Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115E353 + (Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111)
- NRC-2021-0197, Psl DSEIS Comments - 26Jan26 FPL Additional Administrative-Editorial Comments (2) + (Psl DSEIS Comments - 26Jan26 FPL Additional Administrative-Editorial Comments (2))
- ML17213A936 + (Psl Emergency Operations Facility:Floor Plan & Details. Sheet 5)
- ML17213A934 + (Psl Emergency Operations Facility:Site Plan. Sheet 1 of 19)
- ML21153A052 + (Psl SLRA Preapplication Meeting 06-03-21)
- ML17229A061 + (Psl Self-Assessment)
- ML072050175 + (Pss: Search for Private Schools)
- ML22124A035 + (Psu Afr Approval)
- ML23193A780 + (Psu Cover Letter 2022 SG)
- ML19365A059 + (Psu DFP Reviewer Work Request (Harwell Shawn))
- ML20022A072 + (Psu DFP Reviewer Work Request (Harwell Shawn))
- ML21141A005 + (Psu Project Manager Change 05202021)
- ML22060A060 + (Psu RSO Change Amendment 3)
- ML21014A099 + (Psu Review 2020 Annual SG Acceptance Review 01112021)
- ML19365A057 + (Psu Reviewer Work Request for DFA_KR_12232019)
- ML19343B384 + (Psychological Stress for Alternatives of Decontamination of the TMI-2 Reactor Building Atmosphere)
- ML20076H160 + (Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed)
- ML063060040 + (Pt. Beach Branch Chief Letter)
- ML020530557 + (Pt. Beach, Units 1 & 2 - Emergency Response Capability - Conformance to Regulatory Guide 1.97, Revision 2)
- ML17257A445 + (Ptbh Public Meeting for OL Workshop (CMS))
- ML12240A267 + (Ptn 95001 Document Request Letter Rev 1, Turkey Point)
- ML18228A492 + (Ptp - Units 3 & 4, Component Cooling System - SH.1, Outside Containment, Rev. 1)
- ML18228A493 + (Ptp - Units 3 & 4, Primary Water and Demineralized Water Systems, Rev. 1)
- ML18228A490 + (Ptp - Units 3 & 4, Sampling System and Spent Fuel Pit Cooling System, Rev. 2)
- ML18228A491 + (Ptp - Units 3 & 4, Waste Disposal System - - Liquids, Rev. 1)
- ML19211A067 + (Pu Accident Resistant Container Project)
- ML20058B399 + (Pu Air Transport Certification Program Phase 1 Final Rept, Development of Criteria for Controlled Tests for Air Transport Packages)
- ML092730263 + (Pu Plant Boiler Room)
- ML092730255 + (Pu Plant Chem. Make-Up)
- ML092730257 + (Pu Plant Exhaust Fanroom)
- ML092720435 + (Pu Plant Final Release Survey Non Production Area-Office Area)
- ML092720434 + (Pu Plant Laboratory Drain System)
- ML092730266 + (Pu Plant Non Production Office Area Piping (Tagged Lines Only))
- ML092730258 + (Pu Plant Production Hall Attic Conduit Lines and Piping)
- ML092730260 + (Pu Plant Septic Tank Drainage System)
- ML092720439 + (Pu Plant Solvent Extraction)
- ML092730259 + (Pu Plant Vault Room 126)
- ML20054D548 + (Pu-238 Concentrations in Marine Environ at San Clemente Island)
- ML20054D544 + (Pu-238 Concentrations in Marine Environ at San Clemente Island)
- ML20197D936 + (Pub Meeting in Washington DC on 781207:discussion & Vote on ALAB-500 Offshore Pwr Sys.Pp.1-18)
- ML20147C428 + (Pub Meeting in Washington DC on 781207:discussion of Policy Statement on Alternative Site Eval Under NEPA for Nuc Generating Stations.Pp 1-34)
- ML20147F441 + (Pub Meeting in Washington DC on 781207:discussion of Hearing in Tatapur.Pp.1-41)
- ML20147D185 + (Pub Meeting:Affirmation Session 78-30 on 781208 in Washington DC.Pp1-6)
- IR 05000354/2015404 + (Pub OUO-SRI-NRC Temporary Instruction 2201-004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Report 05000354 2015-404 (Letter))
- ML13303A974 + (PubMtgNotice-Nov13-2013-update)
- ML23069A013 + (Pubic Meeting Slides - Proposed Rule: Renewing Nuclear Power Plant Operating Licenses - Environmental Review (Rin 3150-AK32; NRC-2018-0296))
- ML20052H810 + (Public & Leadership Attitudes Toward Nuclear Power Development in Us)
- ML22271A128 + (Public - Application Dated 8/3/22 for Validation of French Competent Authority Certificate F/347/AF-96, Revision 2, Model No. FCC-3 Transport Package)
- ML22277A716 + (Public - Application Dated 8/3/22 for Validation of French Competent Authority Certificate F/348/AF, Revision 2, Model No. FCC-4 Transport Package)
- ML24064A195 + (Public - Audit Plan - Terrapower - Design Basis Accident Methodology for In-Vessel Events Without Radiological Release - L-2023-TOP-0050)
- ML18023A091 + (Public - Audit Report NuScale 3.9.2)