_ VPNPD 013 NRC 002 January 4, 1991 Document Control Desk U.
S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC-20555 Gentlemen:
DOCKETS 50-266 AND 50-301 UPDATE-ON GENERIC LETTER 89-13 SPENT FUEL POOL HEAT EXCHANGERS POINT BEACH NUCLEAR PLANT In a letter dated November 15, 1990, we provided the NRC staff with aniupdate concerning our-progress in implementing selective actions in response to Action Item II-of Generic Letter 89-13, " Service Facer System-Problems Affecting Safety-Related Equipment."
In that letter we noted that our schedule to instrument the spent fuel pool coolingLsystem heat exchanger to monitor heat transfer capability-was delayed until the end-of 1990.
This letter is to notify you that this modification has now been completed.
Weialso would like to take this opportunity to correct a misleading statement we made in the-November 15 letter concerning these heat
-exchangers. :We' stated-in that-letter that the spent fuel pool cooling system heat exchangers~were inspected in 1990 for the first time after-nearly twenty years of operation.
This is an inaccurate statement.-
These' heat exchangers were installed during;a spent fuel--pool cooling system upgrade in 1977 and first placed in
'9101150226 910104 ADOCK0500g6 PDR g[
P
.1fTV l""* "~""" ""'" ~""'""
'IO
,f f.
Document-Control Desk January 4,-1991 Page 2 i
i service in February 1978.
Therefore, they have been in service for-nearly thirteen, not twenty, years.
While we regret this misstatement, we still concluded that the schedule delay we
. proposed in instrumenting these heat exchanger had no impact-on the operability.of;the spent fuel pool cooling system.
Very.truly yours,
/
h (:l C..W.
Fay ~
Vice President Nuclear Power Copy to:
NRC Resident Inspector NRC Regional Administrator i