Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed TS 3/4.8.1 Re Ac Sources". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20098D725  + (Proposed TS 3/4.6.5.3 Re Ice Condenser Doors)
  • ML17352A732  + (Proposed TS 3/4.7.1 & Associated Bases Addressing Operation at Reduced Power Levels W/Inoperable Main Steam Safety Valves)
  • B14461, Proposed TS 3/4.7.1 Re self-actuation & Remote Actuation Function of Safety Valves & Table 3.7-1, Steam Line Safety Valves Per Loop  + (Proposed TS 3/4.7.1 Re self-actuation & Remote Actuation Function of Safety Valves & Table 3.7-1, Steam Line Safety Valves Per Loop)
  • ML20029C846  + (Proposed TS 3/4.7.1, Turbine Cycle Safety Valves)
  • ML20073D529  + (Proposed TS 3/4.7.1, Turbine Cycle, Increasing as-found Setpoint Tolerance of MSSVs)
  • ML17352A834  + (Proposed TS 3/4.7.1.1 & Associated Bases,Addressing Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs)
  • ML20012G597  + (Proposed TS 3/4.7.1.1, Main Steam Safety Valves)
  • ML20126A895  + (Proposed TS 3/4.7.1.1, Shutdown Svc Water Sys (Loops A,B & C) & TS 3/4.7.2, CR Ventilation Sys)
  • ML17331B160  + (Proposed TS 3/4.7.1.5, SG Stop Valves)
  • ML20128B088  + (Proposed TS 3/4.7.1.6 Re Main Feedwater Isolation Sys)
  • ML20149J349  + (Proposed TS 3/4.7.1.6 Re SG Atmospheric Relief Bypass Valve Lines)
  • ML20115E804  + (Proposed TS 3/4.7.11,revising Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room)
  • ML20126K788  + (Proposed TS 3/4.7.2 Re CR Emergency Filtration sys,3/4.7.3 Re Flood Protection & 3/4.7.4 Re RCIC Sys)
  • ML20127H194  + (Proposed TS 3/4.7.2 Re Control Room Emergency Ventilation Sys & TS Table 3.3.5.5-1, Control Bldg Emergency Ventilation Sys Instrumentation)
  • ML20034F527  + (Proposed TS 3/4.7.3 Re Primary Component Cooling Water Sys)
  • ML17290A184  + (Proposed TS 3/4.7.3 Re RCIC Sys Under Emergency Circumstances)
  • ML20141M095  + (Proposed TS 3/4.7.6 Re Control Room Area Ventilation Sys & 3/4.7.5 Re Standby Nuclear Svc Water Pond)
  • ML20113H631  + (Proposed TS 3/4.7.6 Re Heater Dissipation Rate & 3/4.7.7 Re Nonaccessible Area Exhaust Filter Plenum Sys)
  • ML20092H812  + (Proposed TS 3/4.7.7 Re Auxiliary Bldg Filtered Ventilation Sys Exhaust Sys)
  • ML20087A426  + (Proposed TS 3/4.7.8 Re Snubber Visual Surveillance/Insp Requirements)
  • ML17331A026  + (Proposed TS 3/4.7.9 Re Fire Suppression Water Sys & TS 4.7.9.1.1 Re SR for Fire Suppression Water Sys)
  • ML18100A334  + (Proposed TS 3/4.8 Re LCO & SR for Ac Sources/Electrical Power Sys & Onsite Power Distribution Sys)
  • ML20126A391  + (Proposed TS 3/4.8, Electrical Power Sys)
  • ML20012G560  + (Proposed TS 3/4.8, Electrical Power Sys)
  • ML20036A189  + (Proposed TS 3/4.8, Electrical Power Sys, Paragraph 4.8.1.1.2.b,that Deals W/Automatic Load Sequence Timers on EDGs to Be Implemented During Upcoming Cycle 17 Refueling Outage)
  • ML20100R759  + (Proposed TS 3/4.8.1 Re Electrical Power Sys - A.C. Sources)
  • ML20096D772  + (Proposed TS 3/4.8.1 Re Electrical Power Sys - Ac Sources)
  • ML20071L348  + (Proposed TS 3/4.8.1, Electrical Power Sys - AC Sources & Associated Bases)
  • ML20106G435  + (Proposed TS 3/4.8.1,ac Sources)
  • U-602030, Proposed TS 3/4.8.1.1 Re Ac Sources - Operating  + (Proposed TS 3/4.8.1.1 Re Ac Sources - Operating)
  • ML20078R233  + (Proposed TS 3/4.8.1.1 Re EDG Surveillance Requirements Changes)
  • ML20099H361  + (Proposed TS 3/4.8.2 & Bases Re Limiting Conditions for Operation for Electrical Power Sys Dc Sources - Operating)
  • ML20094L353  + (Proposed TS 3/4.8.4.2,removing MOVs Thermal Overload Protection & Bypass Devices)
  • ML20076B416  + (Proposed TS 3/4.9.2 Re Crane Travel - Spent Fuel Storage Pool Bldg & 3/4.9.13 Re Spent Fuel Cask Handling Crane)
  • ML20104B439  + (Proposed TS 3/4.9.6 Re Crane & Hoist Operability)
  • ML17329A646  + (Proposed TS 3/4.9.7 Re Control of Loads Moving Over Spent Fuel Pool During Spent Fuel Reracking Project,Per NUREG-0612)
  • ML18036B205  + (Proposed TS 322 to Licenses DPR-33,DPR-52 & DPR-68,changing TS Sections 3.1/4.1,3.2/4.2 & 3.7/4.7 to Eliminate Scram & Main Steamline Isolation Valve Closure Requirements Per GE Rept Nedo 31400)
  • ML18036B206  + (Proposed TS 322 to Licenses DPR-33,DPR-52 & DPR-68,changing TS Sections 3.1/4.1,3.2/4.2 & 3.7/4.7 to Eliminate Scram & Main Steamline Isolation Valve Closure Requirements Per GE Rept Nedo 31400)
  • ML16288A849  + (Proposed TS 4.0 Surveillance Requirements Response from Sean Mcdeavitt)
  • ML20098D735  + (Proposed TS 4.0.2 Re Consecutive Surveillance Intervals)
  • ML20114B126  + (Proposed TS 4.0.5 Re Applicability & 3/4.4.4.3 Re RCS Leakage to Address Inservice Insp Program for Piping Noted in GL-88-01)
  • ML20086R157  + (Proposed TS 4.0.5a & Associated Bases Section 3/4.4.10, Allowing Implementation of Relief Request W/O Prior NRC Approval,Upon Finding ASME Code Requirement Impractical Because of Prohibitive Dose Rates or Limitations in Design)
  • ML17352A547  + (Proposed TS 4.0.5a Re ISI & Testing Programs)
  • ML20045G609  + (Proposed TS 4.0.d Re Recording Unidentified & Identified Leakage Rates & 3/6/4.6 Re Analyzing Grad Samples of Primary Containment Atmosphere Once Per 12 H)
  • ML20063D854  + (Proposed TS 4.1.3 for Temporary Increase of Interval of Time for Fuel Element Surveillance Due to Special Circumstances)
  • ML20104A441  + (Proposed TS 4.1.3.1.4 Re Reactivity Control Sys SR for Scram Discharge Vol Drain & Vent Valve Operability & TS 4.3.1.2 Re Logic Sys Functional Tests)
  • ML17289B158  + (Proposed TS 4.1.3.1.4.a Re Reactivity Control Sys,Scram Discharge Vol Valve Testing)
  • ML18153D116  + (Proposed TS 4.17 Re Shock Suppressors (Snubbers))
  • ML20211B329  + (Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria)
  • ML13326A895  + (Proposed TS 4.2.1.I.A Re Hot Safety Injection Sys Test)