Provides Update to Re Progress in Implementing Action Item II of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment
ML20066D608
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/04/1991
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-91-002, CON-NRC-91-2 GL-89-13, VPNPD-91-013, VPNPD-91-13, NUDOCS 9101150226
Download: ML20066D608 (2)


Text

...... _....

_A 5

f Wisconsin Electnc POWER COMPANY i

231 w uchyst Po ikw 2046 wwoukee. Wi 5320i M M) 220 *S

_ VPNPD 013 NRC 002 January 4, 1991 Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC-20555 Gentlemen:

DOCKETS 50-266 AND 50-301 UPDATE-ON GENERIC LETTER 89-13 SPENT FUEL POOL HEAT EXCHANGERS POINT BEACH NUCLEAR PLANT In a letter dated November 15, 1990, we provided the NRC staff with aniupdate concerning our-progress in implementing selective actions in response to Action Item II-of Generic Letter 89-13, " Service Facer System-Problems Affecting Safety-Related Equipment."

In that letter we noted that our schedule to instrument the spent fuel pool coolingLsystem heat exchanger to monitor heat transfer capability-was delayed until the end-of 1990.

This letter is to notify you that this modification has now been completed.

Weialso would like to take this opportunity to correct a misleading statement we made in the-November 15 letter concerning these heat

-exchangers. :We' stated-in that-letter that the spent fuel pool cooling system heat exchangers~were inspected in 1990 for the first time after-nearly twenty years of operation.

This is an inaccurate statement.-

These' heat exchangers were installed during;a spent fuel--pool cooling system upgrade in 1977 and first placed in

'9101150226 910104 ADOCK0500g6 PDR g[

P

.1fTV l""* "~""" ""'" ~""'""

'IO

,f f.

Document-Control Desk January 4,-1991 Page 2 i

i service in February 1978.

Therefore, they have been in service for-nearly thirteen, not twenty, years.

While we regret this misstatement, we still concluded that the schedule delay we

. proposed in instrumenting these heat exchanger had no impact-on the operability.of;the spent fuel pool cooling system.

Very.truly yours,

/

h (:l C..W.

Fay ~

Vice President Nuclear Power Copy to:

NRC Resident Inspector NRC Regional Administrator i