Provides Update to Spent Fuel Pool Survey Commitments
ML17312B222
Person / Time
Site: Palo Verde  
Issue date: 02/05/1997
From: Ide W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03860-WEI-A, 102-3860-WEI-A, NUDOCS 9702120071
Download: ML17312B222 (4)


Text

CATEGORY j.

REGULA/

INFORMATION DZSTRIBUTZO1ZSTEM (RIDE)

ACCESSION NBR:970 d'ACIL:SQN;50-528 STN-50-529 STN-50-530 AUTH.NAME IDE,W.E.

RECIP.NAME DOCKET I 05000528 05000529 05000530 2120071 DOC.DATE: 97/02/05

'NOTARIZED: NO Palo Verde Nuclear Stat'ion, Unit 1, Arizona Publi Palo Verde Nuclear 'Station, Unit 2, Arizona Publi Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co. (formerly Arizona Nuclear Power RECIPIENT A'FFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides update to spent fuel pool survey commitments.

DISTRIBUTION CODE:

AOOZD COPIES RECEIVED:LTRI ENCL 0 SIZE:

TITLE:

OR Submittal: General Distribution NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 E

05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORDFJ INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL:'OAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 4IS-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL

P,,g, 0

Cammttme J. Innovrt/on. &ergy.

Palo Verde Nuclear Generating Station WilliamE. Ide Vice President Nuclear Engineering TEL 602/3936116 FAX 602/3936077 Mail Station 7616 P.O. Box 52034 Phoenix, AZ 85072-2034 102-03860-WEI/AKK/RKR February 5, 1997 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Reference:

Letter (102-03750) dated August 6, 1996, from William S. Stewart, APS, to NRC, "Spent Fuel Pool Survey Commitments"

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Update to Spent Fuel Pool Survey Commitments In the referenced letter, APS provided projected completion dates for committed actions resulting from the spent fuel pool survey.

Commitments were made to include routine monitoring of the spent fuel pool cooling system in the appropriate plant monitoring programs by December 31, 1996 and to review the Updated Final Safety Analysis Report (UFSAR) and correct any discrepancies or inconsistencies between plant procedures and the UFSAR pertaining to the spent fuel pool cooling system by January 31, 1997.

The spent fuel pool cooling heat exchangers are being monitored as part of the PVNGS heat exchanger monitoring procedure.

The procedure for testing of the spent fuel cooling system valves will be issued by February 15, 1997.

Initial monitoring of the spent fuel pool cooling system pumps, performed in 1996 using an external flow monitoring system, did not provide consistent results that could be used for performance monitoring.

There is no permanently installed flow measurement instrumentation for the spent fuel pool cooling system pumps.

Additional testing using an external flow monitoring device will be completed by March 31, 1997. At that time, APS engineering willdetermine ifthe external flow monitoring device can be used for performance monitoring. Ifthis course of action is not successful, an alternate plan of action willbe developed for monitoriqg;pump performance.

970212007i 970205 PDR ADQCK 05000528 P

PDR

U.S Nuclear Regulatory Commission Update to'Spent Fuel Pool Survey Commitments Page 2 The review of the plant procedures and the UFSAR pertaining to the spent fuel pool cooling system has been completed.

It was determined that an UFSAR change is required to correct the discrepancy between the UFSAR and procedures regarding the number of fuel pool cooling pumps for various conditions.

The UFSAR change correcting this discrepancy will be completed prior to the start of the next refueling outage (Unit 3, scheduled to start February 22, 1997).

An UFSAR change will also be processed to enhance the consistency between actual plant operation and UFSAR descriptions pertaining to the spent fuel pool. This change is being developed and is expected to be completed by April 30, 1997.

Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.

WEI/AKK/RKR/mah CC:

L. J. Callan K. E. Perkins J. W. Clifford K. E. Johnston A. V. Godwin (ARRA)

0

~~