Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262J456 + (RPS Terminal Block Wiring Diagram. Sheet 3 of 4)
- ML20262J459 + (RPS Terminal Block Wiring Diagram. Sheet 4 of 4)
- ML20262J320 + (RPS Trip Status Panel Assembly)
- ML20262J339 + (RPS Trip Status Panel Schematic & Wiring Diagrams. Sheet 2 of 2)
- ML20262J307 + (RPS Trip System Panel Schematic & Wiring Diagram. Revision Date Illegible)
- TSTF-418 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- ML12065A329 + (RPT 22, Inspection/Activity Plan)
- ML18113A036 + (RPT-SLAW-001, Rev. 0, Extended Leach Testing of Simulated Law Cast Stone Monoliths)
- ML020080166 + (RPV Capsule Schedule and SE - (TAC MB2761) - ML020080166)
- ML20266J502 + (RPV Control ATWS)
- ML20266J499 + (RPV Control Non ATWS)
- ML22033A006 + (RPV Embrittlement Poster 2-1-22)
- ML20266J506 + (RPV Flooding)
- ML032170915 + (RPV Fracture Toughness & Material Surveillance Requirements Additional Information - Neutron Flux Evaluation)
- ML072140214 + (RPV Head Inspection Results Clarifications)
- ML062970389 + (RPV Head Lifts at D. C. Cook Nuclear Power Plant)
- 05000461/FIN-2009004-04 + (RPV Head Strongback, Dryer/Separator Strongback and RPV Head Lifting Lugs Did Not Demonstrate Single Failure Proof Requirements of NUREG 0612, Control of Heavy Loads at Nuclear Power Plants, Section 5.1.6)
- ML20261C230 + (RPV Hydro Milestone. Sheet 1 of 1)
- ML20266G632 + (RPV Neutron Monitoring System Traverse in Core Probe Plan. Sheet 4)
- ML20072F261 + (RPV Surveillance Matls Testing)
- ML20081J864 + (RPV Surveillance Matls Testing & Analysis)
- ML20100L355 + (RPV Surveillance Matls Testing & Analysis)
- ML20085F122 + (RPV Surveillance Matls Testing & Fracture Toughness Analysis)
- ML20072F250 + (RPV Surveillance Program First Capsule (300) Removal After 8 Fuel Cycles)
- ML18141A396 + (RPV Tlr for PWROG)
- ML22101A286 + (RQ Inspection Corporate Notification Letter)
- ML20078K321 + (RQ Inspection Corporate Notification Letter Rev 1)
- ML22192A086 + (RQ Inspection Notification Letter)
- ML23234A254 + (RQ Inspection Notification Letter)
- ML051780188 + (RR 04-CN-001, Volumetric Weld Inspection Requirements)
- ML051780164 + (RR 04-CN-004, Class 1 ISI Pressure Test Boundaries Requirement (Tac No. MC3276, MC3277))
- ML080940215 + (RR 13R-01, Associated with the Third 10-Year Interval)
- ML23229A483 + (RR 20-Year ISI Pre-Submittal NRC Meeting Handout)
- ML050210392 + (RR 6 & 7, Vessel Head Penetration Weld Repair & Flaw Evaluation (TAC Nos. MC3860, 3861))
- ML071510187 + (RR Email with Request for Additional Information)
- ML18011A458 + (RR GGNS-2017-1, GGNS-2017-2 and GGNS-2017-3 Proposing an Alternative for the Fourth 10-Year Inservice Testing Requirements of ASME Code for Operation and Maintenance of Nuclear Power Plant (CAC Nos. MF9749-51))
- ML073250004 + (RR ISI-3-27 - Approval to Use Alternatives to the Requirements of ASME Code for Repair/Replacement Activities Related to Performance of Structural Weld Overlays (TACs MD4580 & MD4581))
- ML051330420 + (RR No. 04-ON-015, Design Impracticality to Inspect (Tac Nos. MC5485, MC5486 and MC5487))
- ML050340377 + (RR No. 4, Limited Volumetric Examination Conducts for Nozzle-to-Shell Welds and Class 1 and 2 Piping Welds)
- ML23229A172 + (RR Pen-75 Pre-Submittal NRC Meeting Handout)
- ML12243A343 + (RR RE-ENG-3-04 to Apply Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Requirements for Examination of Class 1 and 2 Piping Welds)
- ML050700050 + (RR, (Tac MC3317))
- ML050410532 + (RR, Alternative Code of Prv Nozzle Welds for Volumetic Examination RR-04-GO-001)
- ML051460431 + (RR, Correction Letter for SR-36)
- ML051030199 + (RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875))
- ML051640350 + (RR, Later Code Edition and Addenda Use for ISI Interval)
- ML050610501 + (RR-02-003, Class 3 Hydrostatic Pressure Tests)
- ML091590627 + (RR-31 and RR-32 RAI)
- ML050530021 + (RR-34, CRD System Hydraulic Lines Structural Integrity (Tac No. MC5037 and MC5038))
- ML051320061 + (RR-38, Revised ASME ISI Interval Pursuant to 10 CFR 50.55a (a)(3)(i) (Tac No. MC6662))