Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20282A709 + (Proposed Alternative to the Requirements of the ASME Omcode to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0060 (COVID-19)))
- ML21190A004 + (Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning Systems)
- ML22307A246 + (Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036))
- ML19240B112 + (Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code)
- ML20253A181 + (Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code)
- ML20156A325 + (Proposed Alternative to the Requirements of the ASME Code to Delay the Code of Record for the Inservice Inspection Program)
- ML24155A004 + (Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47))
- ML23055A284 + (Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping)
- EPID:L-2023-LLR-0006 + (Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping)
- ML24011A073 + (Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping)
- ML20255A100 + (Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)))
- ML21021A100 + (Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0095 (Covid 19)))
- ML20113F041 + (Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19))
- GNRO-2017/00009, Proposed Alternative with 10 CFR 50.55a(z)(1), Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines + (Proposed Alternative with 10 CFR 50.55a(z)(1), Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines)
- ML14223B226 + (Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination)
- ML022460160 + (Proposed Alternatives & Relief Request to Requirements of 10CFR50.55a Concerning Fourth Ten-Year Interval Inservice Inspection Program & Proposed Alternative to Containment Inspection Program)
- 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles + (Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles)
- EPID:L-2024-LLR-0038 + (Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles)
- NL-17-1097, Proposed Alternatives FNP-ISI-AL T-05-02 and VEGP-ISI-AL T-04-02 in Accordance with 10 CFR 50.55a(z)(2) Hardship Without a Compensating Increase in Quality and Safety + (Proposed Alternatives FNP-ISI-AL T-05-02 and VEGP-ISI-AL T-04-02 in Accordance with 10 CFR 50.55a(z)(2) Hardship Without a Compensating Increase in Quality and Safety)
- NL-17-0910, Proposed Alternatives GEN-ISI-ALT-2017-01 Implementation of Code Case N-786-1 and GEN-ISI-ALT-2017-02 Implementation of Code Case N-789-1 + (Proposed Alternatives GEN-ISI-ALT-2017-01 Implementation of Code Case N-786-1 and GEN-ISI-ALT-2017-02 Implementation of Code Case N-789-1)
- ML20199M162 + (Proposed Alternatives PRR-01, PRR-02, PRR-03, and PRR-04 to the Requirements of the ASME OM Code (Epids L-2020-LLR-0007 to L-2020-LLR-0010))
- NL-09-0359, Proposed Alternatives and Relief Request for the Fourth ISI Interval + (Proposed Alternatives and Relief Request for the Fourth ISI Interval)
- L-16-200, Proposed Alternatives and Relief Requests Associated with the Inservice Testing Program 10-Year Update + (Proposed Alternatives and Relief Requests Associated with the Inservice Testing Program 10-Year Update)
- ML071370347 + (Proposed Alternatives and Relief Requests Associated with the Inservice Testing Program Ten-Year Update)
- NL-09-0410, Proposed Alternatives for the Fourth ISI Interval + (Proposed Alternatives for the Fourth ISI Interval)
- BSEP 10-0043, Proposed Alternatives for the Third 10-Year Inservice Inspection Program + (Proposed Alternatives for the Third 10-Year Inservice Inspection Program)
- ML081720069 + (Proposed Alternatives from Pressure Test Requirements for Buried Piping)
- JAFP-03-0111, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i) + (Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i))
- JAFP-03-0179, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds, Per 10CFR50.55a(g)(6)(i) + (Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds, Per 10CFR50.55a(g)(6)(i))
- NOC-AE-20003702, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03) + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03))
- ML20022A320 + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-03))
- NOC-AE-20003701, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-02) + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-02))
- ML20022A319 + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-02))
- NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01))
- EPID:L-2020-LLR-0007 + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01))
- ML20022A318 + (Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01))
- ML21214A222 + (Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants)
- ML21259A099 + (Proposed Alternatives to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants)
- ML21005A061 + (Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018))
- L-03-010, Proposed Alternatives to Gas-Tungsten Arc Welding (Relief Request BV3-RV-03) + (Proposed Alternatives to Gas-Tungsten Arc Welding (Relief Request BV3-RV-03))
- JAFP-18-0075, Proposed Alternatives to Utilize Code Cases N-878, N-879, and N-880 + (Proposed Alternatives to Utilize Code Cases N-878, N-879, and N-880)
- EPID:L-2018-LLR-0077 + (Proposed Alternatives to Utilize Code Cases N-878, N-879, and N-880)
- ML21134A006 + (Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100))
- ML021200183 + (Proposed Alternatives to the Requirements of Section XI of the American Society of Mechanical Engineers Codes - Request for Additional Information (TACs MB3551 & MB3552))
- PNP 2016-061, Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval + (Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval)
- ML111650749 + (Proposed Amend 106 to License DPR-43,adding License Condition & Revising TS to Allow SG Tube Repair by Use of Westinghouse Mechanical sleeves.C-E Repts TR-MCC-185,Rev 0 & CEN-413-P Encl.Rept CEN-413-P Withheld)
- SNRC-2134, Proposed Amend 11 to License NPF-82,requesting Deletion of TS & Environ Protection Plan in Entirety + (Proposed Amend 11 to License NPF-82,requesting Deletion of TS & Environ Protection Plan in Entirety)
- ML19262C109 + (Proposed Amend 11 to License R-73 Reducing Possession Limits to Reflect Actual Amount of SNM in Licensee Possession.Adds Section to Allow Offsite Storage of Fuel Bundles)
- ML20058F821 + (Proposed Amend 117 to License NPF-22 Re Power Uprate W/ Increased Flow)
- ML20248B731 + (Proposed Amend 15 to License R-73,requesting That Security Plan Be Terminated Since Only Exempt Quantities of SNM on Hand & Reactor Defueled)
- ML19331D685 + (Proposed Amend 17 to Tech Specs,Specifying Safety Limits & Limiting Conditions,Surveillance Requirements,Design Features & Administrative Requirements)