Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138H852 + (Proposed Tech Specs,Submitting Rev to Original TS Change Request to Reduce Limit Specified in Section 3.1.6.3.b for Leakage Through SG Tubes of Any One Sg,Per SG Tube Insp Surveillance Requirements)
- ML18038B865 + (Proposed Tech Specs,Submitting Revised BFN TS Bases Section 3.5.N, References, Reflecting Updated LOCA Analyses for Units 2 & 3)
- ML17291B249 + (Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59)
- ML20138K971 + (Proposed Tech Specs,Submitting Suppl Info to STP Proposed Improved TS)
- ML20116J315 + (Proposed Tech Specs,Submitting TS Bases Pages for Revs Performed Since 951001 Approval of TS Bases)
- ML20135B058 + (Proposed Tech Specs,Submitting Update to Administrative Controls Section of TS Which Reflects Transition of Overall Corporate Responsibility for Storage of Spent Nuclear Fuel)
- ML20134M052 + (Proposed Tech Specs,Submitting follow-up Info Re Snubbers TS Bases Change)
- ML17346A854 + (Proposed Tech Specs,Substituting Linear Rampdown of Allowable Moderator Temp Coefficient Instead of Current Step Change at 70% Power)
- ML20235U472 + (Proposed Tech Specs,Superceding 870925 Submittal to Better Clarify Main Steam Trip Valve Full Closure Test Acceptance Criteria.Discussion of Proposed Change Also Encl)
- ML20135F044 + (Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves)
- ML20245G436 + (Proposed Tech Specs,Suporting Removal RCS Hot Leg & Cold Leg Resistance Temp Detector Bypass Sys)
- ML20132F000 + (Proposed Tech Specs,Supplementing Amend Request to Change Surveillance 4.8.2.1.2.e Which Will Achieve Alignment W/ Improved STS SR 3.8.4.8)
- ML20097B447 + (Proposed Tech Specs,Supplementing Amend Request Supporting Implementation of performance-based Containment Lrt Requirements)
- ML20216H110 + (Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal)
- ML20106G823 + (Proposed Tech Specs,Supplementing LAR-95-007,revising TS LCO 3.9.4 to Allow Both Doors of Personnel Airlock to Remain Open as Long as One Pal Door Capable of Being Closed)
- ML20195F953 + (Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01)
- ML17292A151 + (Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls)
- ML20211J233 + (Proposed Tech Specs,Supplementing thermal-hydraulic Analysis Included as License Rept in 930326 to Murley)
- ML18064A736 + (Proposed Tech Specs,Supporting Action Statements for Inoperable Safety Valves in Proposed Specs 3.1.7 of TS Change Request of 950103)
- ML20108D117 + (Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day)
- ML20101H674 + (Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day)
- ML20115F030 + (Proposed Tech Specs,Supporting Change in Refueling Cycles from 18 Months to 24 Months)
- ML20216E456 + (Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409)
- ML20117P531 + (Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle)
- ML20069A678 + (Proposed Tech Specs,Supporting Cycle 10 Control Rod Trip Insertion Time Testing)
- ML19354E691 + (Proposed Tech Specs,Supporting Cycle 13 Operation)
- B13292, Proposed Tech Specs,Supporting Cycle 16 + (Proposed Tech Specs,Supporting Cycle 16)
- ML20211H223 + (Proposed Tech Specs,Supporting Implementation of Noble Metal Chemical by Raising Reactor Water Conductivity Limit in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b)
- ML20195H375 + (Proposed Tech Specs,Supporting Implementation of Relaxed Power Distribution Control Methodology)
- ML20206C373 + (Proposed Tech Specs,Supporting Inadequate Core Cooling Instrumentation Sys,Per NUREG-0737)
- ML20236W220 + (Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys)
- ML20082C007 + (Proposed Tech Specs,Supporting Main Stack & Vent Stack Radiation Monitoring Sys Upgrades)
- ML20117G589 + (Proposed Tech Specs,Supporting NRC Approval of Deletion of Requirements to Maintain Upper Head Injection Sys)
- ML18064A613 + (Proposed Tech Specs,Supporting One Time Deferral of Refueling Interval Surveillance Tests)
- ML20147F550 + (Proposed Tech Specs,Supporting Operation of Units at Containment Air Temp Up to 120 F W/Lower Initial Refueling Water Storage Tank Water Vol)
- ML17334B595 + (Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt)
- ML20196B918 + (Proposed Tech Specs,Supporting Operation of Plant W/Revised Heatup & Cooldown Curves Valid to 10 EFPY)
- ML20148N481 + (Proposed Tech Specs,Supporting Operation of Unit During Cycle 10 by Changing MAPLHGR Limits for Reload Fuel & Adjustment of Min Critical Ratio)
- ML20198J980 + (Proposed Tech Specs,Supporting Operation W/One Recirculation Loop Out of Svc)
- ML20205S024 + (Proposed Tech Specs,Supporting Plant Uprating to 3,565 Mwt Core Power Level.Supporting Documentation Encl)
- ML20077D247 + (Proposed Tech Specs,Supporting Realignment of Organizational Structure)
- ML18009A914 + (Proposed Tech Specs,Supporting Realignment to Organizational Structure)
- ML17199U411 + (Proposed Tech Specs,Supporting Refueling & Startup for Cycle 11 Operation in June 1988)
- ML20248J493 + (Proposed Tech Specs,Supporting Reload 1,Cycle 2 for Plant Operations)
- ML20149F397 + (Proposed Tech Specs,Supporting Reload Core for Unit 1 Cycle 10 & Changing Figures to Broaden Range of Core Operability at Lower Power Levels Re Axial Shape Offset Limits for Unit 2)
- ML20070M990 + (Proposed Tech Specs,Supporting Renewal of License R-97)
- ML20091M624 + (Proposed Tech Specs,Supporting Revised 10CFR20)
- ML20148U192 + (Proposed Tech Specs,Supporting Second Reload for Plant)
- ML20115A550 + (Proposed Tech Specs,Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints)
- ML17342B122 + (Proposed Tech Specs,Taking Current Requirement for Safety Injection Accumulators & Consolidating Requirements Into One Limiting Condition for Operation Section & One Surveillance Section)
- ST-HL-AE-3756, Proposed Tech Specs,Transferring Cycle Specific Parameter Limits to Existing Core Operating Limits Rept + (Proposed Tech Specs,Transferring Cycle Specific Parameter Limits to Existing Core Operating Limits Rept)