Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed Tech Specs Supporting Cycle 3 Reload". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19255C443  + (Proposed Tech Specs Supporting Amend to License DPR-50,App A,Implementing Branch Technical Position Csb 6-4 Item B.4, Providing for Leak Rate Testing of Purge/Vent Sys Isolation Valves)
  • ML20054L453  + (Proposed Tech Specs Supporting Amend to License DPR-34 to Release Facility from 70% Power Restriction)
  • ML20076F393  + (Proposed Tech Specs Supporting Amend to License NPF-3 Re Leak Rate Requirement for Containment Purge & Exhaust Isolation Valves)
  • ML18025B736  + (Proposed Tech Specs Supporting Amend to Licenses DPR-33, DPR-53 & DPR-68 Re Operation at Reduced Power W/Single Recirculation Loop in Svc.Bases & Justification Encl)
  • ML18025B694  + (Proposed Tech Specs Supporting Application to Amend License Re Modified Electrical Distribution Sys)
  • ML18087A526  + (Proposed Tech Specs Supporting Application to Amend Licenses DPR-70 & DPR-75,revising Core Limits,Fractional Power Factor Limit,Performance of RCS Water Inventory Balance & Boron Concentration & Contained Vol Limits)
  • ML20210T679  + (Proposed Tech Specs Supporting Application for Amend to Licenses DPR-53 & DPR-69,including Revised Surveillance Requirement 4.4.10.1.2, Augmented Inservice Insp Program for Main Steam & Main Feedwater Piping)
  • ML20196A730  + (Proposed Tech Specs Supporting Application for Amends to Licenses DPR-66 & NPF-73)
  • ML18100A417  + (Proposed Tech Specs Supporting Boron Concentration Reduction)
  • ML20196B530  + (Proposed Tech Specs Supporting Change 134 Re Main Steam Excess Flow Check Valve & Turbine Valve Testing Frequency)
  • ML20056G492  + (Proposed Tech Specs Supporting Change in Calculated Peak Fuel Cladding Temp)
  • ML20045G842  + (Proposed Tech Specs Supporting Change in Frequency for Submittal of Radioactive Effluent Release Repts from Semiannual to Annual & Extension of Preparation Period from 60 Days to 90 Days)
  • ML20065A867  + (Proposed Tech Specs Supporting Change in Frequency for Submitting Semiannual Effluent Release Rept to NRC from Semiannually to Annually)
  • ML20046D167  + (Proposed Tech Specs Supporting Change of Superintendent Titles to Manager)
  • ML20154H818  + (Proposed Tech Specs Supporting Changes to Plant Rets,App B)
  • ML20056D700  + (Proposed Tech Specs Supporting Compliance W/Requirements of 10CFR20 by Replacing Existing Pages W/Pages 3-12,3-14,3-96, 3-100,3-106,3-110,3-111,3-119,3-119a,6-12a,6-20,6-21 & 6-22)
  • ML20046D196  + (Proposed Tech Specs Supporting Compliance W/New Requirements of 10CFR20 & 10CFR50.36a)
  • ML17326B159  + (Proposed Tech Specs Supporting Continued Full Power Operation of Cycle 5 Reload)
  • ML17324B291  + (Proposed Tech Specs Supporting Cycle 10 Reload.Proprietary Safety Evaluation Withheld)
  • ML20236U418  + (Proposed Tech Specs Supporting Cycle 10 Reload)
  • ML17325A963  + (Proposed Tech Specs Supporting Cycle 11 Fuel Cycle,Which Will Incorporate Operation of Unit at Reduced Temps & Pressures W/Intent of Reducing Steam Generator U-tube Stress Corrosion Cracking)
  • ML20155D019  + (Proposed Tech Specs Supporting Cycle 12 Reload)
  • B12537, Proposed Tech Specs Supporting Cycle 15 Operation & Reflecting Upgraded Methods for Analysis of non-LOCA Events  + (Proposed Tech Specs Supporting Cycle 15 Operation & Reflecting Upgraded Methods for Analysis of non-LOCA Events)
  • B13520, Proposed Tech Specs Supporting Cycle 16 Operation  + (Proposed Tech Specs Supporting Cycle 16 Operation)
  • ML17304A996  + (Proposed Tech Specs Supporting Cycle 3 Operation of Facility)
  • ML20235U783  + (Proposed Tech Specs Supporting Cycle 3 Reload)
  • B13627, Proposed Tech Specs Supporting Cycle 4  + (Proposed Tech Specs Supporting Cycle 4)
  • ML20215N886  + (Proposed Tech Specs Supporting Cycle 6 Operation)
  • ML17285B201  + (Proposed Tech Specs Supporting Cycle 6 Reload & Operation of Lead Fuel Assemblies During Feedwater Temp Reduction Anticipated in Cycle 6)
  • ML20210S995  + (Proposed Tech Specs Supporting Cycle 8 Operation)
  • ML20247B818  + (Proposed Tech Specs Supporting Cycle 9 Reload Application)
  • ML20209G546  + (Proposed Tech Specs Supporting Detect & Suppress Stability Surveillance Region for Cycle 2)
  • ML20045H717  + (Proposed Tech Specs Supporting Drywell Pressure/Temp Change)
  • ML20035B964  + (Proposed Tech Specs Supporting Expanded Operating Domain)
  • ML20043G473  + (Proposed Tech Specs Supporting Fuel Cycle 8 Reload Licensing)
  • ML17345B117  + (Proposed Tech Specs Supporting Fuel Design Change from Westinghouse Low Parasitic Fuel Assembly to Optimized Fuel Assembly & Use of New Westinghouse Wet Annular Burnable Absorber Rods)
  • ML20084C940  + (Proposed Tech Specs Supporting Fuel Enrichment Increase)
  • ML20198G748  + (Proposed Tech Specs Supporting General Atomics Pending Request for Possession Only License Amend Request to Triga Mark I Reactor License R-38)
  • ML17290A965  + (Proposed Tech Specs Supporting Hydrostatic Testing)
  • ML20085N099  + (Proposed Tech Specs Supporting Implementation of BWR Thermal Hydraulic Stability Solution)
  • ML17228A222  + (Proposed Tech Specs Supporting Implementation of New Stds for Protection Against Radiation)
  • ML20058L682  + (Proposed Tech Specs Supporting Implementation of Revised 10CFR20)
  • ML20070N461  + (Proposed Tech Specs Supporting Implementation of Proposed Mod 5274 to Replace Unit 2 Containment Atmospheric Dilution Sys & Containment Atmospheric Control Sys Analyzers)
  • ML20154H653  + (Proposed Tech Specs Supporting Improvements to Sections 3.0.4,4.0.3 & 4.0.4 & Deleting Numerous Tech Spec Statements Which Presently Take Exception to Provisions of Spec 3.0.4)
  • ML20011A839  + (Proposed Tech Specs Supporting Inclusion of Technical Advisor & Recent Organizational Changes)
  • ML20045C171  + (Proposed Tech Specs Supporting Increased Fuel Enrichment Limit)
  • ML20236P753  + (Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18)
  • ML17216A324  + (Proposed Tech Specs Supporting Installation of safety-grade Automatic Feedwater Sys During Upcoming Refueling Outage)
  • ML20235Z795  + (Proposed Tech Specs Supporting License Change Application 58 to License NPF-1 Re Reactivity Control Sys Rod Drop Time)
  • ML20236S146  + (Proposed Tech Specs Supporting Mods to Standby Liquid Control Sys Being Implemented to Comply w/10CFR50.62 & Correcting Ref Made to Figure in Tech Specs Deleted as Result of Proposed Amend)
  • B13208, Proposed Tech Specs Supporting Operation of Cycle 15  + (Proposed Tech Specs Supporting Operation of Cycle 15)