Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement
Results
Other: L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021, L-2024-109, Schedule for Subsequent License Renewal Environmental Review, ML21272A264, ML25148A213
|
MONTHYEARML21215A3142021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 Project stage: Other ML21272A2642021-10-18018 October 2021 Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement Project stage: Other ML21337A1282021-11-0303 November 2021, 16 December 2021 November 3, 2021, St. Lucie Plant, Units 1 and 2, Subsequent License Renewal Application Public Environmental Scoping Meetings Project stage: Request ML21337A1962021-12-16016 December 2021 Public Scoping Meeting Summary for the Environmental Review of the Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 Project stage: Meeting ML22039A1962022-02-0909 February 2022 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Project stage: Approval ML22101A2272022-04-25025 April 2022, 2 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Project stage: Request ML22101A2282022-04-25025 April 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Project stage: Approval ML22124A0082022-05-0505 May 2022 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review Project stage: Approval L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review Project stage: Other L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake Project stage: Request L-2025-012, Supplement to Subsequent License Renewal Application Environmental Repot2025-02-0303 February 2025 Supplement to Subsequent License Renewal Application Environmental Repot Project stage: Supplement ML25080A2092025-03-21021 March 2025 Updated Final Safety Analysis Report, Amendment 33 - Chapter 2, Site Characteristics (Public) Project stage: Request ML25078A0712025-04-0202 April 2025 Letter to Robert Coffey, St. Lucie Nuclear Plant, Units 1 and 2 -License Renewal Regulatory Audit Regarding Environmental Review of Subsequent License Renewal Application Supplement Project stage: Approval L-2025-060, Industrial Wastewater (Iww) Facility Permit Revision2025-04-15015 April 2025 Industrial Wastewater (Iww) Facility Permit Revision Project stage: Request L-2025-068, 2024 Annual Radioactive Effluent Release Report2025-04-30030 April 2025 2024 Annual Radioactive Effluent Release Report Project stage: Request L-2025-039, Annual Radiological Environmental Operating Report for Calendar Year 20242025-05-0505 May 2025 Annual Radiological Environmental Operating Report for Calendar Year 2024 Project stage: Request ML25148A2132025-06-10010 June 2025 Supplemental Audit - Letter to Applicant Project stage: Other L-2025-116, Environmental Protection Plan Report Unusual or Important Environmental Event - Manatee in Intake2025-06-25025 June 2025 Environmental Protection Plan Report Unusual or Important Environmental Event - Manatee in Intake Project stage: Request L-2025-113, Subsequent License Renewal Application Environmental Review Supplemental Environmental Audit Response to Requests for Confirmation of Information and Requests for Additional Information2025-07-0808 July 2025 Subsequent License Renewal Application Environmental Review Supplemental Environmental Audit Response to Requests for Confirmation of Information and Requests for Additional Information Project stage: Supplement ML25349A1622025-12-15015 December 2025 EIS for License Renewal of Nuclear Plants, Supplement 11, 2nd Renewal Re Subsequent License Renewal St. Lucie Plant, Units 1, 2, Draft Report for Comment Project stage: Draft Other ML25267A0082025-12-22022 December 2025 Letter to Robert Coffey Notice of Availability of Environmental Impact Statement Re Subsequent License Renewal of St. Lucie Plant Draft Report for Comment Project stage: Draft Other NRC-2021-0197, Psl DSEIS Comments - 26Jan26 FPL Additional Administrative-Editorial Comments (2)2026-02-25025 February 2026 Psl DSEIS Comments - 26Jan26 FPL Additional Administrative-Editorial Comments (2) Project stage: Request 2025-12-22
[Table View] |
Text
PSL DSEIS COMMENT FORM Page l 1 No.
Section Page Line Comment Commenter Comment Classification Administrative/Editorial Substantive
- 1.
3.2.1 3-6 38-43 There is no reference for the information listed regarding the surficial aquifer. Much of this information is reported in the SLR ER (FPL 2021-TN12166) in Sections 3.6.2.1, 3.6.2.5, and 3.6.4.2.
JM X
- 2.
Appendix C
C-8 4-5 An acronym for the Florida Fish and Wildlife Conservation Commission (FWC) is defined later in Appendix C (pg. C-25, line 27). Suggest defining here since it is first use and change all subsequent mentions of Florida Fish and Wildlife Conservation Commission to FWC.
JH X
- 3.
3.7.2 3-38 13-14 The citation (FPL 2025-TN12487) should be moved to after the sentence, There have been no thermal limit exceedances since the submittal of the St. Lucie subsequent license renewal ER, because this is where the information is included, rather than in the citation (FPL 2021-TN12166) as implied by current placement.
EK X
- 4.
2.1 2-1 22-23 Section 2.1 states information from Section 2.2 of the ER, which is an incorrect reference for the numbers presented, i.e. the megawatts-electric (MWe) output is not stated correctly:
ER Page 2-2 and states: The maximum potential cold winter electrical output is approximately 1,052 MWe for Unit 1 and 1,072 MWe for Unit 2 (NRC 2012a, Section 2.3.1).
DSEIS page 2-1: Each steam and power conversion system, including its turbine 21 generator, is designed to permit generation of a gross electrical output of approximately 1,026 megawatts-electric (MWe) for Unit 1 and 1,045 MWe for Unit 2.
LS X
- 5.
3.2.1 3-6 5-6 For clarity and to align with ER, suggest add to the end of the sentence on lines 5-6 and Big Mud Creek to the north.
The DSEIS states: The St. Lucie site is bounded by the Atlantic Ocean to the east and Indian River Lagoon to the west.
LS X
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.