Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076K354 + (Program Plan for Control Room Human Factors Review at Oyster Creek Nuclear Generating Station)
- ML20236G459 + (Program Plan for Correction of U.S. Instrument Degradation or Failure in the Upper Plenum Test Facility (Uptf) in the Federal Republic of Germany)
- ML20081A761 + (Program Plan for Detailed Control Room Design Review)
- ML20080D734 + (Program Plan for Detailed Control Room Design Review)
- ML20199J182 + (Program Plan for Environmental Qualification of Mechanical and Dynamic (Including Seismic) Qualification of Mechanical and Electrical Equipment Program (Edqp))
- ML20081D664 + (Program Plan for Fort Calhoun Control Room Design Review, Per Suppl 1 to NUREG-0737 (Generic Ltr 82-33))
- ML20078D615 + (Program Plan for Implementation of Control Room Design Review of Beaver Valley Nuclear Power Station)
- ML20097G497 + (Program Plan for Implementation of Control Room Design Review)
- 0CAN088314, Program Plan for Inadequate Core Cooling Sys - Unit 1: Reactor Vessel Monitoring Sys/Hot Leg Monitoring Sys;Unit 2:Reactor Vessel Monitoring Sys + (Program Plan for Inadequate Core Cooling Sys - Unit 1: Reactor Vessel Monitoring Sys/Hot Leg Monitoring Sys;Unit 2:Reactor Vessel Monitoring Sys)
- ML20215H610 + (Program Plan for Integrated Validation of NUREG-0737 Initiatives)
- ML19305D394 + (Program Plan for Investigation of Vent-Filtered Containment Conceptual Designs for Lwrs)
- ML19329G312 + (Program Plan for Performance Testing of PWR Safety & Relief Valves, Revision 1)
- ML14092A354 + (Program Plan for Piping Verification Program (Thermal Expansion,Steady State Vibration & Dynamic Effects), Revision 6)
- ML050900444 + (Program Plan for Power Uprate Operating Experience Review)
- ML20205R423 + (Program Plan for Replacement Items Project)
- ML20148L643 + (Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2)
- ML16232A631 + (Program Plan for the External Hazards Center of Expertise (EHCOE))
- ML20002A598 + (Program Plan,Human Factors Engineering Evaluation & Improvement of Virgil C Summer Station Control Room)
- ML20134A633 + (Program Plan,Independent Const Review of Marble Hill Nuclear Generating Station Units 1 & 2)
- ML20090H670 + (Program Plan,Independent Design Review of Clinton Power Station,Unit 1)
- BVY 11-071, Program Procedure, Pp 7011 Rev. 13, Vermont Yankee Fire Protection and Safe Shutdown + (Program Procedure, Pp 7011 Rev. 13, Vermont Yankee Fire Protection and Safe Shutdown)
- ML19323E357 + (Program Progress for Core Melt & Separate Effects Program, Monthly Ltr for Mar 1980)
- ML23181A077 + (Program Review - Simulator Testing Methodology)
- ML24198A066 + (Program Review - Simulator Testing Methodology)
- 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program + (Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program)
- ML20002E409 + (Program Summary Report.Volume 4.Number 3)
- ML20150E966 + (Program Summary Rept Vol 2, Number 12)
- ML19256A729 + (Program Summary Rept Vol 2,Number 11)
- ML19263E189 + (Program Summary Rept, Vol 3, Number 5)
- ML19248D008 + (Program Summary Rept, Vol 3, Number 7)
- ML19212A436 + (Program Summary Rept, Vol 3, Number 9)
- ML19254D749 + (Program Summary Rept, Vol 3,Number 10)
- ML19253C773 + (Program Summary Rept, Vol 3,Number 11)
- ML19257B000 + (Program Summary Rept, Vol 3,Number 12)
- ML19282D027 + (Program Summary Rept, Vol 3,Number 4)
- ML19269E777 + (Program Summary Rept, Vol 3,Number 6)
- ML19260C835 + (Program Summary Rept, Vol 4,Number 1)
- ML19284A863 + (Program Summary Rept, Vol 4,Number 2)
- ML19323B117 + (Program Summary Rept, Vol 4,Number 4)
- ML19323H755 + (Program Summary Rept, Vol 4,Number 5)
- ML19274D093 + (Program Summary Rept:Vol 2,Number 6)
- ML20356A241 + (Program and Presentations of Workshop: Digital Twin Applications for Advanced Nuclear Technologies, December 1 - 4, 2020)
- ML20349A021 + (Program and Presentations of Workshop: Digital Twin Applications for Advanced Nuclear Technologies, December 1 - 4, 2020)
- ML20134L892 + (Program for Compliance W/Tmi Action Plan Item I.G.1, `Training During Low Power Testing)
- ML20216C105 + (Program for Control of Residual Radioactive Matls from Byproduct Matls as Defined in Div 3748-01(A)(2) of Ohio Revised Code)
- ML19305A645 + (Program for Field Validation of Synthetic Aperture Focusing Technique for Ultrasonic Testing (Saft Vt))
- ML19345C392 + (Program for Field Validation of Synthetic Aperture Focusing Technique for Ultrasonic Testing (Saft Ut), Quarterly Rept on NRC-04-77-145)
- ML19341B101 + (Program for Field Validation of the Synthetic Aperture Focusing Technique for Ultrasonic Testing (Saft Ut). Quarterly Progress Report.August-October 1980)
- ML20137R990 + (Program for Field Validation of the Synthetic Aperture Focusing Technique for Ultrasonic Testing (Saft Ut).Final Report)
- ML20008G027 + (Program for Field Validation of the Synthetic Aperture Focusing Technique for Ultrasonic Testing (Saft Ut). Quarterly Progress Report.November 1980-January 1981)
- ML20030B713 + (Program for Field Validation of the Synthetic Aperture Focusing Technique for Ultrasonic Testing (Safe UT) Quarterly Progress Report,February-April 1981)