ML17289B158
Jump to navigation
Jump to search
| ML17289B158 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/10/1993 |
| From: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | |
| Shared Package | |
| ML17289B157 | List: |
| References | |
| NUDOCS 9302170335 | |
| Download: ML17289B158 (2) | |
Text
W ls 4
4 REACfI'/ITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS Continued)
- 4. 1.3. 1.4 The scram discharge volume shall be determined OPERABLE by demonstrating:
a.
The scram discharge volume drain and vent valves OPERABLE, when-at, least once per 18 months,* by verifying that the drain and vent valves:
Close within 30 seconds after recei t of si nal and 44-t..
gq
(~$,p ee.
2.
Open when the scram si nal 'set.
~<cia+
4c
'Clou +Scan Proper float response by performance of a CHANNEL FUNCTIONAL TEST of the scram discharge volume scram and control rod block level instru-mentation after each scram from a pressurized condition.
MASHINGTON HUCLEAR - UNIT 2 9302170335 930210 PDR ADOCK 05000397 p
PDR 3/4 1-5
I
~'I r
k