Text
.~
s Docket No. 50-213 B14444 s
Haddam Neck Plant Proposed Revision to Technical Specifications Electrical Power Systems Markup Pages P
b i
April 1993 i
9305100171 930430 PDR ADDCK 05000213 P
APR 2 61990 ELECTRICAL POWER SYSTEMS SUR EILLANCE REOUIREMENTS (Continued) 6)
Verifying the diesel generator is aligned to provide standby power to the associated emergency busses, b.
At least once per 31 days by verifying that the automatic load sequence timers are OPEldBLE with the following allowable elapsed times:
E0VIPMENT ALLOWABLE ELAPSED TIME LPSI Pump 5 3 sec.
HPSI Pump I 10 sec. and 1 7 sec.
Service Water Pump 33 5 sec.
Backup Service Water Pump 38 i 5 sec.
Res+ Containment Recirc. Fan 43 + 5 sec.
Second Bac4up Containment Rectrc. Fan 48 I 5 sr. Swinu+es
- 30 Sec c.
At least quarterly by checking for and removing accumulated water from the underground fuel oil storage tanks.
d.
By obtaining a sample of new fuel oil upon delivery to the site prior to addition to storage tanks:
1)
Verifying in accordance with the tests specified in ASTM-D975-81; a)
An API gravity of greater than or equal to 30 degrees but less than or equal to 40 degrees; and b)
A water and sediment volume percentage of less than or equal to 0.05% (500 mg/L);
c)
A Saybolt viscosity, SUS at 100*F of greater than or equal to 32.6, but not less than or equal to 40.1; and d)
A flash point equal to or greater than 125*F.
2)
Verifying within 30 days of obtaining the sample that the other properties specified in Table 1 of ASTM-D975-81 are met when tested in accordance with ASTM-D975-81 except that the analysis for sulfur may be performed in accordance with ASTM-D1552-79 or ASTM-D2622-82.
e.
At least once every 31 days by obtaining a sample of fuel oil from the underground fuel oil storage tanks in accordance with ASTM-D-270-75, and verifying that:
(1) API gravity is greater than or equal to 30 degrees but less than or equal to 40 degrees; (2) Water and sediment volume percentage is less than or equal to 0.05% (500 mg/L); and HADDAM NECK 3/4 8-4 Amendment No. 125
4 Docket No. 50-213 B14444-F i
q 5
Haddam Neck Plant Proposed Revision to Technical Specifications Electrical Power Systems Retyped Pages April 1993
ELECTRICAL POWER SYSTEMS
~
SURVEILLANCE REQUIREMENTS (Continued) 6)
Verifying the diesel' generator is aligned to provide standby power to the associated emergency busses, b.
At least once per 31 days by verifying that the automatic load sequence timers are OPERABLE with the following allowable elapsed times:
E0UIPMENT ALLOWABLE ELAPSED TIME LPSI Pump 5 3 sec.
HPSI Pump 5 10 sec. and 1 7 sec.
Service Water Pump 33 5 sec.
Backup Service Water Pump 38 5 sec.
First Containment Recirc. Fan 43 1 5 sec.
Second Containment Recirc. Fan 5 minutes 30 sec. '
c.
At least quarterly by checking for and removing accumulated water from the underground fuel oil storage tanks.
d.
By obtaining a sample of new fuel oil upon delivery to the site prior to addition to storage tanks:
1)
Verifying in accordance with the tests specified in ASTM-D975-81; a)
An API gravity of greater-than or equal to 30 degrees but less than or equal to 40 degrees; and b)
A water and sediment volume percentage of less than or equal to 0.05% (500 mg/L);
c)
A Saybolt viscosity, SUS at 100*F _ of greater than or equal to 32.6, but not less than or equal to 40.1; and d)
A flash point equal to or greater than 125'F.
2)
Verifying within 30 days of obtaining the sample that the other properties specified in Table 1 of ASTM-D975-81 are met when tested in accordance with' ASTM-D97_5-81 except that the analysis for sulfur may be performed in accordance with ASTM-D1552-79 or ASTM-D2622-82.
e.
At least once every 31 days by obtaining a sample of fuel oil from the underground fuel oil storage tanks in accordance with ASTM-D-270-75, and verifying that:
(1) API gravity 'is greater than or equal to 30 degrees but less.
than or equal to 40 degrees; (2) Water and sediment volume percentage is less than or equal to 0.05% (500 mg/L); and HADDAM NECK 3/4 8-4 Amendment No. JEE, 0156