletin 80-11 Details)
- ML20261D695 + (Reactor Auxiliary Building Storage Building (Plan & Elev):I&E Bulletin 80-11 Details)
- ML20262H952 + (Reactor Auxiliary Building Underground Conduit & Grounding. Sheet 1.Drawing Consists of Two Aperture Cards)
- ML17212B685 + (Reactor Auxiliary Building:El 0.50 Ft Conduit,Trays and Grounding. Sheet 1)
- ML17273A076 + (Reactor Auxiliary Building:El 19 Ft 6 Inches Conduit Trays & Grounding. Sheet 1)
- ML17212B679 + (Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 0.50. Sheet 4)
- ML17212B678 + (Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 19.50 Ft. Sheet 3)
- ML17212B676 + (Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 62 Ft. Sheet 1)
- ML17212B677 + (Reactor Auxiliary Building:Fire Protection Appendix R Fire Dampers,Fire Doors,Sprinkler and Halon Suppression Areas - El 43 Ft. Sheet 2)
- ML20264C904 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 305 Ft,Unit 1. Sheet 1. Acutal Drawing NUMBER:CAR-SH SK-668S20)
- ML20264C905 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286 Ft,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-66S18)
- ML20264C911 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 4. Actual Drawing NUMBER:CAR-SH SK-668S15)
- ML20264C923 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S08)
- ML20264C909 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286 & El 305,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S16)
- ML20264C920 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-668S10)
- ML20264C915 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S13)
- ML20264C907 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S17)
- ML20264C916 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S12)
- ML20264C921 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S09)
- ML20264C926 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 190,Unit 1. Actual Drawing NUMBER:CAR-SH SK-668S06)
- ML20264C918 + (Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 336,Unit 1. Sheet 4. Actual Drawing NUMBER:CAR-SH SK-668S11)
- ML20264C913 + (Reactor Auxiliary Buildings:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-668S14)
- ML20262K798 + (Reactor Auxiliary and Turbine Buildings,General Arrangement Hoist and Crane Schedule)
- ML19208D495 + (Reactor Basement Concrete Second Testing Program)
- ENS 52980 + (Reactor Bay Ventilation Inoperable)
- ML19211B960 + (Reactor Behavior Program,Plugged Steam Generator Effects on Loca)
- ML20265F248 + (Reactor Bldg & Radwaste Bldg Condensate Storage & Transfer System ISI Boundary Diagram)
- ML20262G758 + (Reactor Bldg & Turbine Hse - Steam Tunnel & Cable Tray Area:Plans & Sections - Unit 2)
- ML20260A308 + (Reactor Bldg - Pipe Restraint Details at Secondary Walls)
- ML20260A286 + (Reactor Bldg - Pipe Restraints.At Secondary Walls Location Plan - Sections & Details)
- ML20266B376 + (Reactor Bldg Area 17 Raceway Sections and Details Plan at El 100 Ft 2 Inches. Sheet 43)
- ML17055E068 + (Reactor Bldg Breathing Air & House Service Air)
- ML19343C131 + (Reactor Bldg Cable Separation Analysis Rept - Shoreham Nuclear Power Station)
- ML20266E180 + (Reactor Bldg Cable Tray Support Plan)
- ML17055E062 + (Reactor Bldg Closed LOOP Cooling Sys Piping at Reactor Recirc Pumps & Motors Section 1-1. Rev Date Illegible)
- ML20245B363 + (Reactor Bldg Containment Integrated Leak Rate Test)
- ML19225B523 + (Reactor Bldg Containment Integrated Leak Rate Test, Conducted 790713-16)
- ML18025A877 + (Reactor Bldg Containment Integrated Leak Rate Test, Conducted 800220-23)
- ML20004A974 + (Reactor Bldg Containment Integrated Leak Rate Test, Conducted 810214-15)
- ML20154K771 + (Reactor Bldg Containment Integrated Leak Rate Test,Sequoyah Nuclear Plant Unit 1,Conducted 851203-05)
- ML18024B352 + (Reactor Bldg Containment Integrated Leak Rate Test for Facility,Conducted 791121-25)
- ML20056A532 + (Reactor Bldg Containment Integrated Leak Rate Test, Sequoyah Nuclear Plant Unit 1 Conducted on 900504-06)
- ML20064E238 + (Reactor Bldg Containment Integrated Leak Rate Test on 780613-15.Outlines Objectives,Principal Events & Special Equip Used in the Cilrt.Concludes That Accurate Results Can Be Obtained While Significantly Reducing Test Time)
- ML20107F654 + (Reactor Bldg Containment Integrated Leak Rate Test, Conducted on 841120-21)
- ML20071B398 + (Reactor Bldg Containment Integrated Leak Rate Test, Conducted on 821208-09)
- ML20263M598 + (Reactor Bldg Control Rod Drive Removal Study. No Revision Date)
- ML20266A052 + (Reactor Bldg Control Rod Hydraulic Drive Piping Exhaust Water to Reactor Plan & Sections. Rev Date Illegible)
- ML19326B510 + (Reactor Bldg Cool Air Supply Ducts,Testing & Evaluation)
- ML20198K445 + (Reactor Bldg Cooling Fan Logic Mod Failure Modes & Effects Analysis, Rev 0)