Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154P601 + (Provides Update to Licensee Re Initiatives for Identifying & Correcting FSAR Discrepancies.Completion Date for Remaining FSAR Question & Response Reviews Has Been Extended Until 990401)
- NRC-98-0058, Provides Update to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, + (Provides Update to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions,)
- ML20236H103 + (Provides Update to List Re Plants Affected by Fuel Rod Internal Pressure Issues)
- BECO-90-149, Provides Update to Long Term Program,Per Section V.A of Plan for Long Term Program - Pilgrim Nuclear Station + (Provides Update to Long Term Program,Per Section V.A of Plan for Long Term Program - Pilgrim Nuclear Station)
- RBG-43159, Provides Update to NRC Project Manager TAC Rept & Licensee Implementation Dates for Completed Actions on TAC List + (Provides Update to NRC Project Manager TAC Rept & Licensee Implementation Dates for Completed Actions on TAC List)
- ML20205G282 + (Provides Update to NRC Staff on Implementation of Commitments to Address Instrument Uncertainties at Waterford 3 Ses)
- L-94-148, Provides Update to NRC on Items Completed Re Util Cycle 14 Refueling Outage + (Provides Update to NRC on Items Completed Re Util Cycle 14 Refueling Outage)
- L-95-307, Provides Update to NRC on Items Completed by Util at Plant During Cycle 15 Refueling Outage + (Provides Update to NRC on Items Completed by Util at Plant During Cycle 15 Refueling Outage)
- ML20205D563 + (Provides Update to NRC on Planned Industry Tasks to Address Thermal Fatigue Cracking in non-isolatable Small Diameter SI Piping in Pressurized Water Reactor Plants)
- ML20246C960 + (Provides Update to Original Region I Assessment & Recommendation for Issuance of Low Power OL for Plant. Advises That Region I Continues to Recommend Low Power OL Issuance for Plant W/Special Note of Items Listed)
- PY-CEI-NRR-1722, Provides Update to Page 55 of Emergency Response Data Sys Data Point Library Submitted by Ltr + (Provides Update to Page 55 of Emergency Response Data Sys Data Point Library Submitted by Ltr)
- ML18038B229 + (Provides Update to RPV Matl & Fluence Data Provided in Util Response to NRC GL 92-01,dtd 920707)
- ML17258A283 + (Provides Update to Re Containment Purge & Vent Valves.Valves Will Remain Closed While Plant Is Critical Until Travel Stops Can Be Adjusted to Limit Valve Opening Angle to 40 Degrees Instead of 50 Degrees)
- ML20217N952 + (Provides Update to Re Insurance.Listed Info Provides Levels & Sources of Insurance Coverage for LGS & PBAPS)
- ML20023D919 + (Provides Update to Re Mods Proposed to Support App R Exemption Requests,Based on 830523 Insp of Unit 2 A05 & A06 Switchgear Cabinets)
- PY-CEI-NRR-1126, Provides Update to Re Performance of Seismic Margin Evaluation.Util Awaiting Issuance of Individual Plant Exams of External Events Generic Ltr Prior to Proceeding W/ Seismic Margins Study + (Provides Update to Re Performance of Seismic Margin Evaluation.Util Awaiting Issuance of Individual Plant Exams of External Events Generic Ltr Prior to Proceeding W/ Seismic Margins Study)
- ML20066D608 + (Provides Update to Re Progress in Implementing Action Item II of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment)
- ML20099G114 + (Provides Update to Re Soil Erosion Control & Stabilization Projects.Revegetation of Portion of Site East of Oyster Creek Completed on 840927.Area West of Oyster Creek to Be Completed in 1985,per Insp Rept 50-219/80-02)
- RBG-21603, Provides Update to Re Status of & Justification for Activities Projected for Completion Beyond Initial Fuel Loading.Items A1,A2,B1, & B10 in Will Be Completed by 850731 + (Provides Update to Re Status of & Justification for Activities Projected for Completion Beyond Initial Fuel Loading.Items A1,A2,B1, & B10 in Will Be Completed by 850731)
- BSEP-96-0354, Provides Update to Request for Exemption to 10CFR50,App R & Up & Addl Info on thermo-lag Issues + (Provides Update to Request for Exemption to 10CFR50,App R & Up & Addl Info on thermo-lag Issues)
- ML17264B054 + (Provides Update to Response to NRC RAI Re Adequacy & Availability of Design Bases Info Per 10CFR50.54(f))
- VPN-044-98, Provides Update to Response to Violations Noted in Insp Rept 50-344/97-03.Corrective Actions:Completed Resurvey of Selected Areas of Surveyed ISFSI Area + (Provides Update to Response to Violations Noted in Insp Rept 50-344/97-03.Corrective Actions:Completed Resurvey of Selected Areas of Surveyed ISFSI Area)
- LD-89-111, Provides Update to Rev 4 of Physical Security Plan Amend Submitted on 890420.Encl Withheld (Ref 10CFR2.790(d)) + (Provides Update to Rev 4 of Physical Security Plan Amend Submitted on 890420.Encl Withheld (Ref 10CFR2.790(d)))
- ML20236H879 + (Provides Update to Schedule for Completion of Digital Upgrade to Radiation Monitoring Sys.Current Schedule for Completing Digital Upgrades to Unit 2 Cpis Gas Channel Monitors Is at End of Calendar Year 1999)
- GO2-91-221, Provides Update to Setpoint Methodology Program,Per .Advises That to date,53 of 58 Calculations (Approx 250 Equipment Pieces) Have Been Completed by Contractor & 28 of 53 Calculations Have Been Approved + (Provides Update to Setpoint Methodology Program,Per .Advises That to date,53 of 58 Calculations (Approx 250 Equipment Pieces) Have Been Completed by Contractor & 28 of 53 Calculations Have Been Approved)
- ML17312B222 + (Provides Update to Spent Fuel Pool Survey Commitments)
- B14697, Provides Update to Staff W/Respect to Completion Schedule of MOV Testing Program at Hnpp & Mnps Units 1-3 Being Implemented Per GL-89-10 + (Provides Update to Staff W/Respect to Completion Schedule of MOV Testing Program at Hnpp & Mnps Units 1-3 Being Implemented Per GL-89-10)
- B17121, Provides Update to Staff on Standardized Surveillance Program Submitted in Licensee .Util Closes Out Commitment B16109-2 Re Passport Against Pmms/Access.Addl Commitments Made by Util,Encl + (Provides Update to Staff on Standardized Surveillance Program Submitted in Licensee .Util Closes Out Commitment B16109-2 Re Passport Against Pmms/Access.Addl Commitments Made by Util,Encl)
- 0CAN118214, Provides Update to Status Rept & Description of Progress Made in Area of Drawing Control Submitted on 820630.Next Status Rept Expected in Approx 6 Months + (Provides Update to Status Rept & Description of Progress Made in Area of Drawing Control Submitted on 820630.Next Status Rept Expected in Approx 6 Months)
- U-601817, Provides Update to Status of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment + (Provides Update to Status of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment)
- ML20078S472 + (Provides Update to Status of WNP-3 Project)
- U-602951, Provides Update to Summary Provided in Util Ltr U-602940. Condition Rept 1-98-02-448 Initiated to Track Investigation & Corrective Actions for Failure to Update State of Il as Required by EC-07 + (Provides Update to Summary Provided in Util Ltr U-602940. Condition Rept 1-98-02-448 Initiated to Track Investigation & Corrective Actions for Failure to Update State of Il as Required by EC-07)
- ML20083L525 + (Provides Update to Table of Sbwr Test Documentation Submittals & Table A.2-2 of Attachment to)
- ML19332E256 + (Provides Update to Util Detailing Action Plan Developed to Respond to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Items 1 & 2 Completed & Item 3 Will Be Completed Apr 1990)
- 0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance + (Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance)
- ML17261B088 + (Provides Update to Util Re Implementation of NUREG-0737,Item 6.2,Suppl 1, Emergency Response Capability)
- BSEP-95-0659, Provides Update to Util Request for Exemption to 10CFR50,App R & Addl Info Re Thermo-Lag Issues + (Provides Update to Util Request for Exemption to 10CFR50,App R & Addl Info Re Thermo-Lag Issues)
- JSP-412-90, Provides Update to Util Response to Item 1 of Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping + (Provides Update to Util Response to Item 1 of Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping)
- U-602961, Provides Update to Util Response to NRC 961009 RAI Re Adequacy & Availability of Design Bases Info at CPS + (Provides Update to Util Response to NRC 961009 RAI Re Adequacy & Availability of Design Bases Info at CPS)
- L-97-163, Provides Update to Written Notice of Claim Involving Alleged Bodily Injury Arising Out Of,Or in Connection With,Use of Radioactive Matl at Plant.Case Was Dismissed by Us District Court on 970606 + (Provides Update to Written Notice of Claim Involving Alleged Bodily Injury Arising Out Of,Or in Connection With,Use of Radioactive Matl at Plant.Case Was Dismissed by Us District Court on 970606)
- ML20203H505 + (Provides Update to to F Miraglia Re Restructuring Issues)
- ML13316A188 + (Provides Update to to WT Russell Re Restructuring Issues That Affect SONGS)
- ML17299A758 + (Provides Updated & Addl Info Re 851113 Request for Partial Schedular Exemption to GDC 4.Partial Exemption Requested for Period Ending W/Completion of Second Refueling Outage or Adoption of Proposed Rulemaking for Mod of GDC 4)
- ML20065R297 + (Provides Updated & Addl Info for BVPS Unit 2 in Accordance W/Suppl 6 of GL 89-10.Completion Status of BVPS Unit 2 GL 89-10 Program & List of GL 89-10 MOVs Determined to Not Be Practicable to Be Dynamically Tested in Situ Encl)
- 3F1295-27, Provides Updated Action Plan Re NRC Notice of Violation & Proposed Imposition of Civil Penalty + (Provides Updated Action Plan Re NRC Notice of Violation & Proposed Imposition of Civil Penalty)
- LIC-93-0200, Provides Updated Assessment for Reaching 10CFR50.61 PTS Screening Criterion for FCS Re Beltline Matl + (Provides Updated Assessment for Reaching 10CFR50.61 PTS Screening Criterion for FCS Re Beltline Matl)
- U-601099, Provides Updated Corrective Actions to Improve Maint & Quality Programs.Describes New Maint Improvement Program Initiated & long-term Action Items + (Provides Updated Corrective Actions to Improve Maint & Quality Programs.Describes New Maint Improvement Program Initiated & long-term Action Items)
- ML20002C596 + (Provides Updated Description of Corrective Action Re Problem W/Emergency Condenser Noted in .Weld Repairs Completed & Water Box Divider Plates Replaced.Cracks in Divider Plate Bolting Matl Found & Will Be Repaired)
- ML19220B380 + (Provides Updated Distribution List for Environ Rept Suppls & Amends)
- ML20129A630 + (Provides Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator,Per Discussions W/Nrc)
- ML20129A633 + (Provides Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator,Per Discussions W/Nrc)