ML19323H755
| ML19323H755 | |
| Person / Time | |
|---|---|
| Issue date: | 05/23/1980 |
| From: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| To: | |
| References | |
| NUREG-0380, NUREG-0380-V04-N05, NUREG-380, NUREG-380-V4-N5, NUDOCS 8006160148 | |
| Download: ML19323H755 (100) | |
Text
.
i l
RUREG-0380 u n a w n!" aq lhn "3 o
uvr ulsa b,
pnn,,-a.a.,.g a
- u [j - { Ihi ps '[1 b % ) 'i,
,, e,ul (t % g'% i;;/ Vi U)f g png i
uf %5 6,
SUli!iMARY REPORT L~~1..S. DUCLEAR REGijlATORY COMMISS10Tik=e 2
6 THIS DOCUMENT C0t!TA!t!S POOR QUAUTY PAGES C.'0Dt'<f_d,9,f*/V,,
o
e t.
l 1
I r
a One year's subscription (12 issues) is available from
,8 a
)
GPO Sales Pro 3 ram Division of Technical Information and Document Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 and t
National Technical Information Service Springfield, Virginia 22161 I
i I
.I 1
i
'i l
i 1
' d i
v S
w
j PROGRAM
SUMMARY
REPORT 1
kB REGo O
%*++
PREPARED BY :
I 0FFICE OF MANAGEMENT AND PROGRAM ANALYSIS NUCLEAR REGULATORY COMMISSION l
l
4 e
1 ACRONYMS ACRS Advisory Committee on Reactor Safeguards ANSI American National Standards Institute ASLB Atomic Safety & Licensing Board ASMS American Society of Mechanical Engineers BOP Balance of Plant BWR Boiling Wat'er Reactor B&W Babcock & Wilcox CE Combustion Engineering CP Construction Permit DES Draft Environmental Statement ECCS Emergency Core Cooling System ER Environmental Report ESR Early Site Review FES Final Environmental Statement FSAR Final Safety Analysis Report FTL Full Term License GE General Electric l
HTGR High Temperature Gas Reactor l
LESR Limited Early Site Review j
LMFBR Liquid Metal Fast Breeder Reactor LWA Limited Work Authorization LWR Light Water Reactor MWe Megawatts Electric MWt Megawatts Thermal NSSS Nuclear Steam Supply System l
OL Operating License PCP Post Construction Permit (OL due to be tendered)
PDC Pre-Docketed Construction t'ermit (CP due to be tendered)
PDD Prospective Decision Date PDS Predocketed Special Project (SP due to be tendered)
PSAR Preliminary Safety Analysis Report l
PWR Pressurized Water Reactor l
SER Safety Evaluation Report l
SE Supp Safety Evaluation Supplement SP Special Project WEST Westinghouse i
FOREWORD 128th EDITION THIS Rt! PORT PROVIDES
SUMMARY
INFORMATION ON ALL PHASES OF NUCLEAR REGULATION.
AND IS INTENDED AS AN INFORMATION AND DECISION - MAKING TOOL FOR MID AND UPPER LEVEL MANAGEMENT OF THE NUCLEAR REGULATORY COMMISSION.
TABLE OF CONTENTS - BY SECTION SECTION I - NUCLEAR FACILITIES
.1-2 PROFILE OF HUCLEAR REACTORS BUILT........
CASEL OAD PROJECTION (SEMIANNUAL UPDATE)................
. 1-3
...... 1-4 THRU 1-10 STATUS OF HUCLEAR POWER PLANTS..............
SUMMARY
OF STANDARDIZATIOH APPLICATIONS...........
. 1-11 THRU 1-12
.1 13 THRU 1-14 OPERATING LICENSES ISSUED....
CONSTRUCTION PERMITS ISSUED................
.. 1-15 THRU 1-17 1-18 LIMITED WORK AUTHORIZATIONS ISSUED.......
. 1-19 THRU 1-20 MAJOR NRC LICENSED FUEL CYCLE FACILITIES...
......... 1-21 NSSS CONTRACTS AWARDED.
SECTIDH II - REACTOR LICENSING, CONSTRUCTION, AND OPERATION HEW APPLICATIONS, SITE REVIEWS. SP. PROJECTS AND
.2-2 THRU 2-3 STANDARDIZATION DESIGNS FORECAST.
... 2-4 CONSTRUCTION PERMIT FORECAST.........................
.2-5 THRU 2-6 CONSTRUCTION PERMIT REVIEW DURATION
SUMMARY
.... 2-7 SAFETY EVALUATION SUPPLEMENT............
............ 2-8 FIHAL ENVIRONMENTAL STATEMENT DURATIONS.
.2-9 ACRS FORECAST..............
.. 2-10 OPERATING LICENSE FORECAST...............
..........2-11 NUCLEAR POWER PLANTS UNDER CONSTRUCTION....
................. 2-12 THRU 2-13 HIGHLIGHTS OF COMMERICAL UNITS....
SECTION III - NUCLEAR MATERIALS APPLICATIONS RECEIVED.........
...... 3-2 THRU 3-4 IN-HOUSE MAJOR CASE FORECAST....
.. 3-5 THRU 3-7 MAJOR CASE WORK COMPLETIONS.
...... 3-8 MINOR CASE WORK COMPLETI0HS.,
... 3-9
..... 3-10 THRU 3-13 MATERIALS LICENSING DATA.....................
SECTION IV - STANDARDS AND REGULATIONS PROGRAM OVERVIEW - TASK WORKLOAD STATUS..
..... 4-2
.4-3 THRU 4-4 REGULATORY GUIDES PUBLISHED.
..... 4-5 ANSI STANDARDS PUBLISHED...
NUREG REPORTS.....................
... 4-6 THRU 4-8 AMENDMENTS TO HEW HRC REGULATIONS..........
..... 4-9
SUMMARY
OF SELECTED STANDARDS STATISTICS.,
...... 4-10
........... 4-11 THRU 4-12 NRC POLICY STATEMENTS....
SECTION V - RESEARCH PROJECTS
.... 5-2 THRU S-7 SELECTED RESEARCH PROJECTS.....................
SECTION VI - FOREIGN REACTORS
SUMMARY
OF FOREIGH REACTORS............
................. 6-2 EXP OR T LIC ENS E APP L IC A TIONS.............................. 6-3 TH RU 6-4 SECTION VII - EXEMPTIDHS EXEMPTIONS ALLOWED..
...... 7-2 THRU 7-3 SECTION VIII - NRC OVERVIEW MAP OF U.S.
ELECTRIC RELIABILITY COUNCILS AND COMMERCIAL HUCLEAR POWER REACTORS IN THE U.S.
........ 8-2 HUCLEAR POWER UNITS GROUPED GE0 GRAPHICALLY BY REGIONAL ELEC. RELIABILITY COUNCILS AND REGIONAL STATUS OF COMMERCIAL NUCLEAR POWER REACTORS......
... 8-3 THRU 8-4 REACTORS BY STATE...........................
............ 8-5 INDEX TO REACTOR SITES...................................
8-6 THRU 8-8 IHDEX TO REACTORS BY UTILITY 0WHERS....................
. 8-9 THRU 8-12 MAP OF AGREEMENT STATES..................................
8-13 H
TABLE OF CONTENTS - ALPHABETICAL LISTING ACRS F0 RECAST..........................
...................... 2-9 AGREEMENT STATES MAP..................
.................... 8-12 AMENDMENTS TO NEW HRC REGULATIONS...
.................. 4-9
................... 4-5 ANSI STANDARDS PUBLISHED..........
APPLICATIONS RECEIVED......................................... 3-2 THRU 3-4 CASELOAD PROJECTION (SEn?NAHHUAL UPDATE)......................
1-3 COMMERCIAL NUCLEAR POWER REACTORS IN THE U.S.
(MAP)...........
8-2 COMMERICAL UNITS - HIGHLIGHTS.................................
2-12 THRU 2-13 CONSTRUCTION PERMIT F0 RECAST..................................
2-4 CONSTRUCTIDH PERMIT REVIEW DURATION
SUMMARY
.... 2-5 THRU 2-6 CONSTRUCTION PERMITS ISSUED...................................
1-15 THRU 1-17 ELECTRIC (U.S.) RELIABILITY COUNCILS...................
..... 8-2 THRU 8-4 EXEMPTIONS ALLOWED...............
.. 7-2 THRU 7-3 EXPORT LICENSE APPLICATIONS........
......... 6-3 THRU 6-4 FACILITY CANCELLATIONS..............................
......... 1-9 FINAL ENVIRONMENTAL STATEMENT DuR.tT70N....
................... 2-8 FOREIGH REACTORS
SUMMARY
...... 6-2 LIMITED WORK AUTHORIZATIONS ISSUED..........
............. 1-18 MAJOR CASE FORECAST (IN-HOUSE)...............
................ 3-5 THRU 3-7 MAJOR CASE WORK COMPLETIONS..................
................ 3-8 MATERIALS LICENSING DATA....
...................... 3-10 THRU 3-13 MINOR CASE WORK COMPLETIONS..........
....... 3-9 NEW APPLICATIONS F0 RECAST.....................................
2-2 THRU 2-3 HUCLEAR POWER PLANT STATUS.................................... 1-4 THRU 1-10 NUCLEAR P9WER PLANTS UNDER C0HSTRUCTIOH.......................
2-11 NUCLEAR P0WER UNITS GROUPED GEOGRAPHICALLY BY......
REGIDHAL ELEC. RELIABILITY COUNCILS......................
8-2 THRU 8-4 HUCLEAR REACTORS BUILT - PROFILE................
............ 1-2 NUCLEAR STEAM SUPPLY SYSTEM CONTRACTS AWARDED....
.......... 1-21 HUREG REP 0RTS......................................
.......... 4-6 THRU 4-8 OPERATING LICENSE FORECAST................
............. 2-10 OPERATING LICENSES ISSUED........................
......... 1-13 THRU 1-14 POLICY STATEMENTS - HRC....
.................................. 4-11 THRU 4-12 R E ACTORS BY UT IL ITY OWHERS - INDEX............................ 8-9 THRU 8-13 REACTOR SITES INDEX...
................................ 8-6 THRU 8-8 REACTORS BY STATE.................................
......... 8-5 REGIONAL NRC 0FFICES......................
................... 8-2 THRU 8-4 REGIONAL STATUS OF HUCLEAR POWER REACTORS.....................
8-3 REGULATORY GUIDES PUBLISHED............
...................... 4-3 THRU 4-4 RESEARCH (SELECTED)
PR0JECTS.................................. 5-2 THRU 5-7 SAFETY EVALUATION SUPPLEMENT DURATI0H............
............ 2-7 SITE REVIEWS FORECAST.............
...... 2-3 SPECIAL PROJECTS FORECAST..............
...................... 2-3 STANDARDIZATION APPLICATIONS
SUMMARY
................. 1-11 THRU 1-12
......... 2-3 STANDARDIZATION DESIGHS FORECAST............
STANDARDS (SELECTED) STATISTICS
SUMMARY
..... 4-10 TASK WORKLOAD STATUS - PROGRAM 0VERVIEW.......................
4-2 iii
4 HIGHLIGHTS STATUS OF HUCLEAR POWER PLANTS (PG 1-4)
AS OF APRIL 30, 1980 67 UNITS HAVE BEEN LICENSED TO OPERATE 3 UNITS ARE LICENSED FOR LOW POWER TESTING 85 UNITS HAVE CONSTRUCTION PERMITS 11 UNITS ARE UNDER CONSTRUCTION PERMIT REVIEW 166 TOTAL UNITS NEW APPLICATIONS FORECAST (PG 2-2/3)
AS OF MAY 2, 1980 NO NEW APPLICATIONS WERE TENDERED IN APRIL 7 NEW APPLICATIONS HAVE BEEN TENDERED TO DATE IN FY 80 21 NEW APPLICATIONS HAVE BEEN OR ARE PROJECTED TO BE TENDERED DURING FY 80 8 81 CONSTRUCTION PERMIT FORECAST (PG 2-4)
AS OF APRIL 30, 1960 NO CONSTRUCTION PERMIT REVIEWS WERE COMPLETED IN APRIL NO CONSTRUCTION PERMIT REVIEW 15 ESTIMATED FOR COMPLETION IN FY 81 DURATION
SUMMARY
(PG 2-5 THRU 2-8)
AS OF MAY 2, 1980 NO CONSTRUCTION PERMIT APPLICATIONS WERE DOCKETED IN APRIL 1980 NO SAFETY EVALUATION SUPPLEMENTS ARE PROJECTED TO BE ISSUED IN FY 80 NO FINAL ENVIRONMENTAL STATEMENTS ARE PROJECTED TO BE ISSUED IN FY 80 OPERATING LICENSE FORECAST (PG 2-10)
NO OPERATING LICENSE WAS ISSUED IN MARCH 4 OPERATING LICENSES ARE EXPECTED TO BE ISSUED DURING FY 80 6 OPERATING LICENSEL ARE EXPECTED TO BE ISSUED IN FY 81 DURING MARCH, 155,229 MWT (DOES NOT INCLUDE INDIAN POINT #1, HUMBOLDT BAY AND THREE MILE ISLAND 82) WAS THE TOTAL THERMAL POWER LICENSED WHICH WAS CAPABLE OF PRODUCING APPROX. 50,000 MWE OF ELECTRICITY.
NUCLEAR POWER PLANTS UNDER CONSTRUCTION (PG 2-11)
AS OF MAY 2, 1980 70 PLANTS ARE ACTIVELY UNDER CONSTRUCTION iv
HIGHLIGHTS MONTHLY HIGHLIGHTS - 0F COMMERICAL POWER UNITS (PG 2-12/13)
DURING MARCH 1980 67 UNITS WERE IN COMMERCIAL OPERATION 67 UNITS WERE LICENSED TO OPERATE (EXCLUDES INDIAN POINT 1,
HUMBOLDT BAY AND THREE MILE ISLAND 2 WHICH HAVE OPERATING LICEhSES BUT ARE SHUTDOWN INDEFINITELY) 1 UNIT WAS LICENSED FOR FUEL LOADING AND LOW POWER TESTING 35 UNITS EXPERIEHCED SHUTDOWNS GREATER THAN 72 HOURS 6 UNITS WERE DERATED NMS$ - NEW FUEL FACILITIES APPLICATIONS RECEIVED (PG 3-2/4)
AS OF MAY 9, 1980 10 APPLICATIONS WERE RECEIVED IN FY 80 NMSS MAJOR AND MINOR CASEWORK (PG 3-8)
AS OF MAY 9, 1980 16 MAJOR CASES HAVE BEEN COMPLETED TO DATE IN FY 80 HMSS _ MATERIALS LICENSING DATA (PG 3-10/11)
DURING APRIL 1980 941 - END OF MONTH INVENTORY (PENDING LETTERS NOT IHCLUDED) 220 - APPLICATIONS GREATER THAN 90 DAYS 603 - APPLICATIONS RECEIVED 477 - LICENSING ACTIONS COMPLETED (APPLICATI0HS LICENSED) 1074 - BEGIHHING OF MONTH INVENTORY 941 - END OF MONTH INVENTORY MOHTHLY HIGHLIGHTS _ STANDARDS DEVELOPMENT (PG 4-3 THRU 4-12)
DURING APRIL 1980 NO PROPOSED RULES WERE ISSUED NO EFFECTIVE RULES WERE PUBLISHED NO ACTIVE GUIDES WERE PUBLISHED 2 ANSI STANDARDS WERE PUBLISHED 4 HUREG REPORTS WERE PUBLISHED NO POLICY STAIEMENTS WERE ISSUED ETHE FOLLOWING ADDITIONS AND DELETIONSWERE MADE TO THIS M 1
g g
[]
El
[]
EE El IE
[]
IE El El El EI E]
II
[1 II l
(j E
1E55555555555555555555555555555555555555E v
i l
SECTION I -
NUCLEAR FACILITIES
1 89 1
l ST I
0 N
8 U
9 1
E S,
R IN E
TO W
AI TT 9
C SA 7
R C
EI 9
N HF 1
E TIT H
MR L
l Y
RC T
OE T
B. FE 3
9 L 7 W7 D T 9
A I 9 E
E U
8 I1 T
1 P
B 7
VR PS E
9 EE OD 0
S C 8
1 RB RE R N 9
M DI OI R
N 1
E TS E
EE C
CD 0
l D
RD E
AE 3
ND E T U
W EN I
7 OT IP L
R N
R N T
GA E
R NL RA P
7 NF AL A 9
P 1
EA W1 O
E RR LD LR F
CO O EO LE W
OR U
3 T S l
S7 FR N L A N9 EE 1
FI O
HF O U A IR E
B T 6
T T,D E
7 A
E A
9 C B S D
1 IM NY L G L
I N LE O FI PT IE TT OE PP R B AE AI S LN I
P H
LF CO EE IT CD H
NN 5
WR AI 7
O RI CS.
9 OR TS RNT 1
FP UAN S
l NS O9 UI T,D T
S E DA NTC 4
ET ONN 7
RS IA T U 9
E E IL O
1 DH DP N RT DGN O
ANA N
I RI NTR l
RED T
NU UO U 7
E ND 9
OC N
AOR 1
NT J
NO NO N
AN I36
=
0 0
0 0
0 0
0 0
0 7
6 4
3 2
1 0
9 8
1 1
2 2
2 2
2 1
1 zCigx0 E av>
E n
(
d
i CASELDAD PROJECTIONS NEXT UPDATE: OCTOBER 1980 i
l MDATA AS OF FEBRUARY 1980 FY 1981 FY 1982 FY 1983 FY 1984 FY 1985 FY 1986 l
<<<< REACTORS >>>>
l HEW CP APPLICATIONS 0
1 0
0 0
0 NEW OL APPLICATIONS 3(8) 6(13) 2(3) 2(3) 2(3) 5(11)
LICENSED 81 53 102 113 124 135MM 1
UNDER CONSTRUCTION 85 73 64 53 44 33
<<<< FUEL CYCLE FACILITIES >>>>
NEW MILL APPLICATIONS 4
2 1
0 0
0 I
NEW FUEL FAB /UF6 APPLICATIONS 0
0 0
0 0
0 NEW SPENT FJEL APPLICATIONS 2
1 0
1 0
0 l
NEW HWL APPLICATIONS 0
0 0
0 0
0 NEW LLW APPLICATIONS 2
3 1
0 0
0 LICENSED 48 49 53 57 60 61
\\
q
.<<<< OTHER >>>>
RADIOISOTOPES LICENSES 9200 9450 9700 9950 10,200 10,500 i
EXPORT ISSUED (MAJOR) 147 157 157 157 157 IMPORT ISSUED (MAJOR) 20 20 20 20 20 NOTE: THE FY '1982 PROJECTIONS FOR REACTORS AND FUEL CYCLE FACILITIES ARE BASED OH WRITTEM SURVEYS CONDUCTED BY THE OFFICES OF NRR AND NMSS.
THE PROJECTIONS FOR OPERATING REACTORS ARE BASED ON THE METHODOLOGY DESCRIBED IN APPENDIX A 0F THE SOURCE DOCUMENT. EXCEPT AS OTHERWISE INDICATED. THE PROJECTIONS FOR 1983-1986 ARE BASED ON BEST ESTIMATES AND DO NOT REPRESENT COMMITMENTS OR ORDERS BY A SPECIFIC APPLICANT TO UNDERTAKE A GIVEN LICENSE ACTIVITY.
WSOURCE: " PLANNING' PROJECTIONS FOR FISCAL YEARS 1982-86", MARCH 1980 MM124 GWE i'-3
STATUS OF NUCLEAR POWER PLANTS evtR PwW R O t MI Mb lutat-81s STATUS OF NUCLEAR POWER REACTORS 25 41 1
UNDER NRC PURVIEW. APR. 30,1980
\\
SOURCE OFFICE OF MANAGEMENT & PROGRAM ANALYSIS
\\ Number Capacity
- 3~~
_3 LICENSED FOR LOW-POWER TESTING.
%,Of Units (MW*l -
"67 LICENSED TO OPERATE.
. 6 00 (Escludes 3 whech have operetsng hcensee but are shut down endef.
3 mne'v Three M6te essend 2. Humboadt sey, and indien Peent il 3.000
,,85 CONSTRUCTION PERMIT GRANTED.
.94.000 8#
e' 34 Under Operateg Ucense Review...
. 37.tco
- e' 51 Operstmg bconse Not Yet Apphed For..
. 57/JW IEncludes 3 whech have been densed certificaten t,y the N Y. State Sating Board Storting 1 and Jernesport 16 21 11 UNDER CONSTRUCTION PERMIT REVIEW.
. 14.330 IEncludes 3 which are endefensteiv postponed Montegue 1 & 2.
f e
and Chnch Rever: and 2 whech have been densed certification Ipy
/
the N Y 1
',' j State Setmg Board. New Haven 1 & 2) 166 TOTAL.
. 150.000* "
/
5 6
/
/
/
- Net Me.emum Deeendable Ceeecety for operstmg uners for which it is
/
estabhshed not Desaga Electreces Ret 6ag for en other unere j
- The 47 unrts have accumulated as3 reacter years of operecen An additeenee 58 j
reacter wears of epeestion have been accuenviated by permanently or 1 6
/
- %umeets Je #60s add e.actey due se roundmg y
endefeneteev shut down unete NOTE Ons, unies docsered by NRC are encluded Hence two stefue categerees
- Ordered ' end ' Pubuci, Announced"16aceuded en sem+ter eherts assued through 58 107 1
w so M t (s 4 ACTIVE AND PENDING APFLICATIONS FOR CENTRAL STATION NUCLEAR POWER PLANTS AND SPECIAL PROJECTS APRIL 30, 1980 NO. OF APPLICATIONS NO. OF UNITS A.
OPERATING LICENSES -
67 LICENSED FOR LOW POWER TESTING 3
l B.
UNDER OPERATING LICENSE REVIEW 21 34 t
C.
UNDER CONSTRUCTION BUT OPERATING l
LICENSE APPLICATIONS NOT ACCEPTED 26 51 D.
UNDER CONSTRUCTION PERMIT REVIEW 8
11 E.
SPECIAL PROJECTS 25 F.
PRELIMINAkY **TGN APPROVALS ISSU5D G.
FACILITY CANCELLATIONS 22 38 14 NOTE:
LWA'S HAVE BEEN ISSUED FOR 2 UNITS CURRENTLY UNDER REVIEW FOR CONSTRUCTION PERMITS.
UCENSED TO OPERATE ogE I
CE DATe OF ISSUANCE A. LICENSED TO OPERATE LICENSE A.
LICENSED TO OPERATE N
1 COMMONWEALTH EDISDN CD.
06/02/60 POL 27.
MAINE YANKEE ATOMIC POWER CD.
C6/29/73 FTL DRESDEN 1 (BWR) 10/14/60 FTL MAINE YANKEE (FWR) 2.
YANKEE ATOMIC POWER CO.
07/29/60 POL 28.
TENNESSEE VALLEY AUTHORITY 12/20/73 FTL YANKEE-ROWE (PWR) 06/23/61 FTL BROWNS FERRY 1 (BWR) 3.
CONSUMERS POWER CO.
08/30/62 POL 29.
OMAHA PUBLIC POWER DISTRICT 08/09/73 FTL BIG ROCK POINT (BWR) 05/01/64 FTL FT. CALHOUN 1 (PWR) 4 SOUTHERN CALIFORNIA EDISON CO.
03/27/67 POLu 30.
CONSOLIDATED EDISON CO.
09/28/73 FTL SAN ONOFRE 1 (PWR)
INDIAN POINT 2 (PWR) 5.
CONNECTICUT YANKEE ATOMIC POWER CD 06/3C/67 POL 31.
DUKE POWER CO.
13/06/73 FTL HADDAM NECK (PWR) 12/27/74 FTL OCONEE 2 (PWR) 6.
DAIRYLAND COOPERATIVE POWER 07/03/67 POLw 32.
COMMONWEALTH EDISON CO.
10/19/73 FTL LACROSSE (BWR)
ZION 1 (PWR) 7.
JERSEY CENTRAL POWER 8 LIGHT CO.
04/09/69 POLu 33.
PHILADELPHIA ELECTRIC CO.
10/25/73 FTL OYSTER CREEK 1 (BWR)
PEACH BOTTOM 2 (BWR) 8.
NIAGARA MOHAWK POWER CORP.
08/22/69 POL 34.
COMMCNWEALTH EDISDN CO.
11/14/73 FTL HINE MILE POINT 1 (BWR) 12/26/74 FTL ZION 2 (PWR) 9.
ROCHESTER GAS & ELECTRIC CORP.
09/19/69 POLu 35.
NORTHERN STATES POWER CO.
04/05/74 FTL R.E. GINNA (PWR)
PRAIRIE ISLAND 1 (PWR) 10.
COMMONWEALTH EDISON CO.
12/22/69 POLw 36.
PUBLIC SERVICE CO. OF COLORADO 12/21/73 FTL DRESDEN 2 (BWR)
CAROLINA POWER 4 LIGHT.CO.
09/23/70 FTL 37.
WISCONSIN PUBLIC SERVICE CORP.
12/21/73 FTL H.B.
ROBINSON 2 (PWR)
KEWAUNEE (PWR) 12.
NORTHERN STATES POWER CD.
01/19/71 POLu 38.
NEBRASKA PUBLIC F0WER DISTRICT 01/18/74 FTL MONTICELLO (BWR)
COOPER STATION (BWR) 13.
WISCONSIN-MICHIGAN POWER CO.
10/05/70 FTL 39.
IOWA ELECTRIC LIGHT 8 POWER CO.
02/22/74 FTL POINT BEACH 1 (PWR)
ARNOLD (BWR) 14 NORTHEAST NUCLEAR ENERGY CO.
10/?6/70 POLw 40.
METROPOLITAN EDISON CO.
04/19/74 FTL MILLS *ME 1 (BWR)
TPREE MILE ISLAND 1 (PWR) 15.
COMMONWEALTH EDISON CO.
03/02/71 FTL 41.
ARKANSAS POWER 8 LIGHT CU.
05/21/74 FTL DRESDEN 3 (BWR)
ARKAMSAS 1 (PWR) 16.
COMMONWEALTH F.DISDN CO.
12/14/72 FTL 42.
TENNESSEE VALLEY AUTHORITY 06/28/74 FTL QUAD-CITICS 1 (BWR)
BROWNS FERRY 2 (BWR) 17.
CONSUMERS POWER CO.
10/16/72 POLw 43.
PHILADELPHIA ELECTRIC CO.
07/02/74 FTL PALISADES (PWR)
PEACH BOTTOM 3 (BWR) 18.
COMMONWEALTH EDISON CD.
12/14/72 FTL 64.
DUKE POWER CO.
07/19/74 FTL QUAD-CITIES 2 (BWR)
OCONEE 3 (PWR)
- 19.. VIRGINIA ELECTRIC 8 POWER _ '.
05/25/72 FTL 45.
BALTIMORE GAS 8 ELECTRIC CO.
07/31/74 FTL SURRY 1 (PWR)
'CALVERT CLIFFS 1 (PWR) 20.
FLORIDA POWER 8 LIGHT CO.
07/19/72 FTL 46.
GEORGIA POWER CO.
08/06/74 FTL TURKEY POINT 3 (PWR)
HATCH 1 (BWR) 21 BOSTON EDISON CO.
09/15/72 FTL 47.
SACRAMENTO MUNICIPAL UTIL. DIST.
08/16/74 FTL PILGRIM t (BWR)
RANCHO SECO (PWR) 22.
VERMONT YANKEE HUCLEAR POWER CORP. 02/28/73 FTL 48.
POWER AUTH. OF THE STATE OF NY 10/17/74 FTL VERMONT YANKEE (BWR)
FITZPATRICK (BWR) 23.
VIRGINIA ELECTRIC 8 POWER CO.
01/29/73 FTL 49.
INDIANA 8 MICHIGAN ELECTRIC CO.
10/25/74 FTL SURRY 2 (PWR)
COOK 1 (PWR) 24.
DUKE POWER CO.
02/06/73 FTL 50.
NORTHERN STATES POWER CO.
10/29/74 FTL OCONEE 1 (PWR)
PRAIRIE ISLAND 2 (PWR) 25.
WISCONSIN-MICHIGAN ELECTRIC CD.
03/08/73 FTL 51 CAROLINA POWER 8 LIGHT CO.
12/27/74 FTL POINT BEACH 2 (PWR)
BRUNSWICK 2 (BWR) y 26.
FLORIDA POWER 8 LIGHT CO.
04/10/73 FTL 52.
NORTHEAST NUCLEAR ENERGY CD.
08/01/75 FTL c1 TURKEY POINT 4 (PWR)
MILLSTONE 2 (PWR)
UCENSED TOI OPERATE DATE OF ISSUANCE CONSTRUCTION PERMITS GRANTED DOCKET OF FULL POWER DATE OF A.
LICENSED TO 0*ERATE LICENSE 3.
UNDER OPERATING LICENSE REVIEW APPLICATION 05
- 53. ' PORTLAND GENERAL ELECTRIC CO.
11/21/75 FT(
1 ALABAMA POWER CO.
08/30/73 TROJAN (PWR)
FARLEY 2 (PWR) 54.
POWER AUTH. OF THE STATE OF NY 04/05/76 FTL 2.
PACIFIC GAS 8 ELECTRIC CO.
10/02/73 INDIAN POINT 3 (PWR)
DIABLO CANYON 1 8 2 (PWR) 55.
DUQUESHE LIGHT CO.
01/30/76 FTL 3.
TENNESSEE VALLEY AUTHORITY 01/31/74 BEAVER VALLEY 1 (PWR)
SEQUOYAH 2 (PWR) 56.
FLORIDA POWER 8 LIGHT CD.
03/01/76 FTL 4.
DUKE POWER CO.
MCGUIRE 1 8 2 (PWR) 57.
TEHHESSEE VALLEY AUTHORITY 07/02/76 FTL 5.
DETROIT EDISON CD.
04/04/75 BROWNS FERRY 3 (BWR)
FERMI 2 (BWR) 58.
BALTIMORE GAS 8 ELECTRIC CO.
11/30/76 FTL 6.
CINCINHATI GAS a ELECTRIC CD.
CALVERT CLIFFS 2 (PWR)
ZIMMER 1 (BWR) 59.
PUBLIC SERVICE ELECTRIC 8 GAS CO.
12/01/76 FTL 7.
LONG ISLAND LIGHTING CD.
01/26/76(FSAR 4 ENV.)
SALEM 1 (PWR)
SHOREHAM (BWR) 60.
CAROLINA POWER 8 LIGHT CO.
11/12/76 FTL 8.
TENNESSEE VALLEY AUTHORITY 10/04/76(FSAR)
BRUNSWICK 1 (LWR)
FLORIDA POWER CORP.
01/31/77 FTL 9.
SOUTH CAROLIHA ELFLTRIC 8 GAS CO.
02/24/77(FSAR & ENV.)
CRYSTAL RIVER 3 (PWR)
SUMMER 1 (PWR) 62.
TOLEDO EDISON CO.
04/22/77 FTL 10.
SOUTHERN CALIFORNIA EDISON CO.
03/22/77(FSAR 8 ENV.)
DAVIS-BESSE t (PWR)
SAN ONOFRE 2 8 3 (PWR) 63.
ALABAMA POWER CO.
06/25/77 FTL 11.
WASHINGTON PUBLIC POWER SUPPLY SYS. 04/20/77(ENV.)
FARLEY 1 (PWR)-
WPPSS 2 (BWR) 06/22/78(FSAR) 64.
VIRGINIA ELECTRIC 8 POWER CO.
11/26/77 FTL 12.
COMMONWEALTH EDISON CO.
05/12/77(FSAR 8 ENV.)
NORTH ANNA 1 (PWR)
LASALLE 1 & 2 (BWR) 65.
12/23/77 FTL 13.
CONSUMERS POWER CO.
11/18/77(FSAR)
COOK 2 (PWR)
MIDLAND 1 & 2 (PWR) 04/14/78(ENV.)
66.
GEORGIA POWER CO.
06/13/78 FTL 14.
TEXAS UTILITIES GENERATING CD.
04/25/78(FSAR)
HATCH 2 (BWR)
COMANCHE PEAK 1 & 2 01/19/ 7 9 ( ENV. )
67.
ARKAHSAS POWER 8 LIGHT CO.
09/01/78 FTL 15.
TEHNESSEE VALLEY AUTHORITY 06/12/78(FSAR & ENV.)
BELLEFONTE 1 8 2 (BWR) 16.
HOUSTON POWER 8 LIGHT CO.
07/17/78(FSAR 8 ENV.)
1.
CONSOLIDATED EDISON CO.
03/26/62 POLN SOUTH TEXAS 1 8 2 (PWR)
INDIAN POINT 1 (PWR)MM 17.
PENHSYLVANIA POWER 8 LIGHT CO.
06/10/78(EHV.)
2.
PACIFIC GAS 8 ELECTRIC CO.
08/28/62 POL SUSQUEHANNA 1 8 2 (BWR) 07/31/78(FSAR)
HUMBOLDT BAY (BWR)MM 01/21/69 FTL 18.
MISSISSIPPI POWER 8 LIGHT CO.
06/30/78(FSAR & ENV.)
3.
METROPOLITAN EDISON CO.
02/08/78 FTL GRAND GULF 1 & 2 (BWR)
THREE MILE ISLAHD 2 (PWR)MM 19.
COMMONWEALTH EDISON CO.
12/01/78(FSAR 8 ENV.)
BYRON 1 8 2 (PWR) 20.
COMMONWEALTH EDISDN CO.
12/01/78(FSAR 8 ENV.)
LICENSED FOR LOW POWER TESTING LICENSE DATE BRAIDWOOD 1 82 (PWR) 21 LOUISIANA POWER 8 LIGHT CD.
12/18/78(FSAR & ENV.)
1.
TENHESSEE VALLEY AUTHORITY 02/29/80 WATERFORD 3 (PWR)
SEQUOYAH 1 2.
PUBLIC SERVICE ELECTRIC & GAS CO.
04/18/80 (34 UNITS)
SALEM 2 (PWR) 3.
VIRGINIA ELECTRIC 8 POWER CO.
04/11/80 NORTH ANNA 2 (PWR)
MHAVE APPLIED FOR A FULL-TERM LICEHSE MMSHUT DOWN INDEFINITELY POL - PROVISIONAL OPERATING LICENSE FTL - FULL-TERM LICENSE FLO - FUEL LOADIN,G OHLY l
CONSTRUCTION PERMITS GRANTED C.
UNDER CONSTRUCTION BUT OPERATING CP C.
UNDER CONSTRUCTION BUT OPERATING CP LICENSE APPLICATIONS NOT ACCEPTED ISSUANCE LICENSE APPLICATIONS NOT ACCEPTED ISSUANCE 1.
JERSEY CENTRAL POWER 8 LIGHT CO.
07/10/73 16.
GULF STATES UTILITIES Co.
03/25/77 FORKED RIVER (PWR)
RIVER BEND 1 8 2 (BWR) 2.
NORTHERN INDIANA PUBLIC SERV. CO.
05/01/74 17.
FLORIDA POWER 8 LIGHT CO.
05/02/77 BAILLY (BWR)
DUQUESHE LIGHT CO.
05/03/74 18.
CLEVELAND ELECTRIC ILLUMINATING CO. 05/03/77 BEAVER VALLEY 2 (PWR)
PERRY 1 8 2 (BWR) 4.
PHILADELPHIA ELECTRIC CO.
06/19/74 19.
TENNESSEE VALLEY AUTHORITY 05/09/77 LIMERICK 1 8 2 (BWR)
HARTSVILLE 1 -4 (BWR) 5.
NIAGARA MOHAWK POWER CORP.
06/24/74 20.
KANSAS GAS 8 ELECTRIC CO.
05/17/77 NINE MILE POINT 2 (BWR)
WOLF CREEK (PWR) 6.
GEORGIA POWER CD.
06/28/74 21.
DUKE POWER CO.
12/30/77 V0GTLE 1 2 2 (PWR)
CHEROKEE 1 - 3 (PWR)
,7.
VIRGINIA ELECTRIC & POWER CO.
07/26/74 22.
TENNESSEE VALLEY AUTHORITY 01/16/78 NORTN ANNA 3 4 4 (PWR)
PHIPPS BEND 1 8 2 (BWR) 8.
NORTHEAST NUCLEAR ENERGY CO.
08/09/74 23.
CAROLINA POWER 1 LIGHT CD.
01/27/78 MILLSTONE 3 (PWR)
HARRIS 1 -4 (PWR) 9.
PUBLIC SERVICE ELEC. & GAS CO.
11/01/74 24.
PUBLIC SERVICE OF INDIANAM 04/04/78 NOPE CREEK 1 & 2 (BWR)
MARBLE HILL 1 8 2 (PWR) 10.
DUKE POWER CO.M 08/07/75 25.
WASHINGTON PUBLIC POWER SUPPLY SYS. 04/11/78 CATAWBA 1 & 2 (PWR)
WASHINGTON PUBLIC POWER SUPPLY SYS. 12/23/75 26.
TENNESSEE VALLEY AUTHORITY 11/29/78 WPPSS 1 (PWR)
YELLOW CREEK 1 8 2 (PWR) 12.
ILLINDIS POWER CO.
02/24/7'6 NA WASHINGTON PUBLIC POWER SUPPLY SYS. 02/21/78 CLINTON 1 8 2 (BWR)
WPSS 4 (PWk) 13.
UNION ELECTRIC CO.
04/16/76 (51 UNITS)
CALLAWAY 1 8 2 (PWR)
- 5/24/76 1.
ROCHESTER GAS 8 ELECTRIC CORP.
09/01/77 Pff0 VERE R
N*N' 2.
LO G S D LIG ING CO.
01/04/79 EABR00 2 iP R)
JAMESPORT 1 & 2 (PWR)MM M OL APPLICATION TENDERED MMDENIED CERTIFICATION BY N. Y. STATE SITING BOARD NA - PART OF APPLICATION FOR UNIT 1 4
UNDER CONSTRUCTION PERMIT REVIEW de DOCKET DATE OF D.
UNCER CONSTRUCTICH PERMIT REVIEW APPLICATION 1.
HOUSTON LIGHTING 8 POWER CD.
12/07/73(SAF 4 ENV)
ALLENS CREEK 1 (BWR) 2.
BOSTON EDISON CO.
12/21/73(SAF 8 ENV)
PILGRIM 2 (PWR) 3.
DUKE POWER CO.
05/24/74(SAFETY)
PERKINS 1-3 (PWR) 07/08/74(ENV) 4.
PORTLAND GENERAL ELECTRIC CD.
08/06/74(ENV)
PEBBLE SPRINGS 1 8 2 (PWR) 10/18/74 ( S A FETY) 5.
PUGET SOUND POWER 4 LIGHT CG.'
09/30/74(ENV)
SKAGIT 1 8 2 (BWR) 01/15/74(SAFETY) 6.
PUBLIC SERVICE CO. OF OKLAHOMA 12/23/75(SAF & ENV)
BLACK FOX 1 & 2 (BWR)u 1.
NORTHEAST NUCLEAR ENERGY CO.
07/12/74(SAF & ENV)
MONTAGUE 1 8 2 (BLIR ) 1/
2.
PROJECT MANAGEMENT CORP.1/
04/11/75(ENV)
CLINCH RIVER (LMFBR) 06/13/75(SAFETY) 3.
NEW YORK STATE ELECTRIC 4 GAS 12/29/78(SAFETY)
NEW HAVEN 1 4 2 (PWR)3/
01/24/79(ENV)
(14 UNITS) 11 UNITS UNDER ACTIVE REVIEW 3 UNITS POSTP0HE9 INDEFINIlELY OR DEFERRED NLWA ISSUED.
1/ POSTPONED INDEFINITELY OR DEFERRED.
2/ AMENDMENT TO CHANGE SITE.
3/ DENIED CERTIFICATION BY N. Y. STATE SITING BOARD ONLY UNITS DOCKETED BY NRC ARE INCLUDED. HENCE, THE CATEGORIES "0RDERED" AND " PUBLICLY ANNGUNCED" HAVE BEEN DROPPED.
.__m SPECIAl. PROJECTS E.
SPECIAL PROJECTS-PENDINGN PI TInN F.
PRELIMINARY DFSIGN APPROVALS COMPLETED 1
CESSAR SYSTEM 80 10/27/78 (TENDERED)
DOCKET DATE 2.
FLOATINC NUCLEAR PLANTS 1-8 07/05/73(DOCKETED)
APPLICANT PDA NO.
DATE ISSUED 3.
GAS TURBINE HTGR 07/31/75(DUCKETED) 4.
CASSAR 02/05/75(DOCKEIED) 1 GENERAL ELECTRIC CO.
PDA-1 07/30/73 12/22/75 5.~ GIBBSAR/RESAR-414 10/15/76(DOCKETED 05/10/77)
GESSAR-238 NI 6.
GAISSAR 92/24/78 2.
COMBUSTION ENG., INC.
PDA-2 12/17/73 12/31/75 7.
FT. CALHOUN (LESR) 01/26/76 CESSAR d.
58G 05/31/77(DOCKETED 06/08/7')
3-WESTINGHOUSE ELEC CORP.PDA-3 03/11/74 12/31/75 9.
SJESSAR/BSAR-205 12/22/75(DOCKETED)
.RESAR-41 10.
WOOD SITE STUDY 08/21/75 4.
STONE AND WEBSTER PDA-4 06/28/74 05/05/76 11.
BOPPSAR/BSAR-205 10/31/77(DOCKETED)
SWESSAR/RESAR 12.
BLt'E HILLS (SITE dTUDY) 10/31/77 5.
BRAUNSAR PDA-5 f2/21/74 05/07/76 13.
ESSAR/CESSAR 11/73/77(DOCKETED 02/02/78) 6.
STONE 8 WEBSTER PDA-6 10/21/74 08/18/76 14.
ESSAR/RESAR-414 11/23/77(DOCKETED 03/13/78)
SWESSAR/CESSAR 15.
ESSAR/B4AR-205 11/23/77(DOCKETED 05/19/78) 7.
WESTINGHOUSE ELEC CORP.PDA-7 07/31/75 12/30/76 16.
NORTH COAST (ESR) 09/00/74 RESAR-3S 17 CARROLL COUNTY (ESR) 12/00/78 8.
STONE AND WEBSTER PDA-8 10/03/75 03/31/77 18.
FULTCH (LESR) 01/00/79 SWESSAR/RESAR 3S 19.
COUGLAS POINT (LESR) 08/00/73 9.
GENERAL ELECTRIC CO.
PDA-9 02/14/75 03/31/77 20.
GESSAR-238 NSSS EXTENSION 03/21/78 GESSAR-251 21.
GESSAR-251 EXTENSION 03/21/78 10.
GENERAL ELECTRIC CO.
PDA-10 09/24/75 03/10/77 22.
SWESS4R/CESSAR EXTENSION 03/2i/73 GESSAR-238 NSSS 23.
SWESSAR/RESAR-SS EXTENSION 03/21/78 11 FLUOR POWER PDA-11 01/27/76 08/17/77 24.
BOPSSAR/IESAR-41 EXTENSION 03/21/78 BOPSSAR/RESAR-41 25.
ESAR-205 EXTENSION 03/21/78 12.
BABCOCK 8 WILCOX PDA-12 03/01/76 05/31/78 BSAR-205 13.
WESTINGHOUSE ELEC CORP.PDA-13 12/30/76 11/04/78 RESAR 414 N ALL SPECIAL PROJECT REVIEW EFFORT EXCEPT CARROLL SITE AND FLOATING NUCLEAR IS SUSPENDED
e f
5 G.
FACILITY CANCELLATIONS PLANTS WITH CONSTRUCTION PERMITS FACILITY APPLICANT TYPE MWE DATE SURRY 3-4 VIRGINIA ELECTRIC AND POWER PWR 882 FY-77 TYRONE NORTHERN STATES POWER PWR 1150 FY-79 CONSTRUCTION PERMIT REVIEW FACILITY APPLICANT TYPE MWE DATE QUANICASSEE 1 &2 CONSUMERS POWER PWR 1150 FY-75
-PILGRIM 3 BOSTON EDISON PWR 1180 FY-75 BARTON 3 8 4 ALABAMA POWER & LIGHT BWR 1159 FY-76 SUMMIT 2 DELMARVA POWER'8 LIGHT HTGR 1200 FY-77 ALLENS CREEK 2 HOUSTON POWER AND LIGHT BWR 1213 FY-77 BLUE HILLS 1-2 GULF STATES UTILITIES PWR 918 FY-78 SUMMIT 1 DELMARVA POWER AND LIGHT HTGR 1200 FY-78 SUNDESERT 1-2 SAN DIEGO GAS AhD ELECTRIC PWR 974 FY-78 D0"GLAS POINT POTOMAC ELECTRIC POWER BWR 1146 FY-78 BARTON 1 8 2 ALABAMA POWER & LIGHT BWR 1159 FY-78 FORT CALHOUM 2 OMAHA PUBLIC POWER DISTRICT PWR 1136 FY-78 HAVEN 2 WISCONSIN ELECTRIC POWER CO.
PWR 900 FY-79 ATLANTIC 1-2 PUBLIC SERVICE ELECTRIC AND GAS PWR 1150 FY-79 GREENE COUPTY POWER AUTHORITY OF STATE OF NEW YORK PWR 1991 FY-79 PALO VEREc 4-5 ARIZONA PUBLIC SERVICE PWR 1270 FY-79 DOUGLAS POINT 1 POTOMAC ELECTRIC POWER BWR 1146 FY-79 FULTON 1-2 PHILADELPHIA ELECTRIC HTGR 1160 FY-79 NORTH COAST 2 PUERTO RICO WATER RESOURCES AUTHORITY PWR 583 FY-79 ERIE 1 4 2 OHIO EDISON CO PWR 1260 FY-80 DAVIS BESSE 2 8 3 TOLEDO EDISON CO PWR 906 FY-80 NEW ENGLAND 1 82 NEW ENGLAND POWER PWR 1194 FY-80 HAVEN 1 WISCONSIN ELECTRIC POWER CO.
PWR 900 FY-80 GREENWOOD 2 8 3 DETROIT EDISON PWR 1200 FY-80 i
w
SUMMARY
OF STANDARDIZATION APPLICATIONS DATA AS OF MAY 2.1980 REFERENCE SYSTEMSw 17 APPLICATIONS DOCKET PROJECT APPLICANT DATE COMMENTS HUCLEAR STEAM SUPPLY SYSTEM, NUCLEAR ISLANDS & TURBINE ISLAHDS GESSAR-238 HI GENERAL ELECTRIC 07/30/73 HUCLEAR ISLAND. PRELIMINARY DESIGN BRAUNSAR C.
F. BRAUN 12/21/74 TURBINE ISLAND MATCHED TO GESSAR-238 HI CESSAR COMBUSTION EHGINEERING 12/19/73 NSSS RESAR-41 WESTINGHOUSE 03/11/74 NSSS B-SAR-241 BABCOCK & WILCOX G5/14/74 NSSS (WITHORAWH)
B-SAR 205 BABCOCK & WILCOX 03/01/76 HSSS (REPLACES B-SAR-241)
CASSAR GEHERAL ATOMIC 02/05/75 NSSS GESSAR-251 GEHERAL ELECTRIC 02/14/75 HSSS RESAR-35 WESTIHGHOUSE 07/31/75 HSSS GESSAR-238 HSSS GENERAL ELECTRIC 10/16/75 HSSS RESAR-414 WESTINGHOUSE 12/30/76 HSSS CESSAR COMBUSTION ENGINEERING FDA APPLICATION UNDER ACCEPTANCE STANDARD BALANCE-OF-PLANT (BOP)
REVIEW ESSAR:
EBA!CO CESSAR 02/02/78 BOP DESIGH MATCHED TO CESSAR RESAR-414 03/13/78 BOP DESIGN MATCHED TO RESAR-414 B-SAR-205 05/19/78 BOP DESIGN MATCHED TO B-SAR-205 SWESSAR STONE 8 WEBSTER RESAR-41 06/28/74 BOP DESIGH MATCHED TO RESAR-41 CESSAR 10/21/74 BOP MATCHED TO CESSAR RESAR-3S 10/02/75 BOP MATCHED TO RESAR-3S B-SAR-203 12/22/75 BOP MATCHED TO B-SAR-205 GIBBS$AR/RESAR-414 GIBBS 8 HILL 05/09/77 BOP-SSAR:
FLUOR POWER RESAR-41 01/2b76 BOP MATCHED TO RESAR-41 B-SAR-205 10/31/77 BOP MATCHED TO 3-SAR-205 GAISSAR GILBERT /COMM0HWEALTH 08/21/78 BOP MATCHED CESSAR, RESAR-414, B-SAR-205 NHSSS AND BOP DESIGHS WHICH ARE REFERENCED BY OTHER APPLICATIONS 1-11
SUMMARY
OF STANDARDIZATION APPLICATIONS UTILITY APPLICATIONS USING REFERENCE SYSTEMS 9 ACTIVE APPLICATIONS THESE APPLICATIONS REFERENCE BOP OR NSSS STANDARD DESIGN REVIEWS, IN ORDER TO AVOID REPITITIOUS REVIEW.
DOCKET PROJECT APPLICANT DATE COMMENTS CHEROKEE 1-3 DUKE POWER 05/24/74 REFERENCES CESSAR.
PERKINS 1-3 DUKE POWER 05/24/74 REFERENCES CESSAR.
SOUTH TEXAS 1 8 2 HOUSTCH LIGHT & POWER 07/05/74 REFERENCES RESAR-41.
WPPSS 3 4 5 WASHINGTON PUBLIC POWER 08/02/74 REFERENCES CESSAR.
SUPPLY SYSTEM PALO VERDE 1-3 ARIZONA PUBLIC SERVICE 10/07/74 REFERENCES CESSAR.
HARTSVILLE 1-4 TEHHESSEE VALLEY AUTHORITY 11/22/74 REFEREHCES GESSAR-238 (HII.
BLACK FOX 1 12 PUBLIC SERVICE OF OKLAHOMA 12/23/75 REFERENCES GESSAR-238 (NStS).
PHIPPS BEND 1 &2 TENNESSEE VALLEY AUTHORITY 11/07/75 REFEREHCES GESSAR-238 (HI).
VELLOW CREEK 1 82 TENNESSEE VALLEY AUTHORITY 07/16/76 REFERENCES CESSAR.
DUPLICATE PLANTS 7 ACTIVE APPLICATI0HS BYRON 1 82 COMMONWEALTH EDISON 09/20/73 TWO UNITS AT EACH Ol' TWO SITES.
BRAIDWOOD 1 a2 09/20/73 SHUPPS FIVE UNITS AT FOUR SITES.
WOLF CREEK KANSAS GAS 8 ELECTRIC AND 05/17/75 KANSAS CITY POWER & LIGHT CALLAWAY 1 82 UNION ELECTRIC 06/21/74 STERLING ROCHESTER GAS & ELECTRIC 06/21/74 CHEROKEE 1-3 DUKE POWER 05/24/74 THREE UNITS AT EACH OF PERKINS 1-3 05/24/74 TWO SITES.
DUPLICATE PLANTS ARE PLANTS OF THE SAME DESIGN WITH THE POSSIBILITIES OF MULTIPLE SITES AND MULTIPLE APPLICATIONS REPLICATIDH 2 ACTIVE APPLICATIONS JAMESPORT 1 82 LONG ISLAND LIGHTING 09/06/74 REPLICATES MILLSTONE 3.
i MARBLE HILL 182 PUBLIC SERVICE OF INDIAHA 09/17/75 REPLICATES BYRON 1 12 REPLICATION IS THE DUPLICATION OF A PLANT WITH A DESIGN PREVIOUSLY APPROVED BY HRC STAFF.
LICENSE TO MANUFACTURE FLOATING HUCLEAR PLANTS 1 APPLICATION FLOATING NUCLEAR OFFSHORE POWER SYSTEM 07/05/73 ENTIRE PLANT DESIGN.
PLANT (FNP) 1-8 i
l 1 12 l
OPERATING LICENSES ISSUED N
EL APSED * (2)
ELAPSED FSAR ER FULL jr MONTHS TO MONTHS TO DOCKET DOCKET INITIAL POWER INITIAL FULL POWER LICENSE PLANT DATE DATE LICENSE LICENSE LICENSE LICENSE nut 1B ER 1.
DRESDEN 1 06-09-58 N/A 09-28-59 06-02-60 15.6 23.7 DPR-2
- 2. YANKEE-ROWE 1 09-16-59 N/A 07-09-60 07-29-60 9.7 10.4 DPR-3
- 3. HALLAM M 04-16-61 N/A 01-02-62 08-09-62 8.5 15.7 DPRA-1 4.
INDIAN POINT 1 MM 01-30-60 01-30-60 03-26-62 03-26-62 25.8 25.8 DPR-5
- 5. PIQUA N 02-01-61 N/A 08-23-62 05-16-63 18.7 27.5 PDRA-2
- 6. HUMBOLDT BAY MM 09-05-61 N/A 08-28-62 08-28-62 11.7 11.7 DPR-7
- 7. BIG ROCK POINT 1 12-04-61 N/A 08-30-62 08-30-62 8.8 8.8 DPR-6 8.
ELK RIVER M 07-08-60 N/A 11-06-62 11-10-62 27.9 28.0 DPRA-3
- 9. CV*A N 01-24-62 N/A 11-27-62 11-27-62 10.1 10.1 DPR-8
- 10. ENRICO FERMI 1 MM 07-14-61 N/A 05-10-63 07-11-63 21.8 23.9 DPR-9
- 11. PATHFINDER M 06-22-62 N/A 03-12-64 03-12-64 20.6 20.6 DPR-11
- 12. 30NUS M 02-01-62
'A 04-02-64 04-02-64 26.0 26.0 DPRA-4
- 13. PEACH B01 0M 1 MM 02-25-64 N/A 01-24-66 01-12-67 22.9 34.5 DPR-12
- 14. SAN ONOFRE 1 11-30-65 N/A 03-27-67 03-27-67 15.9 15.9 DPR-13
- 15. NADDAM NECK 07-22-66 N/A 06-30-67 06-30-67 11.2 11.2 DPR-61
- 16. LA CROSSE 08-03-65 N/A 07-03-67 07-03-67 23.0 23.0 DPR-45
- 17. DYSTER CREEK 1 01-25-67 N/A 04-09-69 08-01-69 26.4 30.2 DPR-16
- 18. NINE MILE POINT 1 06-P; 67 N/A 08-22-69 08-22-69 26.7 26.7 DPR-63
- 20. DRESDEN 2 11-17-47 N/A 12-22-69 12-22-69 25.1 25.1 DPR-19
- 21. ROBINSON 2 11-26-65 11-26-68 07-31-70 09-23-70 20.1 21.9 DPR-23
- 22. MONTICELLO 11-08-68 11-08-68 09-08-70 01-19-71 22.0 26.3 DPR-22 2!. POINT BEACH 1 03-18-69 11-18-71 10-05-70 10-05-70 18.5 18.5 DPR-24
- 24. MILLSTONE 1 03-18-68 N/A 10-06-70 10-26-70 30.6 31.2 DPR-21
- 25. DRESDEN 3 11-17-67 07-24-70 01-12-71 03-02-71 37.8 39.5 DPR-25
- 26. PALISADES 11-05-68 11-05-68 03-24-71 10-16-72 28.6 47.3 DPR-20
- 27. QtlAD CITIES 1 09-03-68 11-19-70 10-01-71 12-14-72 36.9 51.3 DPR-29
- 28. Ih7IAN POINT 2 10-15-68 10-15-71 10-19-71 09-28-73 36.1 59.4 DPR-26
- 29. P01.1T BEACH 2 03-18-69 11-11-71 11-16-71 03-08-73 31.9 47.6 EPR-27
- 30. VERMCNT YANKEE 1 01-05-70 12-21-72 03-21-72 02-28-73 26.5 37.7 DRP-28 31 QUAD L7 TIES 2 09-03-68' 11-19-70 03-31-72 12-14-72 42.9 51.3 DPR-30
- 32. SURRY 1 01-21-70 12-02-70 05-25-72 05-25-72 16.1 16.1 DPR-32
- 33. PILGRIM i 01-05-70 11-01-70 06-08-72 39-15-72 29.1 32.3 DPR-35
- 34. TURKEY POIh? 3 05-12-67 11-08-71 07-19-72 07-19-72 38.2 38.2 DPR-31
- 36. SURRY 2 01-20-70 12-02-70 01-29-73 01-29-73 36.3 36.3 DPR-37
- 37. OCONEE 1 06-02-69 10-18-71 02-06-73 02-06-73 44.1 44.1 DPR-38
- 38. ZION 1 11-25-70 N/A 04-06-73 10-19-73 28.3 34.8 DPR-39
- 39. TURKEY POINT 4 05-12-69 11-08-71 04-10-73 04-10-73 46.9 46.9 DPR-41
- 40. FORT CALHOUN 1 11-28-69 11-04-71 05-23-73 08-07-73 41.8 44.3 DPR-40
- 41. BROWHS FERRY 1 09-25-70 N/A 06-26-73 12-20-73 33.0 38.8 DPR-33
- 02. PEACH BOTTOM 2 08-31-70 11-08-71 08-08-73 12-14-73 35.2 39.4 DPR-44
'3. PRAIRIE ISLAND 1 02-01-71 05-17-71 08-09-73 04-05-74 30.2 38.1 DPR-42
- 44. OCONEE 2 06-02-69 10-18-71 10-06-73 10-06-73 52.1 52.1 DPR-47
- 45. ZION 2 11-25-70 N/A 11-14-73 11-14-73 35.6 35.6 DPR-48
- 46. FORT ST VRAIN 11-07-69 12-28-70,
12-21-73 12-21-73 49.4 49.4 DPR-34
- 47. KEWAUNEE 01-30-71 11-08-71 12-21-73 12-21-73 34.7 34.7 DPR-43
- 48. COOPER STATION 03-01-71 09-24-71 01-18-74 01-18-74 34.5 34.5 DPR-46
- 49. DUANE Ai!NOLD 05-09-72 11-15-71 02-22-74 02-22-74 21.4 21.4 DPR-49 w
OPERATING UCENSESISSUED PACE a
MAY 2,1980 g3 EL APSED 4(2)g ELAPSED 5
FSAR ER FULL
- MONTHS TO MONTHS TO DOCKET DOCKET INITIAL POWER INITIAL FULL POWER LICENSE PLANT DATE DATE LICENSE LICENSE LICENSE LICENSE NUMBER
- 50. THREE MILE ISLAND 1 03-02-70 10-01-70 04-19-74 06-24-74 49.5 51.7 DPR+50
- 52. BROWNS FERRY 2 09-25-70 N/A 06-28-74 08-02-74 45.1 46.2 DPR-52
- 53. PEACH BOTTOM 3 08-31-70 11-08-71 07-02-74 07-32-74 46.0 46.0 DPR-56
- 54. OCONEE 3 06-02-69 10-18-71 07-19-74 07-19-74 61.5 61.5 DPR-55 01-04-71 11-08-71 07-31-74 07-31-74 42.9 42.9 DFR-53
- 55. CALVERT CLIFFS 1
- 56. HATCH 1 03-22-71 02-17-71 08-06-74 10-13-74 40.4 42.7 DPR-57
- 57. RANCHO SECO 1 04-29-71 11-15-72 08-16-74 08-16-74 39.5 39.5 CPR-54
- 58. FITZPATRICK 06-04-71 05-22-71 10-17-74 10-17-74 40.4 40.4 DPR-59
- 59. COOK 1 02-02-71 11-08-71 10-25-74 10-25-74 44.7 44.7 DPR-38
- 60. PRAIRIE ISLAND 2 02-01-71 05-17-71 10-29-74 10-29-74 44.9 44.9 DPR-60
- 61. BRUNSWICK 2 10-03-72 11-08-71 12-27-74 12-27-74 26.8 26.8 CPR-62
- 62. MILLSTONE 2 08-14-72 11-15-71 08-01-75 09-30-75 35.5 37.5 DPR-65
- 63. TROJAN 02-09-73 05-29-70 11-21-75 11-21-75 33.4 33.4 NPF-1
- 64. INDIAN POINT 3 12-04-70 11-13-73 12-12-75 04-05-76 60.2 64.0 DPR-64
- 65. BEAVER VALLEY 1 10-18-72 01-05-72 01-30-76 07-02-76 39.4 44.4 DPR-66
- 67. BROWHS FERRY 3 09-25-70 09-25-70 07-02-76 08-18-76 69.2 70.7 DPR-68
- 68. CALVERT CLIFFS 2 01-04-71 11-08-71 08-13-76 11-30-76 67.3 70.8 DPR-69
- 69. SALEM t 08-25-71 11-08-71 08-13-76 12-01-76 59.6 63.2 DPR-70
- 70. BRUNSWICK 1 10-03-72 11-08-71 09-08-76 11-12-76 47.1 49.3 DPR-71
- 71. HORTH ANNA 1 05-02-73 03-15-72 11-26-76 04-01-78 42.8 58.9 NFF-4
- 72. DAVIS-BESSE 1 03-31-73 01-04-73 04-22-77 04-22-77 48.7 48.7 NPF-3
- 73. FARLEY 1 08-30-73 08-30-73 06-25-77 06-25-77 45.8 45.8 NPF-2
- 74. CRYSTAL RIVER 3 02-08-71 01-03-72 12-03-77 01-28-77 81.8 71.6 DPR-72
- 75. COOK 2 02-01-71 11-08-71 12-23-77 12-23-77 82.7 82.7 DPR-74
- 76. THREE MILE ISLAND 2 *w 04-04-74 04-16-75 02-08-78 02-08-78 46.1 46.1 DPR73
- 77. HATCH 2 10-31-75 10-31-75 06-13-78 06-13-78 31.4 31.4 HPF-5
- 78. ARKANSAS 2 04-17-74 04-17-74 07-18-78 12-14-78 51.0 55.9 NPF-6 (317 9. SEQUOYAH 1 01-31-74 N/A 02-29-80 N/A 72.1 N/A DPR-77 (380. NORTH ANNA 2 05-02-73 03-15-72 04-11-80 N/A 83.3 N/A NPF-7 (3181 SALEr1 2 08-25-71 07-02-71 04-18-80 N/A 103.9 N/A DPR-75 YEAR AVERAGE A Over 50~.of rated power ISUED IN MONTHS
.S FY 1959 1
15.6 LICENSED TO OPERATE 67 FY 1960 1
g.7
- LICENSES TERMINATED 6 N$
- SHUTDOWN 5 34 FY 1963 3
19.g (3) LICENSED FOR LOW POWER TESTING 3 FY 1964 2
23.3 FY 1965 0
0 FY 1966 1
22.9 FY 1967 3
16.7 (1) This is determined by counting the number of months fY h '
between the FSAR Docket Date and the initial License 2
FY 1970 3
22.4 FY 1971 4
28.8 (2)
N jN l
g This is determined by counting the number of months FY 1974 FY 1975 42.1 between the FSAR Docket Date and the Full Power 14 FY 1976 38.5 License Date.
5 8
FY 1977 51.5 4
FY 1978 51.8 FY 1979 52.8 (3) Restricted to 5% power.
4 0
FY 1980 0
0 72.1 Since 1959, 81 Operating Licenses have teen iewed.
CONSTRUCTION PERMITS ISSUED IN PSAR CONSTRUCTION D K T D
T MB R FACILITY NAME ISSUED N M ER 050-00010 (LIC) DRESDEN 1 (02003 04/01/55C N/A 05/04/56C 13.1 CPPR-2 050-00003 (LIC) INDIAN POINT 1 (0265) 04/02/55C N/A 05/04/56C 13.0 CPPR-1 050-00016 (WD ) ENRICO FERMI 1 (0061) 01/ 07/56 C N/A 08/05/56C 6.9 CPPR-4 050-00029 (LIC) YANKEE-RDWE 1 (0175) 07/09/56C N/A 11/04/57C 15.8 CPPR-5 115-0000t- (WD 3 ELK RIVER (0022) 03/15/59C N/A 01/09/60C 9.8 CAPR-1 115-00002 (WD ) PIGUA (0011) 04/13/59C N/A 01/28/60C 9.5 CAPR-2 050-00144 (WD ) CVTR C0017) 07/09/59C N/A 05/04/63C 9.8 CPPR-7 050-00130 (WD ) PATHFINDER (0058) 04/01/59C N/A 05/12/60C 13.3 CPPR-8 050-00155 (LIC) BIG ROCK POINT 1 (0075) 01/18/6 0 C N/A 05/31/60C 4.4 CPPR-9 115-00003 (WD ) HALLAM (0075) 02/15/59C N/A 06/28/60C 16.4 CAPR-3 115-00004 (WD ) BONUS (0017) 12/15/5 9 C N/A 07/19/60C 7.1 CAPR-4 050-00133 (LIC) HUMBOLDT BAY (0065) 04/30/59C N/A 11/09/60C 18.3 CPPR-10
-050-00171 (WD.) PEACH BOTTOM 1 (0040) 07/25/60C N/A 02/23/62C 18.9 CPPR-12 050-00409 (FTL) LA CROSSE (0050) 11/05/62C N/A 03/29/63C 4.8 CAPR-5 050-00206 (FTL) SAN ONOFRE 1 (0430) 02/04/63C N/A 03/02/64C 12.9 CPPR-13 050-00213 (LIC) HADDAM NECK (0575) 09/09/63C N/A 05/26/64C 8.5 CPPR-14 050-00219 (FTL) OYSTER CREEK 1 (0640) 03/30/64C N/A 12/15/54C 8.5 CPPR-15 050-00220 YLIC) HINE MILE POINT 1 (061J) 04/0 ?/64C N/A 04/12/65C 12.3 CPPR-16 050-00237 (FTL) DRESDEN 2 (0809) 04/15e 5C N/A 01/10/66C 8.8 CPPR-18 050-00244 (FTL) GINNA (0490) 11/01/65 C N/A 04/25/66C 5.8 CPPR-19 050-00245 (FTL) MILLSTONE 1 (0652) 11/15/65C N/A 05/19/66C 6.1 CPPR-20 050-00247 (LIC) INDIAN POINT 2 (0873) 12/06/65C N/A 10/14/66C 10.2 CPPR-21 050-00249 (LIC) DRESDEN 3 (0809) 02/10/66C N/A 10/14/66C 8.1 CPPR-22 050-00254 (LIC) QUAD CITIES 1 8 2 (0800) 05/31/66C N/A 02/15/67C 8.4 CPPR-23824 050-00255 (FTL) PALISADES (0700) 06/03/66C N/A 03/14/67C 9.3 CPPR-25 050-00261 (FTL) ROBINSON 2 (0700) 07/25/66C N/A 04/13/67C 8.6 CPPR-26 050-00250 (LIC) TURKEY POINT 3 8 4 (0646) 03/28/66C.
N/A 04/27/67C 12.9 CPPR-27828 050-00259 (LIC) BROWNS FERRY 1 8 2 (1067) 07/13/66C N/A 05/10/67C 9.9 CPPR-29830 050-00263 (FTL).MONTICELLO (0545) 08/08/66C N/A 06/19/67C 10.3 CPPR-31 050-00266 (LIC) POINT BEACH 1 (0497) 08/31/6 6 C N/A 07/19/67C 10.6 CPPR-32 050-00269 (LIC) OCONEE 1,
2 8 3 (0871) 12/01/66C N/A 11/06/67C 11.1 CPPR-33,34835 050-00271- (LIC) VERMONT YANKEE 1 (0514) 12/02/66C N/A 12/11/67C 12.3 CPPR-36 050-00277 (LIC) PEACH BOTTOM 2 8 3 (1065) 02/13/67C N/A 01/31/68C 11.6 CPPR-37838 050-00275 (OL) DIABLO CANYON 1 (1084) 01/18/67C N/A 04/23/68C 15.1 CPPR-39 050-00289 (LIC) THREE MILE ISLAND 1 (0819) 05/03/67C N/A 05/18/68C
??.5 CPPR-40 050-00298 (LIC) COOPER STATION (0778) 07/27/67C N/A 06/04/68C 10.2 CPPR-42 050-00285 (LIC) FORT CALHOUN 1 (0457) 04/18/67C N/A 06/07/68C 13.6 CPPR-41 050-00280 (LIC) SURRY 1 8 2 (0788) 03/20/67C N/A 06/25/68L 5.1 CPPR-43844 050-00282 -(LIC) PRAIRIE ISLAND 1 1 2 (0530) 04/07/67C N/A 06/25/68C
.w.6 CPPR-45846 050-00301 (LIC) POINT BEACH 2 (0497) 08/03/67C N/A 07/25/68C 11.7 CPPR-47 090-00296 (LIC)' BROWNS FERRY 3 (1067) 07/17/67C N/A 07/31/68C 12.4 CPPR-48 050-00305- (LIC) KEWAUNEE (0541) 08/23/67C N/A 08/06/68C 11.4 CPPR-50 050-00293 (LIC) PILGRIM 1 (0670) 06/30/67C N/A 08/26/68C 13.8 CPPR-49 050-00267 (LIC) FORT ST VRAIN (0330) 10/20/66C N/A 09/17/68C 22.9 CPPR-54 050-00272 (LIC) SALEM 1 8 2 (1090) 12/13/66C N/A 09/25/68C 21.4 CPPR-52853 050-00302 (LIC) CRYSTAL RIVER 3 (0825) 08/10/67C N/A 09/25/68C 13.5 CPPR-51 050-00312 (LIC) RANCHO SECO 1 (0913) 11/20/67C N/A 10/11/68C 10.7 CPPR-56 050-00309 (LIC) MAINE YANKEE (0790) 09/27/67C N/A 10/21/68C 12.8 CPPR-55 050-00313 (LIC) ARKANSAS 1 (0850) 11/29/67C N/A 12/06/68C 12.2 CPPR-57 050-00295 (LIC) ZION 1 8 2 (1050) 07/12/67C N/A 12/26/68C 17.4 CPPR-58859 050-00315 (LIC) COOK 1 8 2 (1060) 12/20/67C N/A 03/25/69C 15.1 CPPR-60861 050-00317 (LIC) CALVERT CLIFFS 1 8 2 (0845) 01/25/68C N/A 07/0//69C 17.4 CPPR-63464 050-00286 (LIC) INDIAN POINT 3 (0965) 04/26/67C N/A 08/13/69C 27.5 CPPR-62 1 050-00321 (LIC) NATCH 1 (0786) 05/06/68C N/A 09/30/69C 16.8 CPPR-65
)
g 050-00320 (LIC) THREE MILE ISLAND 2 (0906) 04/29/68C N/A 11/04/69C 18.1 CPPR-66 i
050-00324 (LIC) BRUN3 WICK 1 8 2 (0821) 07/31/68C N/A 02/07/70C 18.2 CPPR-67868 (CONTINUED ON NEXT PAGE) j
i l
CONSTRUCTION PERMITS ISSUED PSAR ER DOCKET DOCKET DOCKET CP ELAPSED CCNSTRUCTION NUMBER FACILITY HAME DATE DATE ISSUED MONTHS PERMIT NUMBER 050-00333 ( f.IC ) FITZPATRICK (0821) 12/31/68C H/A 05/20/70C 16.6 CPPR-71 050-00327 (LIC) SEQUDYAH 1 8 2 (1148) 10/15/68C H/A 05/27/70C 19.4 CPPR-72873 050-00331 (LIC) DUANE ARNOLD (0535) 11/04/65C H/A 06/22/70C 19.6 CPPR-70 050-00334 (LIC) BEAVER VALLEY 1 (0852) 01/15/69C N/A C6/26/7CC 17.3 CPPR-75 050-00335 (LIC) SY LUCIE 1 (0907) 01/29/69C N/A 07/01/70C 17.0 CPPR-74 050-00323 (OL) DIABLO CANYOH 2 (1106) 07/01/68C N/A 12/09/70C 29.2 CPPR-69 050-00336 (LIC) MILLSTONE 2 (0828) 02/28/69C N/A 12/11/70C 21.4 CPPR-76 9
050-00344 (LIC) TROJAN (1130) 06/25/69C N/A 02/08/71C 19.4 CPPR-79 050-00338 (LIC) NORTH ANNA 1 (0907) 03/21/69C N/A 02/19/71C 22.9 CPPR-77178 050-00346 (LIC) DAVIS-BESSE 1 (0906) 08/01/69C N/A 03/24/71C 19.7 CPPR-80 050-00348 (LIC) FARLEY 1 & 2 (0829) 10/15/69C 09/11/70C 08/16/72C 34.0 CPPR-55886 050-00341 (OL) EHRICO FERMI 2 (1993) 04/29/69C 09/16/70C 09/27/72C 40.9 CPPR-87 050-00358 (OL) ZIMMER 1 (08 10) 04/06/70C 06/22/71C 10/27/72C 30.7 CPPR-88 050-00368 (LIC) ARKANSAS 2 (0912) 09/17/70C 09/17/70C 12/06/72C 26.6 CPPR-89 050-00329 (OL) MIDLAND 1 & 2 (0458) 10/30/68C 07/27/70C 12/15/72C 49.5 CPPR-81882 050-00366 (LIC) HATCH 2 (0795) 09/11/70C 02/15/71C 12/27/72C 27.5 CPPR-90 050-00390 (OL) WATTS BAR 1 8 2 (1177) 05/18/71C 05/18/71C 01/23/73C 20.1 CPPR-91192 050-00369 (OL) MCGUIRE 1 & 2 (1180) 09/18/70C 03/09/71C 02/23/73C 29.1 CPPR-83884 050-00397 (OL) WASHINGTON NUCLEAR 2 (1100) 08/19/71C 08/18/71C 03/19/73C 19.0 CPPR-93 050-00395 (OL) SUMMER 1 (0900) 06/30/71C 06/30/71C 03/21/73C 20.7 CPPR-94 050-00322 (OL) SHOREHAM (0819) 05/15/68C 06/10/70C 04/14/73C 55.9 CPPR-95 050-00363 (PCP) FORKED RIVER (1070) 06/01/70C 01/15/72C 07/10/73C 37.3 CPPR-96 050-00373 (OL) LASALLE 1 8 2 (1078) 11/03/70C 11/03/70C 09/10/73C 34.2 CPPR-998100 050-00361 (OL) SAN OHOFRE 2 8 3 (1100) 06/01/70C 01/03/72C 10/18/73C 40.5 CPPP-97893 050-00387 (OL) SUSQUEHANNA 1 & 2 (1050) 04/01/71C 06/01/71C 11/02/73C 31.0 CPPR-1011102 050-00367 (PCP) BAILLY 1 (0645) 08/24/70C 03/24/71C 05/01/74C 44.2 CPPR-104 050-004 2 (PCP) BEAVER VALLEY 2 (0852) 10/20/72C 10/20/72C 05/03/74C 18.4 CPPR-105 053-00352 (PCP) LIMERICK 1 8 2 (1065) 02/27/70C 10/30/70C 06/19/74C 51.7 CPPR-1068107 050-00410 (PCP) HINE MILE POINT 2 (1100) 06/15/72C s06/15/72C 06/24/74C 24.3 CPPR-112 050-00424 (PCP) V0GTLE 1,2,3,4 (1113) 02/13/73C 02/13/73C 06/28/74C 16.5 CPPR-108.109,110,111 050-00404 (PCP) NORTH ANNA 3 8 4 (0907) 09/15/71C 03/15/72C 07/26/74C 34.3 CPPR-1148115 050-00423 (PCP) MILLSTONE 3 (1156) 02/10/73C 02/10/73C 08/09/74C 17.9 CPPR-113 050-00416 (OL) GRAND GULF 1 8 2 (1250) 11/17/72C 11/17/72C 09/04/74C 21.5 CPPR-1181119 050-00354 (PCP) HOPE CREEK 1 8 2 (1067) 02/27/7DC ut/28/71C 11/04/74C 56.2 CFPR-120&121 050-00382 (OL) WATERFORD 3 (1113) 12/19/70C 01/15/71C 11/14/74C 46.8 CPPR-103 050-00445 (OL) COMANCHE PEAK 1 & 2 (1150) 07/20/73C 07/20/73C 12/19/74C 16.9 CPPR-1261127 050-00434 (WD ) SURRY 3 8 4 (0859) 05/29/73C 09/14/73C 12/20/74C 18.7 CPPR-1241125 050-00438 (OL) BELLEFONTE 1 8 2 (1213) 06/21/73C 06/21/73C 12/24/74C 18.1 CPPR-1228123 050-00413 (OL) CATAWBA 1 8 2 (1153) 10/27/72C 10/27/72C 08/07/75C 33.3 CPPR-1168117 050-00498 (OL) SOUTH TEXAS 1 &2 (1250) 07/05/74C 07/05/74C 12/22/75C 17.5 CPPR-1288129 050-00460 (PCP) WASHINGTON NUCLEAR 1 (1218) 10/18/73C 08/20/73C 12/24/75C 28.1 CPPR-134 050-00456 (OL) BRAIDWOOD 1 & 2 (1120) 09/20/73C 09/20/73C 12/31/75C 27.3 CPPR-1328133 050-00454 (OL) BYRON 1 8 2 (1120) 09/2c/73C 09/20/73C 12/31/75C 27.3 CPPR-1308131 050-00461 (PCP) CLIHTON 1 & 2 (0933) 10/30/73C 10/30/73C 02/24/76C 27.8 CPPR-1378138 050-00483 (PCP) CALLAWAY 1 & 2 (1120) 06/21/74C 07/30/74C 04/16/76C 21.8 CPPR-139&t40 050-00528 (PCP) PALO VERDE 1,2,3 (1238) 10/07/74C 10/07/74C 05/25/76C 19.6 CPPR-141,1428143 050-00443 (PCP) SEABROOK 1 8 2 (1200) 07/09/73C 07/09/73C 07/07/76C 35.9 CPPR *358136 050-00458 (PCP) RIVER BEND 1 8 2 (0934) 09/24/73C 09/21/73C 03/25/77C 42.1 CPP R-t ae 58146 050-00389 (PCP) ST LUCIE 2 (0812) 05/15/73C 08/31/73C 05/02/77C 47.5 CPPR-144 050-00440 (PCP) PERRY 1 8 2 (1205) 06/25/73C 06/25/73C 05/03/77C 46.2 CPPR-1488149 050-00518 (PCP) HARTSVILLE A1,A2,B1,B2 (1233) 11/22/74C 09/13/74C 05/09/77C 31.8 CPPR-150,151,152,153 050-30482 (PCP) WOLF CREEK 1 (1150) 07/26/74C 05/17/74C 05/17/77C 36.0 CPPR-147 050-00485 (PCP) STERLING 1 (1150) 06/21/74C 12/20/74C 09/01/77C 38.3 CPPR-156 050-00484 (WD ) TYRONE 1 (1150) 06/21/74C 08/29/74C 12/27/77C 42.2 CPPR-157 050-00491 (PCP) CHEROKEE 1,2,3 (1280) 05/24/74C 06/28/74C 12/30/77C 43.2 CPPR-167,168,169
CONSTRUCTION PERMITS ISSUED I"
CONSTRUCTIO$!
PSAP'T DOCKET ER ELAPSED PERMIT NUMBER FACILITY NAME D
cp D
T ISSUED MONTHS HUMBER 050-00553 (PCP) PHIPPS BEND 1 &2 (1233) 11/07/75C 04/01/76C 01/16/78C 26.3 CPPR-162,163 050-00400 (PCP) HARRIS 1,2,3,4 (0900) 09/17/71C 09/07/71C 01/27/78C 76.6 CPPR-158,15 9,16 0,161 050-00513 (PCP) WASHINGTON NUCLEAR 4 (1218) 10/18/73C 08/20/73C 02/21/78C 54.0 CPPR-174 050-00546 (PCP) MARBLE HILL 1 82 (1130) 09/17/75C 09/11/75C 04/04/78C 30.7 CPPR-17u,171 050-00508 (PCP) WASHINGTON NUCLEAR 385 (1242) 08/02/74C '09/30/74C 04/11/ 78C 44.3 CPPR-154,155 050-00566 (PCP) YELLOW CREEK 1 8 2 (1300) 07/16/76C 12/20/76C 11/29/78C 28.4 CPPR-172,173 P50-00516 (PCP) JAMESPORT 1 & 2 (1150) 09/06/74C 09/17/74C 01/04/79C 51.9 CPPR-375,176 AVERAGE YEAR ISSUED (IN MONTHS)
FY 1956 2
13.1 FY 1957 1
6.9 FY 1958 1
15.8 (1) This is the ditforene between the Docket Date and the CP
- l*
10 9
- o '-
FY 1961 0
FY 1962 1
18.9 FY 196
- Includes Harris 14 delayed hr years by app 1tcant.
- E RCLUCE S HARRI S I - 4 FY 1965 2
10.4 FY 1966 3
6.9 FY 1967 8
97 FY 1968 10 12.7 FY 1969 12 14.6 FY 1970 9
19.0 FY 1971 6
21.7 FY 1972 0
0 FY 1973 11 32.6 FY 1974 9
M1 FY 1975 3
28.8 FY 1976 g
26.3
[y }lN E4$+ <39.41
- FY 1979 2
42 118 APPLICATIONS SINCE 195,174 UNITS H AVE BEEN GR ANTED CONSTRUCTION PERMITS.
O
e LIMITEDWORK AUTHORIZATIONS ISSUED (LW4 l's AND LWA-Ts ISSUED. DURAT10NS ARE FROM ER DOCKETING DATE.)
DATA AS OF: MAY 2,1980 ER LWA-1 ELAPSED LWA-2 ELAPSED APPLICATION DOCKETED ISSUED MONTHS ISSUED MONTHS 1
GRAND GULF 1 &2 11-17-72 05-03-74 17.5 07-14-74 41.9 2.
WATERFORD 01-15-71 05-16-74 39.9 3.
CATAWBA 1 & 2 10-27-72 05-16-74 18.7 4.
V0GTLE 1-4w 02-13-73 05-28-74 15.5 5.
MILLSTOHE 3 02-10-73 06-05-74 15.9 6.
BELLEFONTE 1 8 2 06-21-73 09-17-74 14.8 7.
SURRY 3 4 4 09-14-73 10-04-74 12.6 8.
CCMANCHE PEAK 1 4 2 07-20-73 10- 17-74 14.9 10-17-74
- 14. 9 9.
PERRY 1 3 2 06-25-73 10-21-74 15.9 09-09-75u*
29.7 10.
BYRON 1 1 2 09-20-73 12-13-74 14.7 10-30-75 25.3 11 BRAIDWOOD 1 8 2 09-20-73 01-13-75 15.7 10-30-75 25.3 12.
ST. LUCIE 2 08-31-73 03-17-75 18.6 03-17-75 18.6 13.
WPPSS 1 & 4 08-20-73 08-01-75 23.3 08-01-75**w 23.3 14.
SUMMIT 1 8 2 08-16-73 08-07-75 25.3 15.
SOUTH TEXAS 1 1 2 07-05-74 08-12-75 13.2 16.
CALLAWAY 1 3 2 07-30-74 08-14-75 13.7 17.
RIVER BEND 1 & 2 09-21-73 09-05-75 23.4 18.
CLINT0H 1 12 10-30-73 10-01-75 23.1 19.
DAVIS BESSE 2 8 3 08-09-74 12-31-75 16.7 09-13-78 49.1 20.
HARTSVILLE 1-4 09-13-74 04-22-76 19.3 12-27-76 27.9 21 CHEROKEE 1,
2, 3,
06-28-74 05-28-76 23.0 07-28-77 25.0 22.
WOLF CREEK 06-21-74 01-24-77 30.3 01-24-77 30.3 23.
WPPS 3 4 5 09-30-74 04-08-77 30.3 24.
MARDLE HILL 1 4 2 09-11-75 08-24-77 23.4 te-09-77 26.9 25.
PHIPPS BEND 1 & 2 04-01:76 10-18-77 18.6 26.
YELLOW CREEK 1 1 2 12-20-76 02-09-78 13.6 27.
BLACK FOX 1 & 2 12-23-75 07-26-78 31.0 uv0GTLE 3 8 4 WERE CANCELLED SUBSEQUENT TO LWA ISSUANCE.
MuPERRY I 8 2 WAS GRANTED AN EXTENDED LWA-2 ON 12-31-75, AND AN AMENDMENT ON MAY 12, 1976 AND SEPT 17,1976 cawTHE WPPSS 1 LWA 1 & 2 WAS EXTENDED ON OCTOBER 2, 1976 WPPS 3 4 4 GRANTED AMENDMENT TO LWA OH MAY 10, 1977 1 18
MAJOR LICEIMED FUEL CYCLE FACILITIES UPDATE BIMONTHLY (LICENSED 8V NRC )
DATA AS OF: MAY 9,19m APPLICANT LOCATION DOCKET LICENSE EXPIRATION HUMBER HUMBER DATE URANIUM HEXAFLUORIDE (UF6) PRODUCTION PLANTS l
ALLIED CHEMICAL CORPORATION METROPOLIS, IL 40-3392 SUB-526 08-31-82 KERR-MCGEE CORPORATION SEQUDYAH, OK 40-8027 SUB-1010 10-31-82 l
URANIUM FUEL PROCESSING 8 FABRICATION PLANTS ATOMICS INTERNATIONAL CANOGA PARK, CA 70-25 SNM-21 09-30-82 BABCOCK & WILCOX LYNCHBURG, VA 70-27 SHM-42 03-31-82 BABCOCK 4 WILCOX APOLLO. PA 70-135 SNM-145 10-31-83 BABCOCK 8 WILCOX LYNCHBURG, VA 70-824 SHM-778 01-31-79WM BABCOCK 4 WILCOX LYNCHBURG, VA 70-1201 SNM-1168 08-31-81 BATTELLE P.H.
LABORATORIES RICHLAND, WA 70-984 SNM-942 06-30-79wM i
COMBUSTION ENGINEERING. INC.
HEMATITE, MO 70-36 SNM-33 03-31-82 COMBUSTION ENGINEERING. INC.
WINDSOR, CT 70-1100 SNM-1067 01-31-81 l
EXXON HUCLEAR COMPANY, INC.
RICHLAND, WA 70-1257 SNM-1227 07-31-79*M GENERAL ATOMIC COMPANY SAN DIEGO,~CA 70-734 SNM-696 08-31-81 GENERAL ELECTRIC COMPANY SAN JOSE, CA 70-1007 SNM-54 (1) 05-31-82 GENERAL ELECTRIC COMPANY WILMINGTON, NC 70-1113 SNM-1097 05-31-81 KERR-MCGEE CORPORATION CRESENT CITY, OK 70-925
$NM-928 04-30-82 l
HUCLEAR FUEL SERVICES, INC.
ERWIN. TN 70-143 SNM-124 02-29-84 TEXAS INSTRUMENTS, INC.
ATTLEBORD, MA 70-33 SNM-23 03-31-79MM U.
S. NUCLEAR, INC.
DAK RIDGE, TN 70-1319 SNM-1315 08-31-78*
UNITED NUCLEAR CORP.
MONTVILLE, CT 70-371 SNM-368 03-31-82 UNITED NUCLEAR CORP.
WOOD RIVER, RI 70-820 SNM-777 06-30-81 WESTINGHOUSE ELECTRIC CORP.
COLUMBIA, SC 70-1151 SNM-1107 (2) 05-31-83 l
PLUTONIUM FUEL & FABRICATION PLANTS BABCOCK 8 WILCOX PARKS TOWNSHIP, PA 70-364 SHM-414 01-31-84 BATTELLE MEMORIAL INSTITUTE WEST JEFFERSON, OH 70-8 SNM-7 02-28-74MM GENERAL ELECTRIC COMPANY VALLECITOS, CA 70-754 SNM-960
~07-31-73*M KERR-MCGEE CORPORATION CRESENT, OK 70-1193 SNM-1174 (3) 04-30-82 WESTINGHOUSE ELECTRIC CORP.
CHESWICK, PA 70-1143 SNM-1120 04-30-74wM WESTINGHOUSE ELECTRIC CORP.
WALTZ MILL, PA 70-698 SNM-770 04-30-80 EXXON NUCLEAR COMPANY OAK RIDGE TN 50-564 (NOT UNDER REVIEW) 1 FUEL REPROCESSING FACILITIES ALLIED-GENERAL NUCL. SER.
BARNWELL, SC 50-332 (4)
-(NOT UNDE 4 REVIEW) l NUCLEAR FUEL SERVICES, IHC.
WEST VALLEY, NY 50-201 (5)
(HOT UNDEL REVIEW)
IRRADIATED FUEL STORAGE FACILITIES GENERAL ELECTRIC MORRIS, IL 70-1308 SHM-1265 08-31-79*W NUCLEAR FUEL SERVICES, INC.
WEST VALLEY, NY 50-201 SHM-857 (6) 04-03-69WW WASTE BURIAL FACILITIES NUCLEAR ENGINEERING SHEFFIELD, IL 27-39 08-00-68wn NUCLEAR ENGINEERING HANFORD, WA 27-48 10-00-68*4 (1) ' FACILITY NOW REDUCED TO R3D #CTIVITIf.S ON LWR FUEL.
(2) ALSO AUTHORIZED TO REVIVE AND STORE 3EALED MIXED OXIDE FUEL RODS AND ASSEMBLE MIXED OXIDE RODS INTO FUEL BUNDLES.
(3)
SHUTDOWN..
(4).CP ISSUED IN 1970.
(5) POL ISSUED IN 1966, CURRENTLY SHUTDOWN.
(6)- LICENSED ALSO FOR SHIPPING AND RECEIVING 70-959 (SNM-984) h CLOSE D0uH PROCEDURES _ Facility permanently Shut down, mwTIMELY RENEWAL. Applicant has tendered application for renewal and.
1-19 may Continue t0 Operate while application is being reviewed.
MAJOR LICENSED FUEL CYCLE FACILmES luctnato av mac NRC LICEf4 SED URANIUM MILES AND OTHER FACILITIES DATA AS OF: MAY 9,1980 APPLICANT LOCATION DOCKET LICENSE EXPIRATION NUMBER NUMBER DATl:
U-MILLS ATLAS MINERALS MOAB, UT 40-3453 SUA-917 04-30-84 BEAR CREEK URANIUM COMPANY 40-8452 SUA-1310 07-31-82 EXXGd COMPANY CONVERSE CO., WY 40-8064
$UA-1064 08-31-81 FEDERAL-AMERICAN PARTHERS RIVERTON, WY 40-4492 SUA-667 01-31-76MM PATHFINDER MINES GAS HILLS, WY 40-2259 SUA-672 01-31-83 PETROTOMICS COMPANY SHIRLEY BASIH, WY 40-6659 SUA-551 04-30-81 RIO ALGOM MIHES LIMITED MOAB, UT 40-6L34 StI A-1119 09-30-82 UNION CARBIDE CORPORATION GAS HILLS, WY 40-299 SUA-648 03-31-76MW WESTERN NUCLEAR, INC.
JEFFREY CITY, WY 40-1162 SUA-56 10-31-73MM MINERALS EXPLORATION SWEETWATER CO., WY 40-8584 SUA-1350 02-16-84 UNITED HUCLEAR MORTON RANCH COHVERSE, WY 40-8602 SUA-1356 05-09-84 PATHFINDER MINES SHIRLEY BASIN, WY 40-6622 SUA-442 09-30-82 TENHESSEE VALLEY AUTHORITY EDGEMONT, SD 40-1341 SUA-816 02-29-76MM EHERGY FUELS HUCLEAR, IHC.
WHITE MESA, UT 40-8687 SUA-1358 08-30-84 PLATEAU RESOURCES, LTD.
BLANDING, UT 40-8674 09-30-84 ENERGY FUELS HUCLEAR, INC.
HANKSVILLE, UT 40-8675 09-30-84 OTHERS WHICH COME UNDER U-MILLS CLEVELAHD CLIFFS IROH COMPANY POWDER RIVER 40-8200 SUA-1199 05-31=79Ma BASIN, WY COTTER CORPORATION JOHNSON CO., WY 40-8511 SUA-1273 08-31-81 EXXON COMPANY CONVERSE CO., WY 40-8102 SUA-1139 07-31-78MW HOLMES AND NARVER, INC.
AHAHEIM, CA 40-8550 SUA-1307 07-31-82 HOMESTAKE MINING COMPANY SAN JUAN CO., UT 40-8434 SUA-1249 06-30-79MM MINERALS EXPLORATION CO.
SWEETWATER CO., WY 40-8348 SUA-1223 01-31-80 PLATEAU, RESOURCES LTD.
GARFIELD CO., UT 40-7869 SUA-1013 09-30-78MM ROCKY MUUHTAIN ENERGY COHVERSE CO., WY 40-8380 SUA-1228 02-29-80 WYCMING MINERAL CORP.
JOHNSON CO., WY 40-8304 SUA-1204 06-30-79WM WYOMING MINERAL CORP.
SD ? LAKE CO., UT 40-8585 SUA-1315 09-30-82 WOLD NUCLEAR Sk'l (WAT ER CO., WY 40-8636 SUA-1329 04-30-83 NUCLEAR DYNAMICS CRLdK CO., WY 40-8663 SUA-1331 04-30-83 KERR MCGEE HUCLEAR CARBON CO., WY 40-8586 SUA-1330 04-30-83 OGLE PFTROLEUM FREMONT CO., WY 40-8693 SUA-1336 08-31-83 JSP CORPORATION JOHHSON CO., WY 40-8684 SUA-1337 08-31-83 ROCKY MOUNTAIN ENERGY CO.
CAMPBELL CO., WY 40-8697 SUA-1338 09-30-83 WYOMING MIN IRIGARY JOHHSON CO., WY 40-8502 SUA-1341 10-31-83 ENERGY RESOURCES SAN JUAN, UT 40-8707 SUA-1351 03-31-84 CLEVELAND CLIFFS CAMPBELL CO., WY 40-8714
$UA-1352 06-30-84 BRUSH WELLMAN DELTA, UT 40-8722 SUA-1354 06-30-84 ENERGY FUELS HUCLEAR, INC.
WHITE MESA, UT 40-8676 SUA-1324 08-30-84 COTTER CORP.
JOHNSON CO. WY 40-8692 09-30-84 l
TETON EXPLORATION CONVERSE CO., WY 40-8728 01-30-85 KERR-MCGEE HUCLEAR CONVERSE CO., WY 40-8728 04-30-85 l
uM TIMELY REHEWAL - Applicant has tendered application for renewal and l
may Continue to Operate while application iS being l
reviewed.
1 20
NUCLEAR STEAM SUPPLY SYSTEM CONTRACTS AWARDED THE HUMBER INSIDE PARENTHESES REPRESENTS TOTAL MWE, AND THE HUMBER PRECEDING THE PARENTHESIS REPRESENTS THE NUMBER OF ORDERS PER VENDOR.
GE W
B&W COMB GAC OTHER TOTAL 8(1145)l20(4327)
THROUGH 1964 5(1590) 5(1287) 1(265) 1(40) 7(4490) 1965 3(2131) 3(2029) 1(330) 1966 9(7732) 6(4947) 3(2561) 2(1157) 20(16397) 30(25522)
E 1967 7(6225) 13(10814) 5(4365) 5(4118)
W 1968 7(6191) 4(4532) 3(2172) 14(12895)
O 7(7203) 1969 3(2944) 3(31893 1(1070) 14(14266)
C) 1970 3(2951) 5(4664) 2(2426) 4(4225) 1971 4(4439) 10(9818) 2(1814) 16(16071) 1972 13(15450) 9(9596) 5(5336) 2(1990) 29(32372) 1973 8(8677) 8(9396) 11(13554) 27(31627)
E 1974 5(6043) 5(5660) 1(1141) 3(3842) 14(16686)
[h 1975 i,76 1977 4(3720) 4(3720) 1978 2(2300) 2(2300) 1979 1980 TOTAL 67(64373) 73(68232) 24(22608) 32(33676) 2(370) 8(1145) 206(190404)
PLANTS CANCELLED DURING CY 1971 THRU 1980 (NOT INCLUDED ABOVE)
GE W
B8W COMB GAC OTHER TOTAL M
1971 4(3860) 4(3860) 1972 1(1171) 2(2300) 3(3471) g C) 1973 5(5400) 2(1860) 7(7060) 1974 6(6928) 2(2336) 6(7190) 3(3518) 2(2320) 19(22292) g 1975 4(4100) 4(4100) c)
1976 3(3400) 3(3400)
E 1977
~
2(2500) 2(2500) l$
1978 HOTE: TO DETERMINE TOTAL ORDERS BY CALENDAR YEAk. BOTH CHARTS MUST BE ADDED.
= WESTINGHOUSE B&W - BABCOCK 8 WILCOX COMB : COMBUSTION CNGINEERING i
GAC GENERAL ATOMIC CORP.
1 21 1
=~-,.
]
1 SECTION ll -
REACTOR LICENSING, CONSTRUCTION, AND OPERATION l
\\
V N
NEW APPLICATIONS FORECAST DATA As oF:
MAY Z 120 CONSTRUCTION PERMIT FORECAST FACILITY PROJECT APPL. ER APPL. PSARl FY 1980.I.NAME UTILITY NUMBER SUS. DATE SUB. DATE I l CARROLL 1 82 COMMONWEALTH EDISON 559 10/00/81 10/00/81 l O P E R ATIN G L. l C E N S E F0 RECAST APPLICANT APPLICANT DOCKET SUBMITS SUBMITS FACILITY NUMBER UTILITY PSAR ENV. RPT.
PALO VERDE 1.2.3 0528-0530 ARIZONA PUBLIC SERVICE 10/05/79C 12/05/79C CALLAWAY 1 82 048380486 UNION ELECTRIC 10/25/79C 10/25/79C CLINTON 1 82 046180462 ILLINDIS POWER 12/01/79C 12/01/79C WOLF CREEK 1 050-00482 KANSAS GAS 8 ELECTRIC 02/21/80C 02/21/80C ST LUCIE 2 050-00389 FLORIDA POWER 8 LIGHT 03/24/80C 03/24/80C PERRY 1 82 044080441 CLEVELAND ELECTRIC ILLUMINATING 06/00/80 06/00/80 SEABROOK 1 8 2 044380444 PUBLIC SERVICE OF NEW HAMPSHIRE 06/00/80 06/00/81 FY 1981 HARRIS 1.2.3.4 0400-0403 CAROLINA POWER 8 LIGHT 10/00/80 10/00/80 LIMERICK 1 82 035280353 PHILADELPHIA ELECTRIC 12/00/80 12/00/80 WASHINGTON NUCLEAR 184 046080513 WASHINGTON PUBLIC POWER SUPPLY S 35/00/81 05/00/81 WASHINGTON NUCLEAR 385 050840509 MASHINGTON PUBLIC POWER SUPPLY S 06/00/81 06/C0/81 SITE R E VIE W FORECAST PROJ TENDER PROJECT NO APPLICANT DATE S. MIDDLE SERVICES SITE SOUIN MIDDLE SERVICES 06/80/80
SPECIAL REVIEWS - NEW APPLICATIONS FORECAST DATA AS OF: ' MAY 2,1980 PROJ TENDER PROJEGI NO APPLICANT DATE FY 1980/81 (HSS)GESSAR-238 NI 447 GENERAL ELECTRIC COMPANY 03/31/80C (NSS)RESAR-412 577 WEST 10/00/81 OTHER SPECIAL REVIEWS FY 1980/81 ( SP ) LWB R 56t ERDA HAVAL REACTORS 03/06/80C (SP)A1W-A ADV. CORE MOD 656 DOE / NAVAL REACTORS 05/00/80 (SP)GCFR PSID 456 HELIUM BREEDER ASSOC 05/00/80 (SP)LMFBR DEV. PLT PSID DOE 05/00/80 (SP)NASAP ALT. FIN. RPT 616 DOE 06/00/80 (SP) TREAT UPGRADE DOE /NRA 10/00/80 SPECIAL REVIEWS - PROJECTED COMPLETION DATES EARLY SITE REVIEWS DOCKET BASELINE CURRENT NUMBER FACILITY NAME DATE DATE FY 1980 050-07510 (ESR)MBLUE HILLS SIfE (0918)
N/S N/S 000-07559 (ESR)MCARROLL SITE (1120)
N/S H/S 000-02463 (ESR)uFULTON SITE (0000)
N/S N/S OTHER SPECIAL REVIEWS FY 1980 330-07448 (SPC)M(SP)FFTF FSAR (0400) 04/01/80 04/00/80 050-00437 (SPC)M(SP)FNP 1-8 (MANUF.) (1150)
N/S N/S 050-00376 (SPC)uMORTH COAST N.S.
(0583)
N/S N/S 000-05482 (SPC)mSNUPPS l-6 (GENERIC) (0000)
N/S N/S STANDARDlZATION REVIEWS FY 1980 050-00470 (PDS)M(NSS)CESSAR SYSTEM 80 (1295)
N/S N/S 050-00560 (PDS)h(BOP)BOPSSAR/BSAR-205 (P000)
N/5 N/S 000-02591 (PDS)M(BOP)ESSAR/BSAR-205 (0000)
N/S N/S 050-00591 (PDS)m(BOP)ESSAR/CESSAR-80 (0000)
N/S N/S 000-07591 (PDS)M(B00)ESSAR/RESAR-414 (0000)
N/S N/S 050-00595 (PDS)m(BOP)GAISSAR (0000)
N/S N/S 050-00584 (PDS)M(BOP)GIBBSSAR (W) (0000)
N/S N/S 000-00595 (PDS)m(BOP)SWESSAR/BSAR-205 (1300)
N/S N/S BOP : BALANCE OF PLANT DESIGN ESR : EARLY SITE REVIEW NSS : NUCLEAR STEAM SYSTEM SUPPLIER 2-3 PDS : PRED0CKETED PRELIMINARY DESIGN REVIEW SP OR SPC : SPECIAL PROJECT
CONSTRUCTION PEP?AIT FORECAST 10 10 FT 1980 FT 1981 r
y 9
- 9 GMPH REFLECTS APPLICRTIONS, MOT (MITS 8
- 8
- o..c.-
Thrs chest shows the October 1,1979 fcro-y"
-y
=
cast of cumulative construction permits (deshed kne) projected g
g to be issued through FY 1980 and 1981. The sohd black kne espre-5
- 5 nonts the actual cumule-tive constructeon permits issued to date, and the g
. g dotted line shows cumu-letsve estimate. Numbers in perentheses are latest 3
- 3 proisetinas.
LEGE ND
~
SUDGET FORECAST ACTUAL COMPLETIONS-LATEST isTIM ATE 0
0 SCT DEC FEB frft
.AM MG SCT M8V DEC JAN FEB MAR APR MRT JUN JUL AUG SEP NOV JM IWWI WT JUL SEP 9UDGET FORECA$7 BV uONTa 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 arisi ssriuAre sv uomrw 0
0 0
0 0
0 0
t 01
( 01 t 01
( 01
( 0) t O!
( 01
( O!
( Ol
( 0) t 01 cuuuuma succer soaEcAst 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 cumuurwe urEst estiuAre 0
0 0
0 0
0 0
t 01
( DI
( 31
( 01
( 01
( 01 t 01 L 01
( 01
( 01
( DI l
FY 1979 VS OCTOGER 1980 FORECAST 14 FPSCAL YEAR 80 motes suuuARY 12 NONE u, cp,,,i;,,,,,,,,,,e compteted 6n April w s Cen.ae,a.:ece.eus.d None are estimated for completion in FY 80 10
,#,,, g py 79 p
w A sch.eus. Ter w.d 5
6
$.m #
2 FY 79 1041-79 CURRENT APPLICATIONS (MWe)
FORECAST ESTIMATE l
uc v.
- m. u.. ou.o. o.no...o..
- o...v,,%. r.
.r re 050-00466 (CP) ALLENS CREEK 1 (1150)
N/S N/S l
050-00556 (CP) BLACK FOX 1 & 2 (1150)
N/S N/S I
050-00502 (CP) HAVEN 1 (AMEND) (0900)
N/S N/S 050-00514 (CP) PEBBLE SPRINGS 1 8 2 (1260)
N/S N/S 050-00488 (CP) PERKINS 1,2,3 (1280)
N/S N/S 050-00471 (CP) PILGRIM 2 (1180)
N/S N/S 050-00522 (CP) SKAGIT 1 8 2 (1277)
N/S N/S M OF AWCATION SE SUPPL FES LlJA PDD j
FACILITY NAME DATE DATE DATE DATE t
l l
ALLENS CREEK 1 COMPLETE COMPLETE N/A N/S BLACK FOX 1 82 COMPLETE COMPLETE COMPLETE N/S NAVEN 1 (AMEND)
N/S N/S N/A N/S PEBBLE SPRINGS 1 &2 N/S COMPLETE N/5 N/S PERKINS 1,2,3 COMPLETE COMPLETE N/A N/S PILGRIM 2 COMPLETE COMPLETE N/S N/S SKAGIT 1 &2 COMPLETE COMPLETE N/S N/S l
CONSTRUCTION PERMIT REVIEW DURATION
SUMMARY
oA7^ AS OF: M AY 2,1980 (DURATIONS OF MAJOR ACTIVITIES FOR APPLICATIONS DOCKETED IN FISCAL YEARS 1974 1979)
DESCMPT KMe THIS CHART REPHESENTS DUR ATIONS ON MONTHS 1 OF MAJOR ACTivtTIES FOR CP APPLICATIONS DOCKETED IN FISCAL YE ARS1974 THROUGH 1979. REVIEWS ARE LISTED IN CHRONOLOGICAL ORDER SY DOCKE1 DATE.
f I
am:og (ms) ll SAF.
ENV.
LWA CP START l APPLICATION PSAR EE SE SUPP Egi (HA SE REY.
Ell.
REV.
EEE.
CONST.
FY 1974 35.9 35.9 SEABROOK 1 82 07-09-73 07-09-73 11-14-75 12-06-74 07-07-76 28.1 16.9 C0!1ANCHE PEAK 1 82 07-20-73 07-20-73 11-15-74 06-07-74 10-17-74 12-19-74 15.8 10.5 14.9 16.9 14.9 OPEN 30.8 DOUGLAS POINT 1 82 08-09-73 08-09-73 OPEN 03-04-76 WASHINGTON NUCLEAR t 10-18-73 08-20-73 10-15-75 03-10-75 08-01-75 12-24-75 23.9 18.6 23.3 26.2 23.3 WASNINGTON NUCLEAR 4 10-18-73 08-20-73 08-06-76 08-01-75 02-21-78 33.6 23.3
$2.1 23.3 BRAIDWOOD 1 8 2 09-20-73 09-20-73 10-17-75 07-19-74 01-14-75 12-31-75 24.9 9.9 15.8 27.3 15.8 BYRON 1 8 2 09-20-73 09-20-73 10-17-75 07-25-74 12-13-74 t?-51-75 24.9 10.1 14.7 27.3 14.7 RIVER BEND 1 82 09-24-73 09-21-73 12-22-75 10-02-74 09-05-75 C3-25-77 26.9 12.3 23.4 42.0 23.4 CLINTON 1 8 2 10-30-73 10-30-73 12-02-75 10-04-74 10-01-75 02-24-75 25.0 11.1 23.0 27.8 23.0 FULTON 1 82 11-16-73 11-14-73 06-30-75 05-05-75 OPEN 19.4 17.7 ALLENS CREEK 1 12-07-73 12-07-73 03-31-79 11-18-74 OPEN 63.8 11.3 PILGRIM 2 12-21-73 12-21-73 01-19-79 05-27-75 OPEN OPEN 60.9 17.2 QUANICASSEE 1 8 2 02-28-74 02-11-74 OPEN OPEN WOLF CREEK 1 07-26-74 05-17-74 11-29-76 10-31-75 01-24-77 05-17-77 28.1 17.4 32.2 33.7 32.2 CHEROKEE 1,2,3 05-24-74 06-28-74 07-11-77 10-01-75 05-28-76 12-30-77 37.5 15.1 23.0 43.2 23.0 PERKINS 1,2,3 05-24-74 06-28-74 07-11-77 10-21-75 OPEN 37.5 15.7 CALLAWAY 1 82 06-21-74 07-30-74 01-23-76 03-21-75 08-14-75 04-16-76 19.0 7.7 12.4 21.8 12.4 STERLING 1 06-21-74 12-20-74 12-01-76 06-28-76 09-01-77 29.3 15.2 38.3 38.3 TYRONE 1 06-21-74 08-29-74 12-01-76 04-28-77 12-27-77 29.3 31.9 42.2 42.2 FY 1975 SOUTH TEXAS 1 4 2 07-05-74 07-05-74 10-29-75 03-28-75 08-12-75 12-22-75 15.8 8.7 13.2 17.5 13.2 MONTAGUE 1 8 2 07-12-74 07-12-74 OPEN 02-22-77 OPEN 31.3 WASHINGTON NUCLEAR 385 08-02-74 09-30-74 04-22-77 06-03-75 04-08-77 04-11-78 32.6 8.1 30.2 44.3 30.2 PEBBLE SPRINGS 1 82 10-18-74 08-06-74 OPEN 04-16-75 OPEN OPEN 8.3 16.7 DAVIS BESSE 2 8 3 08-16-74 08-09-74 OPEN 09-29-75 12-31-75 OPEN 13.6 16.7 BLUE HILLS 1 8 2 08-23-74 OPEN OPEN OPEN KOSHKONONG 1 8 2 08-26-74 09-06-74 07-02-76 OPEN OPEN 22.2 JAMESPORT 1 8 2 09-06-74 C9-17-74 01-17-77 10-07-75 01-04-79 28.3 12.6 51.9 51.9 HARTSVILLE A1,A2,B1,B2 11-22-74 09-13-74 10-20-76 06-25-75 04-22-76 05-09-77 22.9 9.4 19.3 29.5 19.3 BARTON 1 82 09-27-74 11-15-74 OPEN OPEN OPEN SKAGIT 1 8 2 01-15-75 09-30-74 10-20-78 06-02-75 OPEN OPEN 45.1 8.0 PALO VERDE 1,2,3 10-07-74 10-07-74 04-08-76 09-25-75 05-25-76 18 -
11.6 19.6 19.6 NORTH COAST N.S.
01-27-75 01-27-75 04-26-77 26.9 CLINCH RIVER 06-13-75 04-18-75 OPEN 02-07-77 OPEN OPEN 21.8 FY 1976 FORT CALHOUN 2 09-11-75 01-26-76 OPEN 03-13-78 25.5 MARBLE HILL 1 82 09-17-75 09-11-75 07-22-77 09-22-76 08-24-77 04-04-78 22.1 12.3 23.4 30.5 23.4 GREENE COUNTY 01-26-76 09-15-75 OPEN 02-07-79 OPEN 40.7 PHIPPS BEND 1 82 11-07-75 04-01-76 09-23-77 02-17-77 10-18-77 01-16-78 22.5 10.F 18.5 26.3 18.5 BLACK FOX 1 82 12-23-75 12-23-75 09-05-78 02-08-77 07-26-78 OPEN 32.4 13.2 31.1 31.1 YELLOW CREEK 1 82 07-16-76 12-20-76 06-27-78 11-28-77 02-09-78 11-29-78 23.3 11.2 13.6 28.4 13.6 NEW ENGLAND 1 82 09-a9-76 09-09-76 07-20-79 OPEN OPEN 34.3 9m (CONTINUED ON NEXT PAGE) a
i NO CONSTRUCTION PERMIT REVIEW DURATION
SUMMARY
DURATION IMONTHSI A JP LIC A T IO N PS A R ER SE SUPP FES LWA CP SAF.
ENV.
REY.
REV.
R EV.
FY 1977 ERIE t 12 03-01-77 05-02-77 01-25-79 OPEN OPrN CPEN 22.8 SUNDESERT 1 82 04-26-77 04-12-77 OPEN 10-24-78 OPEN CPEN 18.4 FY 1978 PALO VERDE 4 1 5 03-31-78 10-30-78 08-31-79*
08-01-79=
OPEN OPEN 17.0 9.0 FY 1979 NEW HAVEN 1 4 2 12-29-78 01-24-79 OPEN 08-00-80*
OPEN OPEN 18.2 SAFETY ENVIRONMENTAL REVIEW LWA CP FISCAL YEAR REVIEW START OF (NUMBER REVIEW REVIEW CONSTRUCTION CASE DOCKETED (NUMBER (NUMBER (NUMBER (NUMBER OF CASES)
OF CASES)
OF cAsret OF CASES)
OF CASES) 1974 31.1(17) 16.0117) 20.6(10) 33.4(131 24.8(13) 1975 26.4(7) 14.5(11) 19.9(4) 37.7(6) 31.1(7) 1976 26.9(5) 19.0(6) 21.7(4) 28.4(3) 21.7(4) 1977 22.8(1) 18A(1) 1978 17.0(1) 9.0(1) 1979
- (1) 18.2(1)
- ACTIVITY NOT YET COMPLETED
l SAFETY EVALUAil0N SUPPLEMENT DURATION
SUMMARY
(DURAil0NS FOR FINAL SE SJPPLEMENTS ISSUED FOR CP REVIEWS DuelNG FY 1974 1979)
SE SUPMEMENTS BY Fl8 CAL VIAR SE SUITL NT 1 (PCP) HIHE MILE POINT 2 (1100) 06/15772C 08/07/73C 13.7 (PCP) BAILLY I (0645) 08/24/70C 10/31/73C 38.2 (PCP) CATAWBA 1 8 2 (1145) 10/27/72C ot/21/74C 14.8 (OL) WATERFORD 3-(1113) 12/19/70C 02/01/74C 37.4 (PCP) NORTH M;H A 3 8 4 (0907) 09/15/7tC 02/28/74C 29.4 (PCP) HOPI TREEK 1 8 2 (1067) 02/27/70C 03/01/74C 48.1 (PCP) BEAVT VALLEY 2 (0852) 10/20/72C 04/25/74C 18.1 (PCP) V0GTLE 1 8 2 (1113) 02/13/73C 05/01/74C 14.6 (PCP) MILLSTONE 3 (1956) 02/10/73C 05/16/74C 15.2 AVERAGE DURATION 25.5 (FY 1974)
(OL) CRAND GULF 1 8 2 (1250) 11/17/72C 07/24/74C 20.2 (OL) BELLEF0HTE 1 8 2 (1213) 06/21/73C 08/30/74C 14.3 (PCP) SURRY 3 8 4 (0859) 05/29/73C 09/03/74C 15.1 (OL) COMANCHE PEAK t 8 2 (1150) 07/20/73G 11/15/74C 15.8 (PCP) FULTON t 8 2 ( 116 0 )
11/16/73C 06/30/75C 19.4 AVERAGE DURATION 16.9 (FY 1975)
(PCP) WASHINGTOH HUCLEAR 184 (1218) 10/18/73C 10/15/75C 23.9 (OL) BRAIDWOOD 1 8 2 (1120) 09/20/73C 10/17/75C 24.9 (OL) BYROH 1 8 2 (1120) 09/20/73C 10/17/75C 24.9 (OL) SOUTH TEXAS 1 8 2 (1250) 07/05/74C 10/29/75C 15.8 (PCP) SEABROOK 1 8 2 (1200) 07/09/73C tt/14/75C 28.1 (PCP) CLINT0H 1 8 2 (0933) 10/30/73C 12/02/75C 25.0 (PCP) RIVER BEND 1 8 2 (0934) 09/24/73C 12/22/75C 26.9 (PCP) CALLAWAY 1 8 2 (1120) 06/21/74C 01/23/76C 19.0 (PCP) PALO VERDE 1,2,3 (1270) 10/07/74C 04/08/76C 18.0 (PCP) ST LUCIE 2 (0810) 05/15/73C 04/27/76C 35.4 (PCP) KOSHKONONG 1 (0900) 08/26/74C 07/02/76C 22.2 AVERAGE DURATIDH 24.0 (FY 1976)
(PCP) HARTSVILLE A1,A2.BI,B2 (1233) 11/22/74C 10/20/76C 22.9 (PCP) WOLF CREEK 1 (1150) 07/26/74C 11/29/76C 28.1 (PCP) STERLING 1 (1150) 06/21/74C 12/01/76C 29.3 (PCP) TYR0HE 1 (1150) 06/21/74C 12/01/76C 29.3 (CP) JAMESPORT 1 8 2 (1150) 09/06/74C 01/17/77C 28.3 (PCP) PERRY t 8 2 (1205) 06/25/73C 02/22/77C 43.9 (PCP) WASHINGTON HUCLEAR 385 (1242) 08/02/74C 04/22/77C 32.6 (PCP) CHEROKEE 1,2,3 (1280) 05/24/74C 07/tt/77C 37.5 (CP) PERKINS 1,2,3 (1280) 05/24/74C 07/11/77C 37.5 l
(PCP) MARBLE HILL 1 4 2 (1130) 09/17/75C 07/22/77C 22.1 (PCP) HARRIS 1,2,3,4 (0900) 09/17/71C 09/20/77C 72.1 (PCP) PHIPPS BEND 1 8 2 (1233) 11/07/75C 09/23/77C 22.5 AVERAGE DURATION 33.8 (FY 1977)
(PCP) YELLOW CREEK 1 8 2 (1285) 07/16/76C 06/27/78C 23.3 (CP) BLACK FOX 1 8 2 (1150) 12/23/75C 09/05/78C 32.4 AVERAGE DURATION 27.8 (FY 1978)
(CP) SKAGIT 1 8 2 (1277) 01/15/75C 10/20/78C 45.1 (CP) PILGRIM 2 (1180) 12/21/73C 01/19/79C 60.9 (CP) ERIE 1 4 2 (1260) 03/01/77C 01/25/79C 22.8 (CP) ALLENS CREEK 1 (1150) 12/07/73C 03'31/79C 63.8 (CP) HEW ENGLAND t 8 2 (1194) 09/09/76C 07/2G/79C 34.3 AVERAGE DURATION 45.4 (FY 1979)
MAY 2,1980 27
FINAL ENVIRONMENTAL STATEMENT DURATION SUMM ARY MAY & 1980 (DURATIONS FOR FES ISSUANCES FOR CP REVIEWS DURING FY.1974 19791 DURATION (MONTHS)
APPLICATION DOCK TED FES SUPPL.
(CP) BEAVER VALLEY 2 (0852) 10/20/72C 07/19/73C 8.9 (CP) GRAND GULF 1 8 2 (1250) tt/17/72C 08/22/73C 9.1 (CPI LINERICK 1 8 2 (1065) 10/30/70C 11/12/73C 36.4 (CP) CATAWBA 1 8 2 (1145) 10/27/72C 12/07/73C 13.3 (CP) MILLSTONE 3 (1956) 02/10/73C 02/07/74C 11.9 (CP) HOPE CREEK t 8 2 (1067) 01/28/71C 02/19/74C 36.7 (CP) V0GTLE 1 8 2 (1113) 02/13/73C 03/08/74C 12.8 (CP) HARRIS 1,2,3,4 (0900) 09/07/71C 03/29/74C 30.7 (CP) PERRY t i 2 (1205) 06/25/73C 04/09/74C 9.4 (CP) ST LUCIE 2 (0810) 08/31/73C 05/16/74C 8.5 (CP) SURRY 3 8 4 (0859) 09/14/73C 05/31/74C 8.5 (CP) COMANCHE PEAK 1 4 2 (1150) 07/20/73C 06/07/74C 10.5 (CP) BELLEFONTE 1 8 2 (1213) 06/21/73C 06/10/74C 11.6 AVERAGE DURATION 16.0 (FY 1974)
(CP) BRAIDWOOD 1 8 2 (1120) 09/20/73C 07/19/74C 9.9 (CP) BYRON 1 8 2 (1120) 09/20/73C 07/25/74C 10.1 (CP) RIVER BEND 1 8 2 (0934) 09/21/73C 10/02/74C 12.3 (CP) CLINTON 1 82 (0933) 10/30/73C 10/04/74C 11.1 (CP) ALLENS CREEK t (1150) 12/07/73C tt/18/74C 11.3
'CP)
SEABROOK 1 8 2 (1200) 07/09/73C 12/06/74C 16.9 (CP) WASHINGTON NUCLEAR 1 (1218) 08/20/73C 03/10/75C 18.6 (CP) CALLAWAY t 8 2 (1120) 07/30/74C 03/21/75C 7.7 (CP) SOUTH TEXAS 1 8 2 (1250) 07/05/74C 03/28/75C 8.7 (CP) PEBBLE SPRINGS 1 8 2 (1260) 08/06/74C 04/16/75C 8.3 (CP) FULTON 1 8 2 (1160) 11/14/73C 05/05/75C 17.7 (CP) PILGRIM 2 (1180) 12/21/73C 05/27/75C 17.2 (CP) SKAGIT 1 8 2 (1277) 09/30/74C 06/02/75C 8.0 (CP) WASHINGTON NUCLEAR 385 (1242) 09/30/74C 06/03/75C 8.1 (CP) HARTSVILLE A1,A2,81 B2 (1233) 09/13/74C 06/25/75C 9.4 AVERAGE DURATION 11.6 (FY 1975)
(CP) PALO VERDE 1,2,3 (1270) 10/07/74C 09/25/75C 11.6 (CP) DAVIS BESSE 2 8 3 (0906) 08/09/74C 09/29/75C 13.6 (CP) CHEROKEE 1,2,3 (1280) 06/28/74C 10/01/75C 15.1 (CP) JAMESPORT 1 8 2 (1150) 09/17/74C 10/07/75C 12.6 (CP) PERKINS 1,2,3 (1280) 06/28/74C 10/21/75C 15.7 (CP) WOLF CREEK 1 (1150) 05/17/74C 10/31/75C 17.4 (CP) SIERLING 1 (1150) 12/20/74C 06/28/76C 18.2 (CP) MARBLE HILL 1 8 2 (1130) 09/11/75C 09/22/76C 12.3 AVERAGE DURATIGN 14.5 (FY 1976)
AVERAGE DURATION 15.2 (CY 1976)
(CP) CLIWCH RIVER (0350) 04/11/75C 02/ 07/'i 7 C 21.8 (CP) BLACK FOX 1 8 2 (1150) 12/23/75C 02/08/77C 13.5 (CP) PHIPPS BEND 1 8 2 (1233) 04/01/76C J2/17/77C 10.5 (CP) MONTAGUE 1 8 2 (1150) 07/12/74C 02/22/77C 31.3 (CP) TYRONE 1 (1150)*
08/29/74C 04/28/77C 31.9 AVERAGE Dr aTION 21.8 (FY 1977)
(CP) YELLOW CREEK 1 8 2 (1285) 12/20/76C ff/28/77C 11.2 AVERAGE DURATION 11.2 (FY 1978)
(CP) SUNDESERT I 4 2 (0974) 04/12/77C 10/24/78C 18.4 (CP) GREENE COUNTY (1191) og/15/75C 02/07/79C 40.7 AVERAGE DURATION 29.5 (FY 1979) l
- CANCELLED AFTER FES ISSUANCE FOR CP REVIEW g
ACRS FORECAST APmL.,e-NUCLEAR RERCTOR REOULRTION STRNDRRDS DEVELOPMENT DRY NRME STROE/ TYPE DOCKET NO.
ACTIVITY DAY TRSK NO.
TYPE ACTIVITY JUN 02 En801-4 00 FC 04 R$807-5 00 SC 04 R8809-6 00 SC 15 88928-4 00 8C JUL Os R8s02-4 00 8C 09 R8705-4 00 SC 12 R8705-4 00 FC 18 R8809-5 00 FC RUS 15 SUMMER 1 SL/rWR 050003s5 SC SEP 06 $USOUEHANNA 1 4 2 OL/BWR 05000387 FC 04 RSO42-2 00 SC 08 SUMMER 1 SL/FMR OG000396 FC 12 SHOREHMt OL/BWR 05000822 FC OCT 00 LA8ALLE 1 4 2 OL/8HR 05000373 FC 10 FPS 25-5 00 FC 07 SAN ONOFRE 2 4 3 OL/PNR 05000381 FC NOV 05 ENRICO FERMI 2 OL/BWR 05000341 8C 15 88804-9 00 8C 25 WASHINGTON NUCLEAR 2 OL/8HR 05000397 SC TASK 8 TASK DESCRIPTION EM801-4 R.G.
1.139, " GUIDANCE FOR RESIDUAL NEAT REMOVAL" FP925-5 NUCLEAR CRITICALITY SAFETY FOR PIPE INTERSECTIONS CONTAINING AQUEOUS SOLUTIONS OF ENRICHED URANYL NITR ATE RS042-2 RG 1.89-QUALIFICATION OF CLASS IE EQUIPMENT FOR NUCLEAR POWER PLANTS RS705-4 CRITERIA FOR LIGHTNING PROTECTION FOR NPPS RS807-5 REV. 2 TO R.G.
1.8, PERSONNEL SELECTIDH AND TRAINING RS809-5 CABLE PENETRATION FIRE STOP QUALIFICATION TEST FOR NUCLEAR POWER PLANTS RS902-4 REv. 3 TO R.G.
1.33, QUALITY ASSURANCE PROGRAM REQUIREMENTS (OPERATTON)
SS604-9 EXTREME WIND SPEEDS IN COASTAL AREAS FOR THE DESIGN AND OPERATION OF NPP'S SS926-4 R.G.1.23 REV.1 "0NSITE METEOROLOGICAL PROGRAMS" KEY:
FC = FULL COMMITTEE SC = SUBCOMMITTEE AFC = ADDITIONAL FULL COMMITTEE GD = GUIDE N
W
OPERATfNG LICENSE FORECAST (CUMULAVIVE LICENSED FACILITIES AND PROJECTED OL ADDIVIGNS IN FY 86/01) y b
DATA AS OF:
FYt980---------------~~~-----> <-----------FY1981----------
oesca evio.
reme cuar me**asaurs THIS CURRENT CUMULATIVE NUMBER OF ACTUAL OPERATING
~*
LICENSE ISSUANCES (SOLID LINE)
-80
- (80 I AND ESTIMATED ISSUANCES ga s *"" '"" *'" *'",a,,'." F
,74 (DOYTED LINE) DURING FISCAL YE ARS 1980 AND 1981, AS COM-
- m==* "
ON OCTOBER 1,1977 (DASHED
-7; 4
-==-""",,#p
-f~
PARED TO THE PROJECTION MADE UNEL NUMBERS IN PAREN-
_ pg, OL INCREASE THESES REFLECT THE LATEST
- IN > Y 190041 ESTIMATE BEYOND THE CURRENT l' MONTw.
-60 LEGEND r,UDGET FOaECASTemp-aura ACTUAt COMPtf rIONs--,-
LArist astru Art OCT DEC FEB APR JUN AUG OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP NOV JAN MAR MAY JUL SEP TOTAL BUDGET FORECAST BY MONTH 0
0 0
0 0
0 0
0 1
2 1
0 t
t 1
2 1
2 12 LATEST ESTIMATE BY MONTH 0
0 0
0 1
0 2
(0)
(0)
(1)
(0) "(0I (2)
(1)
(1)
(0)
(2)
(0)
(10)
CUMULATIVE BUDGET FORECAST 70 70 70 70 70 70 70 70 71 73 74 74 75 76 77 79 80 82 82 CUMULATIVE LATEST ESTIMATE 70 70 70 71 71 71 73 (73)
(73)
(74)
(74) T7Ti (76)
(77)
(78)
(78)
(80)
(80)
(80)
-95 APPLICATION 104T 79 CONSTRUCTeON CURRENT
-90 FY 79 FORECAST COMPLETION ESTIMATE
-85 FY 1980
-80 75
= = ' ' " * * " ' "
,,,,,,,,4,.-==
10
_g FARLEY 2 (0829) 07/00/80 07/00/80 07/00/80
-60 FIRST SECOND THIRD FOURTH QUARTER QUARTER QUARTER QUARTER LASALLE 1 (1078) 06/30/80 11/00/80 11/00/80
SUMMARY
- O DIABLO CANYON 1 (1084)
N/
07/00/80 12/00/80 As the TMI 2 studies and investigations proceed,it is likely that odotenat actions that must be implemented in the short-term DIABLO CANYON 2 (1106)
N/S 03/00/81 03/00/81 prior to issuance of an operating license will be identified. The SEQUDYAH 2 (1148)
N/S 05/00/81 05/00/81 staff vell complete the necessary rewsws ond report its findings WLTTS BAR 1 (1177) 12/00/80 05/00/81 N/S related to whether such short term eetions must also be imple nented SAN ONOFRE 2 (1100) 06/00/81 05/00/81 06/01/81 l
prior to a decisian to inue an operating license f or each plant.
ZIMMER 1 (0810) 07/30/80 10/00/81 10/00/81 j
Although no formal moratorium has been declared, the quickest ENRICO FERMI 2 (1093)
N/S 11/00/81 11/00/81 that such towews could be completed for any plan. is about SUSQUEHANNA 1 (1050) 04/00/81 12/00/81 12/00/81 WATERFORD 3 (1113) 09/00/81 02/00/82 02/00/82 Sequoyah 1 was granted a license on 02 29-80.
WATTS BAR 2 (1177) 09/00/81 03/00/82 N/S SHOREHAM (0819) 11/00/80 07/00/82 07/00/82 North Anne 2 was granted a license on 04-11-ED.
WASHINGTON NUCLEAR 2 (1100)
C3/00/81 07/00/82 07/00/82 Salem 2 was granted a license on 04-18-80.
NUCLEAR POWER PLANTS UNDER CONSTRUCTION THE SOLID BLACl( LINE ON THit CHART SHOWS THE TOTAL DATA ASOF MAY 2.1980 NUMSE R OF NUCL E AR POWER Pt ANTS, IN UNITS, CURRENTLY AUTHOnllED CONSTRUCYlON ACTIVITY IEITHER LWA OR CP).
THE DOTTED LINE PLOTS f uTURE CONSTRUCTION AUTHORI-EATIONS, MINUS THOSE UNITS PROJECTED TO RECilVE AN OL AND THE DA0HED LINE SHOWS UNITS ACTUALLY kNGAGED IN CONSTRUCTION.
<-------------------FY 1980-------------------><-
FY 1981-------->
100g 70 60 50 40 30 20 10 0
OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP 0-N D-J F-M A-M J-J A-S AUTH0kIZATIONS IN
~
~
~
~
~
~
~
EFFECT_AND ESTIMATED
- J J
J J
__11 _].i._12,_9.2 3
__11 21 2.1 I.f _.II _I.I E I.ft E ACTUAL UNDER CONSTRUCT 10Ha E
E E
E
_Z.2 72 70
- IN UNITS AuTwoRilATIONS GRANito '
LIMITED WORK AUTHORIZATION OR t LW A'S & CP'S IN EFFECT ACTUALLY UNDER CONSTRUCTION _--
CONS 1RUCTION PERMIT GRANTED:
FUTURE AUTHORilATIONS mee SUMMER 1 03-21-73 SUSQUEHANNA 1 82 05-28-74
~
- ACTIVELY UNDER CONSTRUCTION i
WPPSS 2 03-19-73 FACILITY AUTH. DATE WPPSS 4 08-01-75 WPPSS 3 8 5 04-08-77 WATERFORD 3 05-14-74 BAILLY 1 05-01-74 WAT1S BAR 1 82 01-23-73 BEAVER VALLEY 2 05-03-74 WOLF CREEK 01-24-77 BELLEFONTE 1 42 09-17-74 YELLOW CREEK 1 02-09-78 BYRON 1 8 2 12-13-74 ZIMMER 1 10-27-E2 CALLAWAY 1 08-14-75 CATAWBA 1 4 2 05-16-74 CHEROKEE 1 8 2 05-28-76 TOTAL - 70 UNITS CLINTON 1 10-01-75 COMANCHE PEAK 1 82 10-17-74 DIABLO CANYON 1 04-23-68 WAUTHORIZED BUT NOT UNDER CONSTRUCTION DIABLO CANYON 2 12-09-70 FARLEY 2 08-16-72 FERMI 2 09-27-72 FACILITY AUTH. DATE GRAND GULF 1 82 05-03-74 I
HARRIS 1 8 2 01-01-74 HARTSVILLE 1 82 04-22-76 BLACK FOX 1 82 07-26-18 HOPE CREEK 1 42 11-04-74 BRAIDWOOD 1 82 01-13-75 LASALLE 1 82 09-10-73 CALLAWAY 2 08-14-75 LIMERICK 1 82 06-19-74 CHEROKEE 3 05-28-76 MARSLE HILL 1 82 08-24-77 CLINTON 2 10-01-75 MCGUIRE 1 82 02-23-73 DAVIS BESSE 2 8 3 12-31-75 MIDLAND 1 82 12-15-72 FORKED RIVER 07-10-73 MILLSTONE 3 06-05-74 HARRIS 3 4 4 01-01-74 NINE MILE POINT 2 06-24-74 HARTSVILLE 3 8 4 04-22-76 PALO VERDE 1 28 3 05-25-76 JAMESPORT 1 82 01-04-79 PERRY 1 82 10-21-74 NORTH ANNA 3 8 4 07-26-74 PHIPPS BEND 1 10-18-77 PHIPPS BEND 2 10-18-77 RIVER BEND 1 09-05-75 RIVER BEND 2 09-05-75 ST. LUCIE 2 03-17-75 STERLING 1 09-01-77 SAN ONOFRE 2 8 3 10-18-73 YELLOW CREEK 2 02-09-78 SEABROOK 1 4 2 07-07-76 SEQUOYAH 2 05-27-70 TOTAL - 22 UNITS SHOREHAM 04-14-73 SOUTH TEXAS 1 82 08-12-75 2-11
?-
. =..
=
=.
...g
...,. p
~.
g o
.., g g
_.l s
.,D
~
e t
_. = "
v
.. MM s
l t
r
.s A
er S
o T
I
,l N
=
n.
U
.r..
..MN w
R E
W 0..
OP RA E
L C
U N
i e
, m.
p
,.=.- _
i_
L A
=.
C 0
=
I s
y 8
a R.9 t
s E1 E
L
=
A H
I M._R T
C N
E M.A t
=-. -
..~
~
9 O M
. ~ ~
P 5
C
~
f
. ~=.
5'
,-_ ~ =.
m a..
a T
=
F C
_-_ ~...
A O
_._ v.
, w. :
~
l S
T
=
.. =.
~
H G
...=
IL H
G
- n.
I H
g.
Y L
e Y
N e.
O L
H a
O HT N
T M
N E
O
=
N 3
0 M
=
O T
0 C
A a
S F
~.
T
~
R N
t C.
S e
E t
r
=-
u 4
=-
0
=
. ~
r E
R P
S a.
o A
P n
ES E
s R
s t
A C
e
.=....
L t
a T
t s
A as D
m I
er S
.. W e
P H
. 7 1
l
.L
..m T
g 6
p e..
M.aN II, 111,!i
- lll, Irt
I,.
l-H J
r i
4 If i
gi m
i I
I
\\. 1 11
\\
El '
/
gi g l!.
s i'!
w !I
- 5 U
l 11 t
is H
8
! I\\!
!!U E
Ill!
= lI I
r i.
J 3
i
!}'t
\\
E
[
/
w i
in:
p.......!
c Q
E s
- EE:
Es s
e s
s a
a n
w e
4
==d E
9; c
a a
gl-l D
!g.
Z g 3' 1 I J
4 1111 G
g ]-
IIII E.I et i
wi g,
l
~
El.l 21 5 '
E i-c lIE r.
O l
3 li u.
s i'
//
i EI
\\
i.
M 4~
/
l.
W s
z ga a
e a
e a
a e
CD c
U Z
E_
.~'
!1i.iiii. 3 i i i, l
J Z
i sZ Q l I
c 5
)8[illii!!!!si!!!;-ij n :n; e
i E
g l
ii-'
i!!!
j j
i 3
f; l
i i
} I!i li ii!!ji!!!i III 3
I!!
littliillI!!!!Il I
2 13 L
SECTION lli -
NUCLEAR MATERIALS
)
1 DATA AS OF 8 05-09-80 HMSS APPLICATIONS FORECAST FY 1980/81 BUDGET CURRENT ESTIMATE ESTIMATE FAC.
APPL.
SUBMITTAL SUBMITTAL APPt.ICANT LOCATION TYPE TYPE DATE DATE PR' T MANAGER ($)
AHACONDA COPPER CO.
MCMULLEH CO.,
TX UM HA N/S 02-12-80C G. WU CONOCO UM HA FY80 FY80 PATHFINDER MINES UM NA FY80 FY80 KERR-MCGEE (SPRB)
UM HA FY80 FY80 UNITED NUCLEAR UM AM FY80 FY80 ATLAS MINERAL CORP.
UM AM FY80 FY80 FED. - AMER. PARTHERS UM AM FY80 FY80 PLATEAU RESOURCES UM AM FY80 FY80 RID ALGOM UM AM FY80 FY80 UNION CARBIDE. RMEC UM HA FY81 FY81 AMERICAN HUCLEAR CORP.
UM HA FY81 FY81 CLEVELAND CLIFFS UM HA FY81 FY81 STANDARD METALS UN HA FY81 FY81 RMEC UM HA FY81 FY81 ENERGY FUELS NUCLEAR UM AM FY81 FY81 UNION CARBIDE UM AM FY81 FY81 PETROTOMICS UM RH FY81 FY81 COTTER CORP.
UDP HA FY80 FY80 KERR-MCGEE CCRP.
UDP NA FY80 FY80 ADOBE OIL 8 GAS UDP HA FY81 FY81 RMEC (R 8 D HL)
UDP HA FY81 FY81 MINERALS EXPLORATIDH UDP HA FY81 FY81 1
ROCKY MTH. ENERGY NATRONA, WY ISL RH H/S 01-28-80C J. ROTHFLEISCH MINERALS EXPLORATION SWEETWATER, WY TSL RM N/S 01-16-80C G.
EADIE CLEVELAND CLIFFS CAMPBELL CO., WY
.T S L AM N/S 10-26-79C G. EADIE TETON EXPLORATIDH ISL HA FY80 FY80 EXXOH ISL HA FY81 FY81 HUCLEAR DYNAMICS JSL HA FY81 FY81 RMEC (RENO)
LSL HA FY81 FY81 MINERALS EXPLORATION ISL NA FY81 FY81 f.YOMING MINERALS ISL AM FY81 FY81 J: = -
2:.M
.74: ll=:!"
=:C.'::7.".
't l:::2==&
"J".
^
32 CONTINUED ON NEXT PAGE
I i
DATA AS OF :
05-09-80 HMSS APPLICATIONS FORECAST FY 1980/81 BUDGET CURRENT ESTIMATE ESTIMATE FAC.
APPL.
SUBMITTAL SUBMITTAL APPLICANT LOCATIDH TYPE TYPE DATE DATE PROJECT MANAGER (S)
AMERICAN NUCLEAR CORP.
OSR HA FY80 FY60 AMOCO MINERALS OSR NA FY80 FY80 RMEC (HML)
OSR AM FY80 FY80 RMEC (RENO)
OSR AM FY80 FY80 MINERALS EXPLORATION OSR RN FY80 FY80 RMEC (NML)
OSR RN FY80 FY80 AMERICAN NUCLEAR CORP.
OSR NA FY81 FY81 J
NUCLEAR DYNAMICS OSR NA FY81 FY81 TETON EXPLORATION OSR NA FY81 FY81 URANIUM RESOURCES OSR NA FY81 FY81 WYOMING MINsRAL OSR HA
'Y81 FY81 COTTER CORP.
OSR RH F '81 FY81 EXXON OSR RN FYs '
FY81 WESTINGHOUSE PRATTVILLE, AL UFF NA FY80 12-20-79C STEVENSON/SHUM GENERAL ELECTRIC WILMINGTON, NC UFF AM FY80 01-02-80C STEVENSON/SHUM GENERAL ELECTRIC WILMINGTON, NC UFF AM N/S 01-08-80C STEVENSON/SHUM COMBUSTION ENGINEERING WINDSOR, CT UFF AM FY80 FY80 TEXAS INSTRUMENTS UFF AM FY80 FY80 UNITED HUCLEAR WOOD RIVER JCT, RI UFF AM FY80 FY80 UNITED NUCLEAR WOOD RIVER JCT, RI UFF AM FY80 FY80 UNITED NUCLEAR
. WOOD RIVER JCT, RI UFF AM FY80 FY80 UNIDENTIFIED 82 UFF AM FY80 FY80 BAPCOCK 8 WILCOX LYNCNBURG, VA UFF AM FY80 FY80 WESTINGNOUSE WALTZ MILL, PA UFF RN FY80 FY80 COMBUSTION ENGINEERING WINDSOR CT
-UFF AM FY81 FY81 UNITED NUCLEAR CORP.
UNCASVli!E, CT UFF AM FY81 FY81 UNIDENTIFIED 83 UFF AM FY81 FY81 UNIDENTIFIED 84 UFF AM FY81 FY81 UNIDENTIFIED 85 UFF AM FY81 FY81 UNIDENTIFIED 86 UFF AM FY81 FY81 UNIDENTIFIED 87 UFF AM FY81 FY81 EMERGENCY PLANNING 81 UFF AM FY81 FY81 EMERGENCY PLANNING 82 UFF AM FY81 FY81 i
EMERGENCY PLANNING 83 UFF AM FY81 FY81 i
'**"^
~
a::u, olll:.~- -
g:*-'"'C w
7
$N$$$.*.*a"'?'.
CONTINUED ON NEXT PAGE "J.'v 33
DATA AS OF : 05-09-80 NMSS APPLICATIONS FORECAST FY 1980/81 BUDGET CURRENT ESTIMATE ESTIMATE FAC.
APPL.
SUBMITTAL SUBMITTAL APPLICANT LOCATION TYPE TYPE DATE DATE PROJECT MANAGER (S)
EMERGENCY PLANNING 84 UFF AM FY81 FY81
. EMERGENCY PLANNING ES UFF AM FY81 FY81 EMERGENCY PLANNING 86 UFF AM FY81 FY81 EMERGENCY PLANNING 87 UFF AM FY81 FY81 EMERGENCY PLANNING 88 UFF AM FY81 FY81 CLEAN AIR ACT Of UFF AM FY81 FY81 CLEAN AIR ACT 82 UFF AM FY81 FY81 CLEAN AIR ACT 83 UFF AM FY81 FY81 CLEAN AIR ACT 84 UFF AM FY81 FY81 WESTINGHOUSE COLUMBIA, S.C.
UFF AM FY81 FY81 EXXON NUCLEAR CORP.
UFF AM FY81 FY81 UNITED HUCLEAR WOOD RIVER JCT. RI UFF RN FY81 FY81 BABCOCK 8 WILCOX LYNCHBURG, VA UFF RN FY81 FY81 COMBUSTION ENGINEERING WINDSOR, CT UFF RN FY81 FY81 GENERAL ATOMIC UFF RN FY81 FY81 GENERAL ELECTRIC WILMINGTON, NC UFF RH FY81 FY81 KERR-MCGEE PURD AM FY80 FY80 B/.TTELLE MEM. LABS.
COLUMBUS, OH PURD AM FY81 FY81 EXXON NUCLEAR CORP.
RICHLAND, WA PURD AM FY81 FY81 KERR-MCGEE SEQUOYAN, OK UF6 AM FY80 FY80 KERR-MCGEE UF6 AM FY81 FY81 KERR-MCGEE UF6 AM FY81 FY81 ALLIED CHEM-NUCLEAR SYSTEMS BARNWELL,SC WASTE RH N/S 12-29-79C K. DRAGONETTE CHEM-NUCLEAR SYSTEMS BARNWELL,5C WASTE NA N/S 03-12-80C K. DRAG 0HETTE SAVANNAH RIVER WASTE HA FY81 FY81 DOE ISFSI (A)
SFS HA FY81 FY81 l
SFS NA FY81 FY81 DETROIT EDISON NEWPORT, MI RFS NA N/S 03-04-80C J. DELANEY l
a :1-- -
l J:=~
i 2:.~" -
4::::::::.:r.;m.
C:CL L
34 "t= ::= = :::' m
'"J.'o
1 1
1 IN-D04SE MAJOR CASE RGHEWSCHEDOUNG usarto emogruty DATA AS OF: MAY 9,1980
--.................---=
FACILITY APPL APPL
__'IRRENT CASE C
APPLICANT LOCATION TYPE TYPE REC'D CDP.PLETIDH DATE URAHIUM MILLING HEW APPL GULF MINERAL RES. CO.
MCKIHLEY CD, NM U-MILL HA 09-78 05-07-80 PIDHEER ORAV4M, INC.
SAN MIGUEL CO., CO U MILL MA 06-79 06-30-80 KERR-McGEE C0Y.
CONVERSE CO., WY U-MILL HA 08-77 H/S CYPRUS MINES CORP.
FREMONT CO., CO U-MILL HA 08-79 06-27-60 ANACONDA 00PPER CD.
MCMULLEN CO., TX U-MILL HA 02-80 N/S HOMESTAKE MIN 910 CO.
SAM JUAN CO., WY U-MILL HA 02-80 N/S REMEWALS 8 MAJOR i10D FEDERAL-AMER. PTHRS.
RIVERTON, WY.
U-MILL RH 03-78 H/S EXXOH MINERALS COHVERSE CO., WY U-MILL RN 07-78 N/S UNION CARBIDE GAS HILLS, WY U-MILL RN 03-76 07-12-80 WESTERN HUCLEAR JEFFREY CITY, WY U-MILL RH 04-73 06-09-80 UNION CARBIDE MONTROSE CO., CO U-MILL RH 02-79 H/S PINAL MIMERALS 8 MINING, LTD.
GILA CO., AZ U-MILL RH 09-79 H/S DAWM MINING CO.
FORD, WA.
U-MILL RH 09-79 12-01-80 i
AMENDMENTS BEAR CREEK UP.aHIUM CONVERSE CO., WY U-MILL AM 09-78 10-24-80 TEHMESSEE *, ALLEY AUTH.
EDGEMONT, SD U-MILL AM 01-79 H/S COTTER c'sRP FREMONT CO., CO U-MILL AM 01-79 05-30-80
____._~_..__..____---__
... - - - = = - = _ - - - - -.
-_.==_---==....
FUEL STORAGE NEW APPL LONG ISLAND LIGHTING CD SUFFOLK COUNTY, NY FUEL STORAGE HA 09-78 ff/S SOUTH CAL. EDISON 8 SAN DIEGO GAS 8 ELEC ROSEMEND, CA FUEL STORAGE HA 07-74 N/S DETROIT EDISDH HEWPORT, MI FUEL STORAGE HA 03-80 12-15-80
-_.--__-____=-
- - _ = =
_ _ _ _. - - - _==_.
AMENDMENTS DUKE POWER COMPANY MECKLENBERG CO., NC STORAGE AM 03-78 N/S GENERAL ELECTRIC MORRIS, IL CAP. INCREASE AN 05-77 N/S REHEWALS GENERAL ELECTRIC MORRIS, IL OPERATICH RH 02-79 N/S
_ _=_=
- - - - = - -
KEY NA = New Application RN = Renewal AM = Amendment NC = Non-case EIS = Environmental Impact Statement (CONTINUED ON NEXT PAGE) 3-5
IH-HOUSE MAJOR CASE REVIEW SCHEDULING UPDATED BIMONTHLY
--==-----....-----.--
....................... _............. - _ = _ _ _............ - _........ - = = _
FACILITY APPL APPL CURRENT CASE APPLICANT LOCATIDH TYPE TYPE REC'D COMPLETION DATE IH-SITU MINING HEW APPL ROCKY MTH. EHERGY HATRONA, WY IH-SITU HA 02-79 M/S PLATEAU RESOURCES LTD GARFIELD CO.,
R8D HA 08-78 07-31-80 OGLE PETROLEUM, INC.
FREMONT CO., CD IN-SITU NA 08-79 N/S REHiWALS WYCMING MIMERALS JOHMSON CO., WY IH-SITU RH 06-79 H/S ROCA? N'd ENERGY HATRONA, WY IH-SITU RN 01-80 07-0?-80 AMENDMENTS WYOMING MINERALS JOHMSON CO., WY IH-SITU AM 09-79 H/S URANIUM FUEL FAB NEW APPL WESTINGHOUSE PRATTVILLE, AL UFFP HA 12-79 H/S REMEWALS 8 MAJOR MOD BABCOCK 8 WILCOX LYMCHBURG RES. CENTER LYNCHBURG, VA UFFP RN 12-78 08-01-d0 EXXOH HUCLEAR CO.
RICHLAND, WA UFFP RH 06-79 07-32-80 B ATTELLE MORTHWEST L ABS RICHLAND, WA UFFP RN 06-79 06-25-80 TEXAS INSTRUMENTS, IHC ATTLEBORD, MA UFFP RN 02-79 01-09-8f AMENDMENTS UNITED HUCLEAR Uf;CASVILLE, CT UFFP AM 04-78 07-28-80 COMBUSTION ENGINEERING HEMATITE, MO UFFF AM 04-78 N/5 GENERAL ATOMIC CD.
SAN DIEGO, CA UFFP AM 11-78 07-17-80 GENERAL ELECTRIC WILhlHGTON, NC UFFP AM 01-80 10-10-80 GENERAL ELECTRIC WILMINGTON, NC UFFP AM 01-80 04-13-81 KERR-MCGEE WEST CHICAGO. IL UFFP EIS 08 79 N/S
....__-__-_==.....
2-......
PLUTONIUM FUEL FAB REHEWALS 8 MAJOR MOD BATTELLE COLUMBUS L AB.
COLUMBUS, OH FFP RH 01-74 H/S GENERAL ELECTRIC VALLECITOS, CA R8D RN 08-7f H/S WESTINGHOUSE CHESWICK, PA PFDL RH 12-74 05-16-80 AMENDMENTS GENERAL ELECTRIC VALLECITOS, CA PU R8D AM N/S I
EXXOH HUCLEAR RICHLAND, WA PU R8D AM 05-f6-80 l
ATOMICS INT'S.
CANOGA PARK, CA PU R8D AM 06-13-80 BATTELLE MEM. INST.
COLUMBUS, OH PU R&D AM 08-22-80
.--.-- ___=.___...
=.
- =_
NON-CASE 8 OTHER i
l M/A HC 09-25-80 l
GEIS OH URANIUM MILLING N/A N/A HC 08-75 08-00-80 HUCLEAR FUEL SERVICES WEST VALLEY, NY
=__-.._=___................- =._.
KEY l
NA = Hew Application l
RN = Renewal l
AM = Amendment l
NC = Non-Case l
EIS = Environmental Impact Statement 36 CONTINUED ON NEXT PAGE l
IN-HOUSE MAJOR CASE REVIEW SCHEDULING UPDATED BIMONTHLY
=___
___ _ _____=___________
___.=
FACILITY APPL APPL CURRENT CASE APPLICANT LOCATION TYPE TYPE REC __'D COMPLETION DATE
________.__==.---.
==__
TRANSPORTATION DOE, S-6213 WASHINGTON, DC NA 07-78 N/S DOE 5 2 W/ 5 2 W A WASHINGTON, DC NA 04-76 N/S DOE, AHL-402-SPM CHICAGO, IL NA 12-77 N/S DOE, ORML LOOP OAK RIDGE IN NA 07-78 05-31-80 DOE, AML-390-SPM CHICAGO, IL NA 12-77 N/S NUCLEAR ASSURANCE CORP. MAC-3K SPENT FUEL CASK ATLANTA, GA NA 12-78 N/S
= - - - - _ _ - - = = = _ =...........
.=__-_
_ ___=
= - - - - _ - = - -
LOW LEVEL WASTE NUCLEAR ENGINEERING SM:FFIELD, IL WASTE BURIAL RN/AM 88-68 N/S SOUTHWEST NUCLEAR, *hC.
LYONS, KS WASTE BURIAL MA 09-78 N/S CHEM-MUCLEAR SYS!fMS BARNWELL, SC WASTE BURIAL RH 12-79 N/S CHEM-MUCLEAR SYSTEMS BARHWELL, SC WASTE BURIAL NA 03-80 N/S I
SUMMARY
OF IN-HOUSE MAJOR CASES U-MILLS New Applications................. 6 NA = New Application Renewals.........................
7 RN = Renewal Amendments....................... 3 AM
- Amendment FUEL STORAGE NC = Non-Case New Applications................. 3 EIS = Environmental Impact Statement Renewals..........................l Amendments.......................
2 IN-SITU New Applications................. 3 Renewals........................ 2 Amendments.......................'.1 URANIUM FUEL FAB New Applications................. 1 Renewals.........................
4 Amendments.......................
5 Generic EIS......................
1 PLUT0NIUM FUEL FAB Renewals........................i.3 Amendments....................... 4 N0N-CASE............................. 2 TRANSPORTATION....................... 3 LOW LEVEL WASTE...................... 4 SAFEGUARDS...........................
3 T0TAL...............................
61 3-7
~
NMSS MAJOR CASEWORK MAJOR CASEWORK: COMPLETIONS DATA ASOF: MAY 9,1980
- . une.o *** ares e
=m v FY 80-(Includes Generic Reviews)-*
UPDATED BIMONTHLY
~ ~ ~ ~
LEGEND:
c
- , Nj.* *' '
..-n so 1041 79 FORECAST
- rs ACTUAL COMPLETIONS
- 70
,,j 3
4 a.
. a-.
=:
== am cave e
e s
e e
a e
'I e
- ao
,e
- V
..s
=
e e
o e
ee to a
e' OCT NOV DEC JAN FEB MAR APR IMAY JUN JUL AUG SEP cvuutative suport roarcast av mos.rie o
NEW APPLICATIONS l
}
Ms evvata.
3 e
gason escoericanoess AMENDMENTS 4
l 1
p DESCRIPTION:
D^n scontation aavirws 2
]
THIS CHA RT SHOWS THE GENERIC & OTHER l
]
l
]
NUVbER OF MAJOR CASE, U
u="v" =
3 8
10 11 12 13 16 fST ATED COM.
PLETED BY MONTH AND ACTUAL COMPLETIONS BY MONTH AND TYPE OF REQUEST.
MMAJOR FUEL CYCLE CASES COMPLETEDW FY 80 FACILITY LICENSE APPLICANT LOCATIDH TYPE COMPLETED TYPE HL INDUSTRIES WILMINGTON, DE TRANS.
10-12-79 HL GENERAL ATOMICS SAH DIEGO, CA TRANS.
10-1S-79 HL MARTIN-TROST ASSOC.
KERH CO., CA U-MILL 10-16-79 NC i
GATES 8 FOX CORP.
NATURITA, CO U-MILL 11-0S-79 HC r
WESTINGHOUSE CHESWICK, PA PUFFP 11-06-79 AL COMBUSTION ENGINEERING WINDSOR, CT UFFP 11-09-79 AL COMBUSTION ENGINEERING HEMATITE, MO UFFP 11-09-79 AL ATLAS MINERALS MOAB. UT U-MILL 11-23-79 AL NUCLEAR ENGINEERING CO.
HANFORD, WA LLW 12-04-79 RN UNITED HUCLEAR CORP.
WOOD R. JCT, RI UFFP 12-10-79 AL TETON EX?LORATION CONVERSE CO., WY SOL 01-08-80 NL 80KUM RESOURCES SANDOVAL CO., NM U-MILL 02-04-80 NC HUCLEAR PACKAGING, INC.
TACOMA, WA TRANS.
03-20-80 NL UNITED NUCLEAR UNCASVILLE, CT UFFP 04-07-80 AL KERR-MCGEE CORP.
COHVERSE Co., WY SQL 04-08-80 NL PHIiLIPS URANIUM CORP.
MCKIHLEY CO., NM U-MILL 0S-09-80 TA KEY:
NL : HEW LICENSE RL : RENEWAL LICENSE AL = AMENDED LICENSE NC NON CASE (NO LICENSE ISSUED)
,T L : TERMINATED LICENSE 34
I r
NMSS MINGR CASEWORK MINDR CASEWORK: COMPLETIONS
- o. a.. o.
- ~.... _ _ _
e Eno:
~
KTUAL COuMif 0=5
~
-m
=
_,,o
_,..ao
' CL.,
79 33 83 M
se 137 194 I
~
~ ' 2' 7_^;;,, ' "--
m
=
e.
im
/
-.o
- *o pt$CRIPTION E
8 C 44=
ese asas hen uav Jun Jut aua ser s emant swows twe muussa minon casswoan courts.
twea ts o s isnuario to es cow.
Icus icuuuur="
DATA UN AVAILABLE io ev mo=rn ano actual Pd HO SAMbuA os nanoas w~n
[
l l
NOTE: Da a unavailable due to conversion of NMSS Internal Mts.
19
NMSS-MATERIALS LICENSING DATA
_Q M RYOFIIRM1 MATE RIALS LtCENfJNG NETVORK AMENDME NT - Mesor addelsen et change to emetsne beenee n wo'O DEFICIENCY L ETTE R - Lerior sent to.. ^*
dece. sing shes encarnestaan esquared es procese essenes
/
e e.
e.
- a. -
DENI AL - Lamenes opedicasson densed-NEW APPLICATION Instellumnoing opsdication.
eCAfeose j % Lacesesseee Mosecas twe 0 On
~ \\/
RENEWAL. steeutwnessen eteer free years to reevelusta O
-e.'"
"d[,P ::= gar,y
'.'ei',e, seed e ",'o "re'e.",,""Je e.
..a.ng i es e.
e
=r
,,ng ENDOF MONTHINVENTORY Data as of:MAY 9,1980 (PENDING DEFICIEHCY LETTERS NOT IHCLUDED)
<-------------------------------FY-1980-------------------------------->
OCT HOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
> 90 DAYS 268 262 293 297 293 279 220 60 TO 89 DAYS 113 96 110 108 73 80 63 30 TO 59 DAYS 156 171 181 142 120 til 138
< 30 DAYS 485 530 554 509 473 587 527 1138 959 1057 941
____l1056 TOTAL 1022 1083 APPUCATl0fl3 > 90 DAYS
<------ ------------------------FY-1980-------------------------------->
i OCT HOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP NEW APPLICATIONS 7
5 8
to 4
1 3
i i
AMENDMENTS 21 18 29 22 21 14 7
l RENEWALS 240 263 256 265 268 264 210 TOTAL 268 286 293 297 293 279 220 3 10
NMSS-MATERIALS LICENSING DATA APPLICATIONS RECEIVED Data as of: MAY 9.1980
<-------------------------------FY-1980-------------------------------->
p l
FY-80 OCT NOV DEC i JAN I FEB MAR APR MAY JUN JUL AUG SEP TOTAL NEW APPLICATIONS 83 65 72 68 63 76 74 501 AMENDMENTS 328 303 301 330 315 330 320 2227 RENEWALS 82 68 75 83 50 82 53 493 RESPONSES TO DEFICIENCY REQUESTS 160 143 120 138 171 138 156 1026 TOTAL 563 579 568 619 599 626 603 4247 LICENSING ACTIONS COMPLETED (APPLICATIONS LICENSED)
<-------------------------------FY-1980-------------------------------->
l FY-80 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP TOTAL
)
NEW APPLICATIONS 47 50 41 62 73 57 92 422 AMENDMENTS 228 197 186 269 275 228 296 1679 RENEWALS 70 51 69 86 75 65 89 505 TOTAL 345 298 296 417 423 350 477 2606 j
DEFICIENCY REQUESTS 214 199 178 238 230 198 216 1473 VOIDS 40 47 40 47 44 44 43 305 MONTHLY
SUMMARY
<-------------------------------FY-1980-------------------------------->
FY-80 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP TOTAL BEGINNING OF M
M MONTH INVENTORY 967 1022 1083 1138 1056 995 1074 7335 INPUT 654 605 569 620 600 655 603 4306 OUTPUT 599 544 514 702 697 592 736 4384 END OF THE a
MONTH INVENTORY 1022 1083 1138 1056 959 1058 941 7257 u BEGINNING AND END OF MONTH INVENTORIES DO NOT CORRELATE. HMSS ATTRIBUTES THIS TO A CHANGE IN THE CCMPUTER REPORTING SeSTEM.
3L11
NMSS MATERIALS LICENSING DATA DESCRIPTION:
T:TAliNNO"$ETiuE TOTAL TURN AROUND TIME FROM RECEIPT OF AU-Data as of: MAY 9' 1980 LICATION TO COMPLETION OF LICENSINO ACTION DOES
",o'E'" a " R "O?O^"!.
<------------------------ ------rY-i980-------------------------------->
FICIENCY LETTERS, OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
> 90 DAYS 117 84 103 148 168 103 170 60 TO 89 DAYS 41 35 41 45 45 44 99 30 TO 59 DAYS 66 88 63 101 79 87 55
< 30 DAYS 121 91 89 123 131 116 153 TOTAL COMPLETED 345 298 296 417 423 350 477 COMPOSITE AVERAGE TIME (IN DAYS) 95 77 98 103 104 84 94 NEW APPLICATIONS TURN AROUND TIME
<-------------------------------rY-i,80-------------------------------->
l OCT NOV DEC JAN REB MAR APR MAY JUN JUL AUG SEP
> 90 DAYS 22 14 12 24 23 14 33 60 TO 89 DAYS 6
6 6
6 11 8
15 30 TO 59 DAYS 8
18 11 13 20 15 21
< 30 DAYS 11 12 12 19 19 20 23 TOTAL
'7 50 41 62 73 57 92 AVERAGE TURNAROUND TIME 97 67 67 83 78 58 99 (IN DAYS)
AMENDMENTS TURN AROUND TIME
<-------------------------------rY-i980-------------------------------->
OCT NOV DEC JAN REB MAR APR MAY JUN JUL AUG SEP
> 90 DAYS 50 36 48 64 95 52 61
=
60 TO 89 DAYS 27 24 30 32 23 25 34 30 TO 59 DAYS 45 63 45 76 50 61 66
< 30 DAYS 106 77 63 97 107 90 135 i
TOTAL 228 197 186 269 275 228 296 AVERAGE TURNAROUND TIME 73 59 79 72 83 62 65 (IN DAYS) l 3-1z
NMSS-MATERIALS LICENSING DATA TURH AROUHD TIME REHEWALS Data a$ Of: MAY 9,1980 DE SCRIPflON 9tf C T OF A
$ $ s E' EII<INrEis E=IsYs$u'oEIfo^oE fICitNCY LE1TEMS.
<-------------------------------FY-1980---------------
OCT HOV DEC JAH FEB MAR APR MAY JUN JUL AUG SEP
> 90 DAYS 45 34 43 60 50 37 59 60 TO 89 DAYS 8
5 5
7 11 11 6
30 TO 59 DAYS 13 10 7
12 9
11 12 l
l
< 30 DAYS 4
2 14 7
5 6
12 TOTAL 70 51 69 86 75 65 89 AVERAGE TURNAROUND TIME 164 159 169 211 203 181 181 (IN DAYS) 3-13
-_,J
,,m-a 33-
-.A.
---_-Ae-
=.d l
l l
SECTION IV -
STANDARDS AND REGULATIONS
PROGRAM OVERVIEW TASK WORKLOAD STATUS JANUARY 1,
1980 TO MARCH 31, 1980 NEW TOTAL TASKS TOTAL ACTIVE TASKS ADDED TASKS ACTIVE TASKS TASKS APPEARING OR TASKS COMPLETED APPEARING IN SCHEDULED IN LAST OUT OR TASKS TASKS THIS MONTH'S TO BE GREEN BOOK OF HOLD INTO HOLD DELETED GREEN BOOK COMPLETED ENGIHEERING MEIHODOLOGY STANDARDS 4
9 0
0 4
0 ENVIRONMEHTAL STANDARDS 5
0 1
0 4
1 FUEL PROCESS SYSTEM STANDARDS 9
4 0
0 13 0
NAIERIALS PROTECTION STANDARDS 5
0 1
0 4
1 OCCUPATIONAL HEALTH STANDARDS 22 0
0 0
22 0
PROGRAM SUPPORT 0
0 0
0 0
0 REACTOR SYSTEMS STANDARD 12 5
1 0
16 0
$1TE DESIGN STANDARDS 5
0 0
0 5
1 SAFEGUARDS 4
0 0
0 4
2 SITE SAFETY STANDARDS 6
1 0
0 9
0 STRUCIURES & COMPONEHi$
STANDARDS 17 0
2 0
15 0
TRANSPORTATION 4 PRODUCT STANDARDS 19 0
2 0
17 3
RADIOLOGICAL HEALTH 3
1 0
0 3
0
<<< TOTALS >>>
113 ft 7
0 116 8
116 TOTAL HO. OF ACTIVE TASKS IN CURRENT EDITION OF GREEH BOOK NOTE: THIS BOARD IS UPDATED QUARTERLY 42
e EEE OCTOBER-DRAFT ACTIVE GUIDE GUIDE RG 1.137/RS 070-4
" FUEL-0IL SYSTEMS FOR STANDBY DIESEL GENERATORS" X
REV. 1 RG 8.21 /0H 707-4
" HEALTH PHYSICS SURVEYS FOR BYPRODUCT MATERIAL X
REV. 1 AT NRC-LICENSED PROCESSING 8 MANUFACTURING PLANTS" RG 8.24 /0H 709-4
" HEALTH PHYSTCS SURVEYS DURING EHRICHED URANIUM --
X l
REV. 1 235 PROCESSING AND FUEL FABRICATION" l
RG 1.143/FP 615-4
" DESIGN GUIDANCE FOR RADI0 ACTIVE WASTE MANAGE.1ENT X
REV. 1 SYSTEMS, STRUCTURES, AND COMP 0HENTS INSTALLED IN LIGHT-WATER-COOLED NUCLEAR POWER PLANTS" DRAFT SG 901-4
" REPORTING OF SAFEGUARDS EVENTS" X
RG 1.140/FP 601-4 "DESTGN, TESTING d MAINTENANCE CRITERIA FOR EXHAUST X
FILTRATION 4 AD30RPTION UNITS" HOVEMBER DRAFT OH 905-4 CALIBRATION OF AIR SAMPLING INSTRUMENIS FOR TOTAL X
V?LUME OF ?.IR SAMPLED DRAFT SC 814-5 PROPOSED REVISION 2 TO REGULATORY GAIDE 1.136. " MATERIALS, X
CONS 1RUCTION, AND TEST!HG OF CONCREiE CONTAIHMENTS ( ARTICf.ES CC-1000, -2000, ANO -4000 THROUGH -7000 0F IHE ' CODE FOR CCNCRETE REACTOR VESSELS AND CONTAIHMENTS')"
DECEMLER l
RG 1.97, RS 917-4
" INSTRUMENTATION FOR LIGHT-Wr.TER-COOLED NUCLEAR X
l REV. 2 (PROPOSED)
POWER PLANTS TO ASSESS PLAH1 AND EHVIRONS CONDITIOMS DURING AND FOLLOWIN3 #H ACCIDENT" RC 1.9.
RS 710-5
" SELECTION, DESIGN, AND QUALIFICATION OF DIESEL-X REV. 2 GENERATOR UNITS LSED AS STANDBY (ONSITE) ELECTRIC PJWER SYSTEMS AT NUCLEAR POW 6R Pl. ANTS" JANUARY 5.59/MP-711-4
" STANDARD FORMAT AND CONTENT FOR A LICENSEE PHYSICAL X
SECURITY PLAN FOR THE PROTECTION OF ShM OF MODERATE OR LOW STRATEGIC SIGNIFICANCE" TP 914-4
" MEASUREMENT 08 RADIATION LEVELS OH SURFACES OF X
PACKAGES OF RAv10 ACTIVE MATERIALS" FP 925-5
" NUCLEAR CRITICALITY SAFETY FOR PIPE INTERSECTIONS X
CONTAINING AQUEOUS SOLUTIONS OF ENRICHED URANYL HITRATE" FEBRUARY RG 7.9/
TP 502-4
"$TANDARD FORMAT AND CONTENT OF PART 71 APPLICATIONS X
REV. 1 FOR APPROVAL OF PACKAGING OF TYPE B, LARGE QUANTITY, AND FISSILE RADI0 ACTIVE MATERIAL" RG 5.58/ MP 801-4
" CONSIDERATIONS FOR ESTABLISNING TRACEABILITY OF SHM X
REV. t ACCOUNTING MEASUREMENTS" CONTINUED ON NEXT PAGE 4-3
REGULATORY GUIDES l
DRAFT ACTIVE MARCH-GUIDE GUIDE RG 8.14/ OH 94 0-4 PROPOSED REV. 2. "PERSOHNEL HEUTRON DOSIMETERS" X
APRIL RG 10.9/ OH 706-4 "CUIDE FOR PREPARATION OF APPLICATI0HS FOR X
LICENSEES FOR THE USE OF GAMMA IRRADIATORS" RG 5.60/ SG 904-4
" STANDARD FORMAT AND CONTEHT OF A LICENSEE X
PHYSICAL PLAN FOR STRATEGIC SPECIAL NdCLEAR MATERIAL IN TRANSIT" l
l l
l TASKS COMPLETED l
l oct NoV DEC JAN Fig MAR APR MAY JUN JUL AUGl SFP 1
2 0
1 2
Draft Guides issued 1
2~~1 1
2 0
0 Active Guides issued 6
0 I
l l
M l
ANSI STANDARDS PUBUSHED l
l I
OCTOBER ANSI /ASME QUALITY ASSURANCE PROGRAM REQUIREMENTS
)
i HQA-1 FOR NUCLEAR POWER PLANTS 1979 l
ANSI /ASME SUPPLEMENTARY QUALITY ASSURANCE REQUIREMENTS I
N45.2.20 FOR SUBSURFACE INVESTIGATIONS FOR NUCLEAR j
1979 POWER PLANTS l
ANSI /ANS ADMINISTRATIVE CONTROLS FOR RESEARCH REACTORS 15.18 1979 ANSI /ANS GASEOUS RADI0 ACTIVE WASTE PROCESSING SYSTEMS 55.4 FOR LIGHT WATER REACTOR PLANTS 1979 DECEMBER ANSI /AHS EMERGENCY CONTROL CENTERS FOR NUCLEAR POWER PLANTS 3.7.2 1979 ANSI /ANS FACILITIES AND MEDICAL CARE FOR OH-SITE HUCLEAR POWER 3.7.1 PLANT RADIOLOGICAL EMERGENCIES 1979 ANSI /AHS LIGHT WATER NUCLEAR POWER PL ANT FIRE PROTECTION, 59.4 GENERIC REQUIREMENTS FOR 1979 ANSI /ANS RADIOLOGICAL EMERGENCY PREPAREDHESS EXERCISES FOR 3.7.3 HUCLEAR POWER PLANTS 1979 ANSI /ANS LIQUID RADI0 ACTIVE WASTE PROCESSING SYSTEM FOR LIGHT 55.6 WATER REACTOR PLANTS 1979 ANSI /ANS SOLID RADI0 ACTIVE WASTE PROCESSING SYSTEM FOR LIGHT 55.1 WATER COOLED REACTOR PLAHTS 1979 FEBRUARY ANSI /IEEE SIZING LARGE LEAD STORAGE BATTERIES FOR GENERATING 485 STATIDHS AHD SUBSTATIONS, RECOMMENDED PRACTICE FOR.
1979 APRIL ANSI /ANS
" DIRECT AND SCATTERED GAMMA RADIATION FROM LWR NUCLEAR 6.6.1 POWER PLANTS, CALCULATIDH AND MEASUREMENT OF*
1979 ANSI /ANS
" SAFETY RELATED COOLING WATER SYSTEMS IN NUCLEAR 5.1 POWER PLANTS" 1979 TASKS COMPLETED
'loct unvInrei saw l e to luaal apa uavj somI nn iauc sre ANSI hde Poweed l 4 016 l 0 61 l 0 4 2 l
4 4
4-5
NUREG REPORTS
)
OCTOBER CR-0510
" DURESS AL ARMS FOR HUCLEAR FIXED SITE FACILITIES" MP 672-7 CR-1055
" CRITERIA AND TEST METHODS FOR CERTIFYING AIR PURIFYING OH-613-9 RESPIRATORS AGAINST RADI0 IODINE" CR-0956
" COMMENT ARY ON SPENT FUEL STORAGE AT MORRIS OPERATIOH" FP 712-9 HOVEMBER CR-1102 "A SYSTEMATIC ASSESSMENT OF THE SAFEGUARDS REGULATIONS" (3 VOLS.) MP 750-7 CR-0485
" VEHICLE ACCESS & SEARCH TRAINING MANUAL" MP 761-7 CR-0484
" VEHICLE ACCESS & CONTROL PLANNING DOCUMENT" MP 761-7 CR-0509
" EMERGENCY POWER SUPPLIES FOR PHYSICAL SECURITY SYSTEMS" MP 763-7 CR-1057
" CONFIRMATION OF COHVERSION FACTORS RELATING EXPOSURE OH-506-1 AND DOSE EQUIVALENT INDEX PRESENTED IN ANSI N13.11" DECEMBER CP-0008
" STATE WORKSHOPS FOR REVIEW OF THE NUCLEAR REGULATORY FP 921-1 COMMISSION'S DECOMMISSIONING POLICY" CR-0569
" FACILITATION OF DECOMMISSIONING LIGHT WATER REACTORS" FP 917-7 HUREG-0584 "ASSURIHG THE AVAILABILITY OF FUNDS FOR DECOMMISSIONING FP 918 0F HUCLEAR FACILITIES."
HUREG-0590
" THOUGHTS OH REGULATION CHANGES FOR DECOMMISSIDHING" (REV. 1)
" RESIDUAL RADI0 ACTIVITY LIMITS FOR DECOMMISSIONING" ES 813-8 NUREG-0628 "HRC STAFF PRELIMINARY ANALYSIS OF PUBLIC COMMENTS SD 906-1 CH ADVANCE NOTICE OF PROPOSED RULEMAKING OH EMERGENCY PLANNING" 4
JANUARY CR-1235
" EVALUATION AND PERFORMANCE OF OPEN CIRCUIT BREATHING OH-607-9 APPARATUS" CR-1063
" PERFORMANCE TESTING OF PERSONNEL DOSIMETRY SERVICES:
OH-506-1 PROCEDURES MANUAL" CR-1065
" PERFORMANCE TESTING OF PERSONNEL DOSIMETRY SERVICES:
CH-506-1 FINAL REPORT OF A TWO-YEAR PILOT STUDY" CR-1204 "THE DESICH AND CONSTRUCTION OF A D20-MODERATED 252CF OH-506-1 SOURCE FOR CALIBRATING HEUTRON PERSOHNEL DOSIMETERS USED AT HUCLEAR POWER REACTORS" CONTINUED ON NEXT PAGE 4-6
NUREG REPORTS FEBRUARY CR-1214 "THE CONTROLLABLE UNIT APPROACH TO MATERIAL C0HTROL:
MP 685-7 APPLICATIONS TO A HIGH THROUGHPUT MIXED-0XIDE PROCESS" NUREG-0628 "HRC STAFF PRELIMINARY ANALYSIS OF PUBLIC COMMENTS CH ES 906-1 ADVANCE NOTICE OF PROPOSED RULEMAKING ON EMERGENCY FLAHHING" MARCH CR-1039 TOPICAL REPORT, " ESTIMATED RADIATION D05ES FROM TP 604-9 THORIUM AND DAUGHTERS CONTAINED IN THORIATED WELDING ELECTRODES:, 45 FR 15349, 3/10/80 APRIL CR-1304
" PERFORMANCE TESTING OF PERSONNEL DOSIMETRY SERVICES:
OH 506-1 SUPPLEMENTARY REPORT OF A TWO-YEAR PILOT STUDY" CR-1419
" COST-BENEFIT EFFECTS OF CONVERSION TO SI UNITS IN OH 805-9 HEALTH PHYSICS" CR-1142
" REMOTE RESPONSES MECHAHISMS" MP 872-7 CR-1223
" DRY STORAGE OF SPEHT HUCLEAR FUEL" FP 516
}OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP l3 5
- 6 4
2 1
4 No.*- i a 4-7
1 i
OTHER SD PRODUCTS OCTOBER R$ 907-8 STANDARD REVIEW PLAN SECTION 9.2.2, " REACTOR AUXILIARY COOLING WATER SYSTEMS" NOVEMBER ES 811-8 MEMORANDUM OF UNDERSTAHDING WITH SMITHSONIAN SCIENTIFIC INFORMATION EXCHANGE ON SUBMISSION OF RESEARCH INFORMATION JANUARY OH 942-8 HRC/MSHA MEMORANDUM OF UNDERSTANDING, PUBLISHED IN FEDERAL IN FEDERAL REGISTER JANUARY 4, 1980, FR 45-1315 RS 016-1 ADVANCE NOTICE OF PROPOSED RULEMAKING, " NUCLEAR PLANT RELIABILITY DATA SYSTEM REPORTING TO BE MADE MANDATORY" l
ENVIRONMENTAL IMPACT STATEMENTS i
PETITION DENIALS DCTOBER TP 712-3 DENIAL OF PETITIDH FOR RULEMAKING WITH REGARD TO SURFACE PRM 20-9 R AD. ATION LEVEL LIMIT OF PACKAGES PREPARED FOR TRANSPORT 44 FR 22232 PRM 71-7 TP 821-3
"(1) REMOVE APPENDIX E - QUALITY ASSURANCE CRITERIA FOR SHIPPING PACKAGES FOR RADICACTIVE MATERIAL -
FROM 10 CFR PART 71 AND (2) DELAY THE EFFECTIVE DATE OF IMPLEMENTATION OF PART 71, APPENDIX E" DECEMBER TP 808-3 DENI AL OF A PETITION TO DELETE THE 180 DAY RESTRICTION IN 10 CFR 150.20(B)(3) FOR NDH-AGREEMENT STATE USE OF RADI0 ACTIVE MATERIAL 4-8
1 i
AMENDMENTS TO AND NEW NRC REGULATIONS PROPOSED EFFECTIVE i
RULE RULE OCTOBER REPORTING OF SAFEGUARDS EVENTS PROPOSED X
REGULATIONS 44 FR 60743 OH 721-1 AMENDMENT OF 10 CFR PART 34. RADIOGRAPHY SAFETY, PUBLISHED X
IH FEDERAL REGISTER OCT. 2, 1979, 44 FR 50805 NOVEMBER TP916-1 NOTICE PROPOSING TO AMEND SS 32.26(B) (10) AND X
32.29(B) TO PROVIDE NEW REQUIREMENTS FOR LABELING THE EXTERNAL SURFACES OF NOT ONLY GAS AHD AEROSOL DETECTORS INCLUDING SMOKE DETECTORS.'BUT ALSO THE POINT-OF-SALE PACKAGING OF THESE DETECTORS IF PACKAGED INDIVIDUALLY DECEMBER 10 CFR PART50 EMERGENCY PLANHIHG 44 FR 75167 X
REVISION OF PART 71 TO REQUIRE NRC LICENSEES TO MEET DOT X
I REQUIREMENTS. NO TASK NO. ASSIGNED SHOULD BE CREDITED TO DECISION UNIT 2, PLANNED ACCOMPLISHMENT 3.
JANUARY SG 923-1 TRANSIENT SHIPMENTS OF STRATEGIC SHM X
MP 711-1 PHYSICAL PROTECTION OF IN-TRANSIT OF MODERATE X
1 STRATEGIC SIGNIFICANCE PART 21 REFERENCE IN PART 34, PUBLISHED IN FED. REG.
X 1
1/11/80 FR 45-2312 SC 905-1 10CFR50, REV. APPENDIX J, 89eNDMENTS TO TbE REQUIREMENTS X
FOR LEAK TESTING OF CC"!AaNMENT BUILDING AIR LOCKS IN 1
ORDER TO PERMIT GREATER FLEXIBILITY FOR SUCH TESTING IN THE CASE OF FREQUENT USE OF THE AIR LOCKS OH 019-1 AMENDMENT OF 10 CFR PART 34. PART 21 REFERENCE IN PART 34, X
PUBLISHED IN FEDERAL REGISTER JAN. 11, 1980, FR 45-2312 j
FEBRUARY FP 903-2 10 CFR PARTS 40 AND 150, URANIUM MILL TAILINGS LICENSING X
l AMENDMENT TG PART 50, DCMESTIC LICENSING OF PRODUCTION X
AND UTILIZATION FACILITIES MARCH
" CORRECTION OF U.S. POSTAL SERVICE REGULATION REFERENCE" X
45 FR 20462, 3/28/80, to CFR ? ART 71 RS 706-8 "PRTECTION FOR EMPLOYEES WHO PROVIDE INFORMATION TO THE X
HRC", 45 FR 15184, 3/10/80 RS 617-3 "N0 SIGNIFICANT HAZARDS CONSIDERATI0H", 45 FR 20491, X
3/2E/80 RESPONSE TO PETITION FOR RULEMAKING (PRM-50-17),
5/7/76
/
RH 007-1 "T0 AMEND THE GENERAL LICENSE IN SECTION 40.22" PUBLISHED X
ON 3/6 IN THE FR TO DELETE MATERIAL MEDICINALS FROM THE GENERAL LICENSE FOR SMALL QUANTITIES OF SOURCE MATERIAL IN SEC. 40.22.
SG 930-1
" ACCESS CONTROLS TO HUCLEAR POWER PLANT VITAL AREAS",
X 45 FR 15937, 3/12/80 MP 711-1
" EXTENSION OF DATES FOR IMPLEMENTATION OF CATEGORY II X
AHD III MATERIALS REQUIREMENTS", 45 FR 19215, 3/25/80 SG 929-1 " GENERAL LICENSING REQUIREMETHS FOR CARRIERS OF IRRADIATED X
~ '
SNM IN-TRANSIT", 45 FR 15936, 3/12/80 OH 939-1 AMENDMENT OF 10 CFR PART 19. EXIT INTERVIEWS, PUBLISHED X
IN FEDERAL REGISTER MARCH 26, 1980, FR 45-19564 OH 506-1 ADVANCE NOTICE OF RULEMAKING, 10 CFR PART 20, PERFORMANCE X
TESTING FOR PERSOHNEL DOSIMETRY, PUBLISHED IN FEDERAL REGISTER MARCH 28, 1980, FR 45-20493 OCT-NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP er a R*. Pum*=s 1
1 1
4 0
7 Et'sttswe Rules PuWalwd
- 1. - - -
1 2
2 1
4
I t
i l
1
SUMMARY
OF SELECTED STANDARDS STATISTICS j
COMPLETED ACTIONS FY 1979 AND FY 1980 10-01-78 10-01-79 THRU THRU 4
09-30-79 04-30-80 I
(12 MONTHS)
(7 MONTHS) l 39 9
DRAFT GUIDES ISSUED l
ACTIVE GUIDES ISSUED 22 9
ANSI STAHDARDS PUBLISHED 31 13 DRAFT ENV. STATEMENTS PUBLISHED 0
0 FINAL ENV. STATEMENTS PUBLISHED 1
0 11 14 PROPOSED RULES PUBLISHED EFFECTIVE RULES PUBLISHED 17 7
RULEMAKING PETITIONS DENIED 6
2 RULEMAKING PETITIONS APPROVED 0
0 RULEMAKING PETITIONS WITHDRAWN 0
0 HUREG REPORTS ISSUED 37 25 OTHER SD PRODUCTS 4
4 l
l 4 10
l l
I NRC POLICY STATEMENTS AS LISTED IN THE FEDERAL REGISTER DATA AS OF:
APRIL 30,1980 JANUARY 3, 1975 CRITERIA FOR DETERMINING EHFORCEMENT ACTION AND CATEGORIES OF N0HCOMPLIANCE (40 FR 820)
MAY 8, 1975 MIXED OXIDE FUEL; GENERIC ENVIRONMENTAL STATEMENT; TREATMENT OF SAFEGUARDS AND DEFERRALS OF LICENSING ACTIONS (40 FR 20142)
JULY 8, 1976 LICENSES TO EXPORT NUCLEAR MATERIAL AND PETITIONS FOR LEAVE TO INTERVENE IN SUCH PROCEEDINGS (41 FR 28044)
AUGUST 16, 1976 ENVIRONMENTAL EFFECTS OF THE URAHIUM FUEL CYCLE (41 FR 34707)
HOVEMBER 11, 1976 ENVIRONMENTAL CFFECTS OF THE URANIUM FUEL CYCLE (41 FR 49898)
MARCH 3, 1977 TRANSPORTATION OF RADIONUCLIDES IN URLAN ENVIROHS (42 FR 12271)
MARCH 10, 1977 LOW LEVEL WASTE DISPOSAL; TASK FORCE REPORT (42 FR 13366)
MARCH 14, 1977 URAHIUM MILLING; PROPOSED SCOPE AND OUTLIHE FOR GENERIC ENVIRONMENTAL IMPACT STATEMENT (42 FR 13874)
JULY 5, 1977 STANDARDIZATIDH OF HUCLEAR POWER PLANTS (42 FR 34395)
JANUARY 10, 1978 PROGRAM FOR RESOLUTIO's OF GENERIC ISSUES RELATED TO HUCLEAR PrWER PLANTS; REPORT TO CONGRESS (43 FR 1565)
FEBRUARY 1,
1978 CAMERA COVERAGE OF HEARINGS BEFORE ATOMIC SAFETY AND LICENSING BOARDS AND ATOMIC SAFETY AND LICENSING APPEAL BOARDS (43 FR 4294)
JUNE 28, 1978 DOMESTIC LICENSE APPLICATIONS; OPEN MEETINGS AND STATEMENT OF NRC STAFF POLICY (43 FR 28058)
AUGUST 31, 1978 STATEMENT ON STANDARDIZATION OF HUCLEAR POWER PLANTS (43 FR 38954)
OCTOBER 20, 1978 RECOMMENDATIONS FOR IMPROVING NUCLEAR POWERPLANT LICENSING (43 FR 49082) 4 -11
i NRC POUCY STATEMENTS i
NOVEMBER 17, 1978 LICENSING PROCEDURES FOR GEOLOGIC REPOSI-TORIES FOR HIGH-LEVEL RADI0 ACTIVE WASTES (43 FR 53869)
DECEMBER 14, 1978 GENERIC RULEMAKING TO IMPROVE HUCLEAR POWER PLANT LICENSING (43 FR 58377) l FEBRUARY 9, 1979 REGULATION OF THE MEDICAL USES OF RADIO-ISOTOPES; STATEMENT OF GENERAL POLICY (44 FR 8242) l OCTOBER 10, 1979 INTERIM STATEMENT OF POLICY AND PROCEDURE (CONCERNS CONDUCT OF LICENSING PROCEEDINGS PENDING DECISION ON MODIFICATION OF REGblATORY PROCEDURE]
i (44 FR 58559)
OCTOBER 16, 1979 PROPOSED AGENCY POLICY AND PROCEDURES FOR DIFFERING PROFESSIDHAL OPINIONS; REQUEST FOR COMMENTS (44 FR 59686) 4 OCTOBER 23, 1979 PLANNING BASIS FOR EMERGENCY RESPONSES TO NUCLEAR POWER REACTOR ACCIDENTS (44 FR 61123)
NOVEMBER 27, 1979 STATEMENT OF POLICY AND NOTICE OF INTENT TO PREPARE A PROGRAMMATIC EIS (DISPOSAL OF TMI-2 WASTES)
JANUARY 15, 1980 PLANNING BASIS FOR EMERGENCY RESPONSES TO NUCLEAR POWER REACTOR ACCIDENTS (44 FR 2893) l l
l l
4 12
s SECTION V -
RESEARCH PROJECTS l
i l
NUCLEAR REGULATORY RESEARCH DATAASOF: APRIL 22, 1980 N
LOFT (LOSS OF FLUID TEST) gppO PURPOSE:
THE LOFT FACILITY IS A WELL INSTRUMENTED PRESSURIZED WATER REACTOR (PWR)
AT ABOUT 1/60 THE POWER LEVEL AND 1/5 THE PHYSICAL SIZE OF A COMMERICAL PWR.
IT IS LOCATED AT THE IDAHO HATIONAL ENGINEERING LABORATORY AHD IS DESIGHED TO STUDY THE BEHAVIOR OF ENGINEERED SAFETY FEATURES, SUCH AS EMERGENCY CORE COOLING SYSTEMS, DURING POSTULATED REACTOR ACCIDENT CONDITIONS. DATA FROM LOFT EXPERIMENTS ARE BEING USED (A) TO ASSESS AND IMPROVE'TME ANALYTICAL METHODS CURRENTLY USED TO PREDICT THE COURSE OF VARIOUS LQSS OF COOLANT ACCIDENTS AND OFF-HORMAL TRANSIENTS, AND (B) TO STUDY IMPROVEMENTS IH OH-LINE DATA PROCESSING AND DISPLAY FOR THE EHHANCEMENT OF OP8RATOR CAPABILITY.
STATUS:
1.
THE SECOND POWERED SMALL-BREAK TEST, L3-2, SIMULATING A 1" BREAK IN A COMMERICAL PWR, WAS SUCCESSFULLY MUN ON FEBRUARY 6, 1980.
AFTER DEPRESSURIZING TO 900 PSIA, THE ECCS (HPSI) AND THE BREAK FLOWS BECAME EQUAL, AND THE SYSTEM PRESSURE STABILIZED. AFTER ONE HOUR, ACCORDING TO PLAN, OPERATOR INTERVENTION CAUSED A C00LDOWH THROUGH THE SECONDARY SIDE AND DEPRESSURIZATIOH AND WITHIH ABOUT SIX HOURS BROUGHT THE PLANT TO A COLD SHUTDOWN.
AS A RESULT OF AN INVITATION TO REPRESENTATIVES OF THE HUCLEAR INDUSTRY TO ATTEND A SPECIAL BRIEFING IN LOFT AND TO WITHESS THE L3-2 TEST, ABOUT 15 REPRESENTATIVES OF VENDOR COMPANIES. IHP0 AND EPRI PARTICIPATED IN THE%E EVENTS.
2.
A FAULT DIAONOSTICS SYSTEM TO ASSIST OPERATOR INTERPRETATION OF OFF-NORMAL AND ALC' DENT CONDITIONS HAS BEEN INSTALLED IN LOFT.
REACTOR SYSTEM STATUS DIsil.tYS WERE FUNCTIONING DURING THE L3-2 TEST.
3.
THE HEXT FEW TESTS WILL CONSIST OF TEST PAIRS - AN OPERATIONAL TRANSIENT, FOLLOWED WITHIH A WEEK BY A SMALL BREAK LOCA.
THE FIRST SUCH PAIR IS SCHEDULED FOR THE FIRST HALF OF JUNE 1980.
IT WILL CONSIST OF A LOSS OF FEEDWATER (L6-5) FOLLOWED BY A 1-IHCH LOCA, L3-7, DESIGHED TO INVESTIGATE CONDITIDHS OF REFLUX BOILING IN 1HE STEAM GENERATOR, AND BY CLOSING THE BREAK, THE EFFECTS OF REPRESSURIZING THE PRIMARY SYSTEM.
l l
l 5-2
l NUCLEAR REGULATORY RESEARCH DATA AS OF: APRIL 22,1980 ggM SEMISCALE THE SEMISCALE MOD 3 CONFIGURATION IS A ONE-DIMENSIONAL H0H-HUCLEAR REPRESENTATION OF THE THERMAL HYDRAULIC BEHAVIOR OF A PRESSURIZED WATER REACTOR, DESIGNED TO SIMULATE ECCS/ UPPER HEAD INJECTION (UHI)
PERFORMANCE DURING A LOSS-OF-COOLANT EXPERIMENT. IT OPERATES AT ABOUI 1/30 THE POWER LEVEL AND IS 1/5 THE PHYSICAL SIZE OF LOFT WIlH TWO LOOPS, EACH CONTAINING AH ACTIVE STEAM GENERATOR AHD COOLANT PUMP.
THE REACTOR CORE IS SIMULATED BY 25 ELECTRICALLY HEATED FUEL RODS, EACH HAVING A 12-F00T HEATED LENGTH AND ARRANGED IN A TYPICAL IS X 15 PWR FUEL GEOMETRY.
THE OLJECTIVES OF THE TEST FACILITY ARE TO:
1 PROVIDE SEPARATE AND INTEGRAL EFFECTS EXPERIMENTAL DATA FOR DEVELOPING AND/OR ASSESSMENT OF LOCA COMPUTATIONAL
- METHODS, 2.
INVESTIGATE SMALL BREAK LOCA'S AND PLANT TRAHSIENTS, 3.
PROVIDE DATA FOR INTERPRETING LOFT DATA AND ADDRESSING LOFT DESIGN COMPROMISES, AND 4.
F ROVIDE DATA TO INVESTIGATE UHI PHENOMENA AND TO EVALUATE ANALYTICAL CAPABILITIES.
TATUS:
FOLLOWING THE TMI-2 ACCIDENT THE SEMISCALE CONDUCTED HOH-CONDENSIBLE GAS BUBBLE VENTING EXPERIMENTS IN SUPPORT OF THE TMI-2 ACCIDENT TEAM AND ALSO CONDUCTED TMI-2 TRANSIENT SIMULATION EXPERIMENTS EMPLOYING A B8W PRESSURIZER LINE CONFIGURATIDH. THESE LATTER TESTS DEMONSTRATED THAT CORE REGION UNC0VERY CAH OCCUR EVEN THOUGH PRESSURIZER LEVEL READINGS WOULD INDICATE A COVERED CORE.
A REVISED SEMISCALE PROGRAM PLAN HAS BEEN DEVELOPED FOR FY 1980 WHICH STRESSES SMALL BREAK LOCA'S AND PLANT TRANSIENT EFFECTS. THIS REDIRECTION IS IN KEEPING WITH ACRS RECOMMENDATIONS TO CONCENTRATE OH PLANT TRANSIENTS AND SMALL LOCA'S, AS WELL AS IHITIATING A SERIES OF SMALL BREAK TESTS TO SUPPORT LOFT SMALL BREAK TESTING PLAHHED FOR FY 1980.
HRR SMALL BREAK MODEL EVALUATIONS WILL UTILIZE BOTH THE SEMISCALE AND LOFT SMALL BREAK TEST DATA.
THE PLANNED FY 1980 EFFORT SUMMARIZES AS FOLLOWS:
1 SMALL BREAK TESTS SB-4 AND SB-4A (COUNTER PART TESTS TO THE LOFT NUCLEAR SMALL BREAK TEST L3-1) WERE CONDUCTED IN EARLY NOVEMBER 1979.
CURRENT PLAHS CALL FOR CONCLUDING THE LOFT SUPPORT SMALL BREAK TESTS BY MID FY 1980.
2.
REDIRECTED EFFORT HAS DEFERRED COMPLETION OF PREVIOUSLY PLANNED LARGE LOCA UHI EXPERINENTS, ALSO, THE PREVIOUS LARGE BREAK LOCA EXPERIMENT (S-07-6) WILL BE RERUN AFTER THE MOD 2A COHVERSIDH TO EVALUATE THE EFFECTS OF AN IMPROVED DOWNCOMER AND VESSEL THERMAL INSULATION.
5-3
NUCLEAR REGULATORY RESEARCH DATAASOF: APRIL 22,1980
,,oeseso*
3.
INTERIM FACILITY UPGRADES, MOD 2A COHVERSIDH (E.G.,
INSTALLATION OF A SECOND PWR SCALED PRIMARY LOOP PUMP, A SECOND FULL HEIGHT UTSG, ADDITIONAL THERMAL INSULATION TO MINIMIZE SYSTEM HEAT LEAKAGES), WILL BE INITIATED IN THE THIRD QUARTER OF FY 1980.
AS WELL AS DESIGN WORK FOR A SEMISCALE SYSTEM UPGRADE TO SIMULATE A 2 X 4 PWR CONFIGURATION HAVING TWO INDEPENDENT SECONDARY LOOPS WITH HEAT DUMP CAPABILITY.
4.
PLAH AND CONDUCT SEPARATE EFFECTS TESTS (IN THE THIRD AHD FOURTH QUARTERS OF FY 1980) ADDRESSING: STEAM GENERATOR AND FEEDWATER SYSTEMS TRANSIENTS, NATURAL CIRCULATIDH EFFECTS WITH TWO-PHASE EFFECTS, EFFF. CTS OF H0H-CONDENSIBLE GASES, ETC.
5.
PUMPS-OH AND PUMPS-OFF EXPERIMENTS FOR SMALL BREAK LOCA TRANSIENTS ARE 10 BE PERFORMED IN THE SEMISCALE FACILITY FOR BOTH COLD AND HOT LEG BREAKS IN THE SECOND QUARTER OF FY 1980.
l POTENTIAL PROBLEMS:
1.
AVAILABILITY OF, AND inMING OF, FY 1980 SUPPLEMENTAL FUNDING.
2.
FIHAL AGREEMENT OH FY 1980 EXPERIMENTS PLAHHED FOR QUARTERS 3 AND 4.
l i
s t
l l
l 5-4 l
I NUCLEAR REGULATORY RESEARCH DATAASOF: APRIL 22, 1980 POWER BURST FACILITY 1060
&D#
90 PURPOSE:
THE POWER BURST FACILITY (PBF) USES A PRESSURIZED TEST LOOP IN A POOL-TYPE 30 MEGAWATT (STEADY STATE) REACf0" CAPABLE OF PULSED OPERATIDH. IT IS LOCATED AT THE IDAHO NATI0HAL ENGINEERING LABORATORY AND IS USED TO OBTAIN DATA OH THE PERFORMANCE OF FUEL ROD CLUSTERS UNDER ABHORMAL POWER, COOLANT FLOW AND EHERGY DENSITY CONDITIDHS. THIS INCLUDES THE PCM (POWER COOLING MISMATCH) TEST, LOCA (LOSS OF COOLANT ACCIDENT) TESTS. RIA (REACTIVITY INITIATED ACCIDENT) TESTS AHD IHLET FLOW BLOCKAGE TESTS.
THE DATA OBTAINED WILL BE USED TO DEVELOP OR TEST AHALYTICAL CAPABILITY WHICH CAN BE USED TO PREDICT FUEL RESPONSE IN REACTORS DURING OFF-NORMAL OPERATION CONDITIONS.
STATUS:
A DOUBLE-tHDED COLD LEG BREAK TEST (LOC-3) WITH PRESSURIZED RODS WAS PERFORMED IH JUNE.
THIS WAS THE FIRST OF FOUR PBF LOCA TESTS WHICH WILL EXPLORE THE RELATIVE r.AD BALLOONING OVER THE 1050K-1500K (1430F-2240F)
PEAK CLAD TEMPERATURE RANGE. IN WHICH MAXIMUM CLAD BALLOONING AND RESULTANT FLOW CHAHHEL DLOCKAGE MAY BE POSSIBLE. ALL FOUR RODS HAD SMALL RUPTURES, WITH 20% TO 50% BALLOOHING AND ESTIMATED PCTS OF 1150K-1250K AT THE TIME OF RUPTURE.
THE SECOND OF THE FOUR LOCA PROGRAM TESTS (LOC-5) WAS PERFORMED IN SEPTEMBER TO STUC( RELATIVE CLAD BALLOONING AT A 1300K (1880F) PCT (LOW BETA PHASE).
BECAUSE OF CHECK VALVE MALFUNCTIONS, OHLY ONE TEST ROD REACHED THE WANTED TEt1PERATURE RANGE $0 THE TEST WAS REPEATED IN DECEMBER. TWO VALVES AGAIN MALFUNCTIOHED SO ONLY TWO RODS HEATED CORRECTLY. FURTHER LOC TESTS WILL BE DELAYED UHTIL ALL MALFUNCTIONING HARDWARE IS REDESIGHED AND THE TEST TRAIH IS REFITTED OR REPLACED.
FOUR SURFACE THERMOCOUPLE QUENCH TESTS WERE PERFORMED IN OCTOBER. THESE LOCA BLOWDOWN-HEATUP-REFLOOD TESTS COMPARED THE TIME-TEMPERATURE RESPONSES OF FUEL AND IHHER CLADDING FOR FUEL RODS WITH AND WITHOUT EXTERNAL CLAD-DING THERMOCOUPLES. THE RODS WITHOUT EXTERNAL THERMOCOUPLES WENT INTO DEPARTURE FROM NUCLEATE BOILING SOONER, REACHED HIGHER INTERHAL CLAD TEMPERATURES DURING THE SIMULATED ACCIDENT AND REWET LATER THAH THE RODS FITTED WITH EXTERHAL THERMOCOUPLES.
TEST PR-1, A MULTIPURPOSE PCM, REWET. STORED ENERGY, RIA TEST, WAS COMPLETED FEBRUARY 22, 1980.
PRELIMINARY ANALYSES OF THE DA1A INDICATE A HYSTERESIS IN THE POWER AHD COOLANT VALUES FOR OCCURREHCE OF BOILING TRANSITION AND RETURH TO HUCLEATE BOILING UNDER THE SAME PRESSURE AND LOOP CONDITIDHS. H0 SIGNIFICANT DISPERSAL OF FUEL FROM A WATER-LOGGED ROD OCCURRED DURING THE RIA TESTS TO 180 CAL /G UO2 ENTHALPY INSERTION, THOUGH PRESSURE PULSES IN THE ROD WERE OBSERVED.
THE ONLY ARGON FILLED ROD DID HOT BURST AHD REACHED CLADDING TEMPERATURES ABOUT 300K LESS THAN THE HELIUM FILLED RODS WHICH DID BURST.
THE DATA ARE BEING AHALYZED FURTHER.
THE POWER CALIBRATION TESTS FOR RIA 1-4 WERE COMPLETED BY APRIL 4, 1980 AND THE SPECIMEH TRAIN HAS BEEN REMOVED FROM THE IPT TO ALLOW INSERTION OF HEW FLUX WIRES AND A REPLACEMENT SPECIMEH FUEL ROD.
THE RIA 1-4 TEST IS SCHEDULED TO BE CONDUCTED OH APRIL 15, 1980.
MODIFICATIONS OF THE TEST LOOP PUMP FOR VARIABLE SPEED TO PROVIDE A BROADER RANGE OF FLOW CONDITIDHS WERE COMPLETED IN FY 1979.
THESE MODIFICATIONS WILL IMPROVE LOOP PERFORMANCE FOR THE EXPERIMENTAL PROGRAM. A MODIFICATION TO REDUCE THE CONTROL ROOM NOISE LEVEL WAS COMPLETED IN CECEMBER.
PROBLEMS:
FURTHER LOC TESTS WILL BE DELAYED UHTIL ALL MALFUNCTIONING HARDWARE IS REDESIGHED AHD THE TEST TRAIN IS REFITTED OR REPLACED.
5-5
NUCLEAR REGULATORY RESEARCH oarnasor: apart 22', 1980 PRESSURIZED WATER REACTOR BLOWDOWN HEAT TRANSFER PROGRAM VggEO N pgO (PWR-BDHT)
O?O PURPOSE THE BDHT PROGRAM AT ORNL IS DESIGHED TO INVESTIGATE TRANSIENT HEAT TRANSFER PHEHOMENA IN A SIMULATED FUEL BUNDI.E ASSEMBLY. SPECIFICALLY, TIME-TO-CRITICAL HEAT FLUX (CHF). TRANSITION HEAT TRANSFER UNDER UPFLOW AND DOWNFLOW CONDITIONS AND RETURN TO NUCLEATE BOILING WILL BE INVESTIGATED UNDER BLOWDOWN CONDITIONS. TRANSFER EXPERIMENTS WILL BE CdHDUCTED TO INVESTIGATE HEAT TRANSFER UNDER CONDITIONS THAT COULD BE ENCOUNTERfD UNDER SMALL LOCA CONDITIONS.
STATUS
~
THE TEST LOOP SHAKEDOWN WAS CONCLUDED IN NOVEMBER 1979.
THE IHITIAL ROUND OF BUNDLE UNC0VERY/ RECOVERY TESTS AT PRESSURES OF 400-1000 PSIA WERE COMPLETED IN JANUARY 1980.
A PRELIMINARY DATA SET MAS ISSUED IN LATE FEBRUARY 1980 FOR LOW POWER, HIGH PRESSURE AND BUNDLE UNC0VERY/
RECOVERY HEAT TRANSFLR DATA.
FACILITY PREPARATION IS UNDERWAY FOR THE INITIAL " FILM BOILING" BLOW-DOWN 1RANSIENTS. BUNDLE PRESSURE SEAL PROBLEMS HAVE GCCURRED AND THd FACILITY IS CURRENTLY OUT OF OPERATION FOR PRESSURE SEAL REPL \\ CEMENT.
PROBLEMSt BUNDLE F0WER CONTROLLER / PROTECTIVE CIRCUIT TRIP AND SEAL PROBLEMS HAVE BEEN ENCOUNTERED. THE ESTIMATED SCHEDULE FUK RESOLUTIOH OF THESE PROBLEMS IS IN THE SECOND QUARTER OF FY 1960.
CURRECTIVF SOLUTIONS ARE BEING INVESTI3ATED AND A CONTINGENCY PLAN HAS BEEN PREPARED.
l 56
NUCLEAR REGULATORY RESEARCH DATAASOF: APRIL 22,1980 HEAVY SECTION STEEL TECHNOLOGY PROGRAM (HSST) gpED N
gO PURPOSE THE PURPOSE OF THE HSST PROGRAM IS TO DEVELOP AND EVALUATE METHODS OF FRACTURE ANALYSIS OF HEAVY SECTION STEEL LIGHT WATER REACTOR PRESSURE VESSELS FOR IHCLUSIGH IN CODES AND STAHDARDS. THERMAL SHOCK AND PRESSURE TESTS OF MODEL REACTOR PRESSURE VESSELS ARE CARRIED OUT AT THE OAK RIDGE NATIONAL LABORATORY. THE STATE-OF-THE-ART IS BEING ADVANCED BOTH IN THE EFFECTS OF IRRADIATION AND IN THE METHODS USED TO ASSESS REACTOR SAFETY.
STATU$t TESTS ON DELIBERATELY FLAWED VESSELS HAVE BEEN PERFORMED TO VERIFY THE LINEAR ELASTIC FRACTURE MECHANICS METHODOLOGY, AS WELL AS HEWER METHODS FOR ELASTIC-PLASTIC FRACTURE MECHANICS WHEREIN SLOW CRACK GROWTH OCCURS I
PRIOR TO FAST FRACTURE.
THE RESULTS HAVE SATISFACTORILY VALIDATED LINEAR ELASTIC FRACTURE MECHANICS; THE EXCELLENT AGREEMENT BETWEEN FAILURE AND RESULTS BASED OH ELASTIC-PLASTIC ANALYSIS HAS ALSO PROVIDED GOOD CONFIDENCE FOR LICENSING APPLICATION OF THIS METHODOLOGY. IN GENERAL, THE TESTS 1
HAVE SHOWN THAT PRESSURES TWO TO THREE TIMES DESIGN PRESSURE, IN ACCORDANCE WITH THE REQUIREMENTS IN THE ASME CODE, ARE REQUIRED TO CAUSE FAILURE IN A FLAWED VESSEL. TWO RECENT TESTS OH WELD REPAIRED VESSELS HAVE SHOWN THAT THE REPAIR WELD PROCEDURE AS SPELLED OUT IN THE ASME CODE, PRODUCES VERY SOUND WELDS BUT ALSO INDUCE UNACCEPTABLE RESIDUAL STRESSES IN IF E MATERI AL SURROUNDING THE WELD.
THESE STRESSES DO NOT COMPROMISE THE WELD BUT CAN LEAD TO ACCELERATED FATIGUE CRACKING OF THE VESSEL.
A SERIES OF FOUR TESTS ON THICK-WALLED STEEL CYLIHDERS UNDER THERMAL SHOCK CONDITIONS HAVE WELL VALIDATED LINEAR ELASTIC FRACTURE MECHANICS AS A METHOD-OLOGY FOR ASSESSING VESSEL RESPONSE TO LOCA/ECCS THERMAL SHOCK ACCIDENTS.
THE PHEHOMEH0H OF WARM PRESTRESSING HAS BEEN PROPOSED AS AN ADDITIONAL DETERRENT TO CRACK INITIATION AND EXTENSIGH UNDER THERMAL SHOCK; THIS IS HOW BEING INVESTIGATED USING LARGER, THICK-WALLED STEEL CYLINDERS. IN THIS SERIES OF TESTS, CYLINDERS OF THE SAME SCALE AS INTERMEDIATE TEST VESSELS ARE BEING SUBJECTED TO LIQUID NITROGEN SHOCKING TO PROVE THE CONCEPT OF WARM PRESTRESSING, AND ALSO TO ESTABLISH THE LIMIT OF CRACK EXTENSION FOR
, VERY DEEP CRACKS, I.E..
TO PROVE THAT A DEEP CR ACK C AHHOT PROP AGATE THROUGH A VESSEL WALL.
THE FIRST TEST IN THIS LATTER SERIES WAS RUH ON AUGUST 1,
1979.
ANALYSIS OF THE RESULTS OF THESE TESTS SHOWED THAT THEY WERE INCONCLUSIVE AS REGARDS WARM PRESTRESSING. THE POST-TEST ANALYSIS ALSO GAVE CLEAR EVIDENCE THAT THE FRACTURE BEHAVIOR OF THE MATERIAL IN THICK WALL VESSELS, WHEN SUBJECTED TO UPPER TR ANSITION CUF.vE TEMPER ATUPES, WILL BE GOVERHED BY THE LOWER BOUND FRACTURE TOUGHNESS VALUES FOR THAT MATERIAL AS DEfERMINED FROM SMALL SPECIMEM TESTIHG. A 'OMPREHENSIVE PROGRAM TO ESTABLISH LOWER BOUND VALUES FROM SUCH TESTING HAS BEEN IHITIATED THE SECOND EXPERIMENT IN THAT SERIES IS BEING PREPARED.
AN IRRADIATION PRGGRAN ON HEAVY SECTION LOW DUCTILE SHELF WELD MET 4L TEST SPECIMENS IS UNDERWAY TO QUANTIFY THE POTENTIAL TOUGHNESS LOSS CAUSED BY NEUTRON IRRADIATIDH DAMAGE AND ASSESS COMPLIANCE WITH APPENDICES G AND H OF 10 CFR S0.
THE FIRST THREE IRRADIATIONS ARE COMPLETE AND TESTING HAS BEGUH.
A QUALIFICATION PROGRAM, FOR THE TESTING METHOD TO BE USED TO EVALUATE THE FRACTURE TOUGHHESS IN FRACTURE MECHANICS TERMS FROM SMALL SPECIMENS, IS IN ITS FINAL STAGE; I.E.,
A MULTI-LABORATORY EVALUATION OF THE TESTING PROCEDURE. TESTING OF THE SMALLER FRACTURE TOUGHHESS SPECIMENS HAS STARTED AND THE FIRST SETS OF DATA FRCM CHARFY AND CCMFACT lENSILE' SPECIMENS HAVE BEEN DEVELOPED. COMPLETION OF THE FRACTURE TESTING OF THE REMAIHDER OF THE IRRADIATED SPECIMENS AWAITS COMPLETION OF THE TEST PROCEDURE.
PROBLEMS:
NONE 5i
l 1
SECTION VI -
FOREIGN REACTORS w-w-
-ww,
SUMMARY
0F FOREIGN POWER REACTORS NUtstERSIN PAAFNTHESES ARE NET MUIE DATA AS OF APRIL 30, 1980 PEACTORS REACTORS UNDER REACTORS TOTAL COUNTRY OPERATING CONST PLANNED REACTORS ARGENTINA 1 (335) 1 (600) 2 4
AUSTRIA 1 (692)w 1
BELGIUM 3 (1650) 3 (2825) 1 7
BRAZIL 3 (1870) 1 4
BULGARIA 2 (880) 2 (880) 4 CANADA 9 (4750)*
6 (3494) 5 20 CUBA 1
1 CZECHOSLOVAKIA 1 (110) 4 (1760) 5 DENMARK 2
2 EGYPT 3
3 FINLAND 2 (1080) 2 (1080) 4 FRANCE 18 (10,058) 22 (21.245) 10 50 GERMAN DEMOCRATIC REPUBLIC 4 (1390)M 3 (1320) 7 GERMAN FEDERAL REPUBLIC 15 (9012) 7 (8125) 7 29 GREECE 1
1 HUNGARY 4 (1740) 4 INDIA 3 (602) 5 (1080) 8 INDONESIA 1
1 IRELAND 1
1 ISRAEL 1
1 ITALY 4 (1387) 1 (40) 4 9
JAPAN 20 (12333) 9 (8103) 1 30 KOREA, REPUBLIC OF SOUTH 1 (595) 2 (1294) 6 9
LIBYA 1
1 LUXEMBOURG 1
1 MEXICO 2 (1308) 2 NETHERLANDS 2 (493) 2 NORWAY 1
1 PAKISTAN 1 (125) 1 2
PHILIPPINFS 1 (620) 1 2
POLAND 2
2 ROMANIA 1
1 SOUTH AFRICA, REPUB'.IC OF 2
2 SPAIN 4 (1973) 7 (6310) 6 17 SWEDEN 8 (5500)N 2 (1800) 2 12 SWITZERLAND 4 (1940) 1 (942) 2 7
TIAPAN 1 (636) 5 (4508) 6 TURKEY 1
1 UNITED KINGDOM
-33 (8080) 6 (3700) 39 USSR 22 (8875)N 11 (10040) 33 YUGOSLAVIA 1 (615) 1 TOTAL 159 (72,496) 110 (85,299) 67 337 AUSTRIA ZWENTENDORF 692 BWR CANADA BRUCE 3 746 CANDU i
SWEDEN RINGHALS 3 900 PWR FORSMARK 1 900 BWR l
USSR KURSK-1000 LGR l
EREACTOR CONSTRUCTION COMPLETED, NOT YET IN COMMERICAL OPERATION 1
l 2 -
EXPORT LICENSE APPLICATIONS DESCRIPTION:
This chart tracka combened 'maior' and
'm.nor'. purt lwensing actions.
DATA AS oft APRIL 30, 1980 Statistics for this page are obtained from the Summary of Pending E sport Lkenses prepared by MPA for the Of f ace of International Programs.
I E xport Licenses l
350 _ _
300 _
KliY:
l RECElVED
- 250 _
l CCMPLETED PE NDING
--a
- s = = = =%
e '%~~ #
/o 200 _ _ s**,s'p
% % %w/
p 150 _
100
- N
- j#
s
'N v
N N
50 -
\\-
N.
O_
g JUL AUG SEP.
OCT Nov DEC JAN FEB NAR APR NAY X
RECEIVED 49 74 79
'8-62 50 46 63
_10_
58 COMPLETED 37 49-58 69 44 45 49
$2 56 24 PENDING 165 179 196 i90 167 212 213 193 l 187 216 6-3
EXPORT LICENSE APPLICATIONS (CONTINUED)
DATA AS OFI APRIL 30, 1980 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN REPLY 3
0 1
1 1
0 1
0 0
1 AWAITING APPLICANT IN PREPARATION FDR TRANSMITTAL JO STATE 2
to 4
0 0
4 1
1 3
to DEPARTMENT UNDER EXECUTIVE BRANCH 124 123 144 145 147 158 140 138 137 0
REVIEW ROUTINE RELOAD 0
0 0
0 0
0 0
0 0
0 IN PREPARATION FOR 7
5 5
5 5
6 16 15 4
2 COMMISSION REVIEW M
SENT TO DOE 11 0
20 21 22 16 14 18 17 15 UNDER COMMISSION REVIEW 5
2 1
1 1
1 4
4 4
8 IN PROCESS FOR ISSUANCE O
8 0
2 0
5 8
6 4
7 UNDER FURTNER REVIEW-12 12 13 12 to 12 13 to 17 19 SPECIAL CASEE UNDER GENERIC APPROVAL 0
1 6
2 0
6 14 1
0 6
RETURNED FROM STATE O
O 0
0 0
0 0
0 0
1 NO ACTION AMENDMENT ONLY IN O
7 1
0 0
3 1
0 0
0 PROCESS ISSUANCE AWAITING GENERIC ASSUR-ANCES ON TRANSFER OF 1
1 1
1 1
1 1
0 1
1 COMPONENTS 8 MATERIALS u 146 APPLICATIONS ARE NOT INCLUDED (GOES TO STATE) 6-4'
i 1
l SECTION Vil -
EXEMPTIONS l
1 EXEMPTIONSISSUED DATA AS OF APRIL 30. 1980 CATEGORY I EXEMPTIONS ISSUED DURING FY 1980 t
A CATEGORY I EXEMPTION IS DEFINED AS A SPECIFIC EXEMPTION FROM SPECIFIC PARTS OF THE REGULATIONS 45 WHERE A SUBSTITUTION MAY BE GRANTED.
40 35 30 25 70 15 10 XXX XXX XXX 5
-XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX MONTH JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN l
HUMBER ISSUED 6
0 7
2 0
2 0
4 0
2 CUMULATIVE TOTAL 214 214 221 2
2 4
4 8
8 to
<----FY-1979----><-------- -------------FY-1980------------------------>
l l
KEY FOOTHOTE: H0 CATEGORY I EXEMPTIONS WERE GRANTED A:BBB PRODUCTIDH 8 UTILIZATION FACILITIES IN THE OFFICES OF INTERNATIONAL B:XXX MATERIALS PROGRAMS AND NUCLEAR REACTOR C:$$$ TRANSPORTATION REGULATION.
D:...
IMPORT / EXPORT 72
EXEMPTIONSISSUED DATA AS OF APRIL 30, 1980 CATEGORY II EXEMPTIONS ISSUED DURING FY 1980 35 A CATEGORY II EXEMPTION IS DEFINED AS THE GRANTING OF RELIEF OR EXCEPTIONS TO SPECIFIC PARTS OF 30 REGULATIONS WHERE SUBSTITUTION IS PROVIDED FOR IN THE RULE.
25
)
20 ett 888 XXX 888 XXX XXX XXX XXX 15 XXX XXX XXX i
XXX XXX XXX XXX XXX XXX XXX XXX XXX 888 XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX 10 XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX AxX XXX XXX 5
XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX MONTH JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY M
HUMBER ISSUED 13 15 14 10 8
12 w11 20 18 13 CUMULATIVE TOT AL 145 200 214 to 18 30 41 61 79 92
<----FY-1979----><----------------------FY-1980------------------------>
MMOTICE OF ADDITIONAL EXEPPTIONS GRANTED RECEIVED AFTER 3/3/80 KEY A:588 PRODUCTION 3 UTILIZATION FACILITIES B:XXX MATERIALS C:$$$ TRANSPORTATION D:...
IMPORT / EXPORT FOOTNOTE: FOR THE MONTH OF APRIL THE OFFICE OF INTERNATI0HAL PROGRAMS AND THE DIVISION OF OPERATING REACTORS, NRR, DID NOT ISSUE ANY EXEMPTIDHS.
73
l SECTION Vill -
NRC OVERVIEW t
- w U.S. Electric ReliabEity Councils and Commercial Nuclear Power Reactors 'm the United States
- ~ ~ w:, -
~v"
~
~ ~q p r< m m m. m m m n n: wymmemm:e - ~ ~ww+ ; y;e.m v ~vm - m. ~;
e g.
7 4
n.#
,.s
)
a l
{
}
j g,
{.
/J i
en -
gM,,
'~
+
~
7 e
\\ t
,:NPCC N
i
{ aA f;j h hf jy"
[
MARCA jj 44, L.rr4 2
a
[;7 n
,7.y u
w1. - ;
a
~
- :V AAC,.,
c p::
t.
A
'yv WY gg
.c
+
c n;
..f
)
g M " J :-
A
';. Ph h;
F T
]
.^
^~
q=
(
a hea l
kk./ I '
~w
.\\
s,
- ,~.
=
~
~.
g L
4 m
.jgel AECAR, i
c I
h
/
WSCC M? / M A N,",
- lfi a
[. A
.M
\\
445 s
m%
-q:q m
4 4
e x
E
! ?
3 p>
m D
W%r.
/**
n.gm en -
A Akb.~
A Mgm.
j%e) swpp
^~~;s. s W' '
%^ ' v.. :....:
v F ~m, << < ^,
w ei sc k
.ss ss,
Aa 8'
Ms A
D/
AA c.2 ygsAs n
A fk gp g
om ses "
d i, ' 7g s
- 9 AAA
. g L
]
ERC q*
Y's e
w*
o 2
t.
F 44,9 g:n i
Yi yf
,j }%
p,d _ >
sDiggg,[s d
g,....' a g
i"
.a a
y.
a :
AA a
.;p2:4&gs & h '44sa!
f
~ g i
l Qg' '
3
+
W~
.d REGION V$;y q
L 1
.a yk.
g 4 7 c
ci ii i
- 3 e
d7..4 W:
k Alaska W
^L W
J x::
.o y
p 3
e s
g
- 1 H,a w a..
ii k
4 i -
- 4 N
a e GION 11 Fi RE y
mpqy'e
- 7,
+
9 gJ..
j//! ~
u M
n 1<
a4 j
p+w gi
- Canal Zone p
@j Puerto Rico
,a f<
j; fi E
p)l "
By, s]~
4.;go ~,
t.
~,
l
.3 y
p s
k.<
s 9; V,rg,in Islands n.
a tw > ',
A: a m
i khmus.d h AEdfds=d ima A A i swaa n m a.m sd haAud32MCLU$i; s u.. J u Licensed to Operate A Under Construction e Application Under Review % Regional Offices (incl. Limited Work Authorizations) 1
U.O. Electric Reliability Councils and U.O. Regional Offices NUCLEAR POWER UNITS GROUPED GEOGRAPHICAltY BY REGIONAL EL ECTRIC REtI ABILITY COUNCItSI ECAR (East Central Area Reliability Coord. Grouo) (LIC) POINT BEACH 1 WISCONSIN (PCP) BAILLY 1 INDIANA (LIC) POINT' BEACH 2 WISCONSIN (LIC) BEAVER VALLEY 1 PENNSYLVANIA (LIC) QtPAD CITIES 1 ILLINDIS (PCP) BEAVER VALLEY 2 PENNSYLVANIA (LIC) QUAD CITIES 2 ILLINDIS (LIC) BIG ROCK POINT 1 MICHIGAN (LIC) ZION 1 ILLINDIS (LIC) COOK 1 MICHIGAN (LIC) ZION f ILLINDIS (LIC) COOK 2 MICHIGAN COL ) N ICO I2 C IGAN (PCP) MARBLE HILL 1 INDIANA (LIC) COOPER STATION NEBRASKA (PCP) MARBLE HILL 2 INDIANA (LIC) DUANE ARNOLD IOWA (OL ) MIDLAND 1 MICHIGAN (LIC3 FORT CALHOUN 1 NEBRASKA U.S. Nuclear Regulatory (OL ) MIDLAND 2 MICHIGAN (FTLJ LA CROSSE WISCONSIN Commissio^ Regional Offices (FTL) PALISADES MICHIGAN (FTL) MONTICELLO MINNESOTA (PCP) PERRY 1 OHIO (LIC) PRAIRIE ISLAND 1 MINNESOTA Region L 21 5 337 1150 (PCP) PERRY 2 OHIO (LIC) PRAIRIE ISLAND 2 MINNESOTA 631 Park Avenue (OL ) ZIMMER 1 OHIO Kinj of Prussia, Pennsylvan.a 19406
(
Power Coord. C c
{
ERCOT (Electric Reliabilitv Council of Texas)
Region ll, 404 221-4503 Suite 3100,101 Marietta Street (CP ) ALLENS CREEK 1 TEXAS (FTL) GINHA NEW YORK Attama, Ge rg a 0303 M
(LIC) HADDAM NECK CONNECTICUT n
(LIC) INDIAN POINT 1 NEW YORK Region lli, 312 858 2660 (OL ) SOUTH TEXAS 1 TEXAS (LIC) INDIAN POINT 2 NEW YORK 799 Roosevelt Road (OL ) SOUTH TEXAS 2 TEXAS C'en Eityn, lihnois 60137 (LIC) INDIAN POINT 3 NEW YORK
- ionlV, 817-334-2841 MAAC (Mid-Atjantic Area Counci U f
f j
Refte 1000 Su (LIC) CALVERT CLIFFS 1 MARYLAND CLIC) MAINE YANKEE MAINE Texas 7E12 f
f f
r ing K
R EY (PCP) HOPE CREEK t HEW JERSEY (PCP) MILLSTONE 3 CONNECTICUT Regon V, 41 5 932-8300 1990 N California Blvd.
(PCP) HOPE CREEK /
HEW JERSEY (CP ) MONTAGUE 1 MASSACHUSETTS Walnut Creek Plaza Suite 202 (PCP) LIMERICK 1 PENNSYLVANIA (CP ) MONTAGUE 2 MASSACHUSETTS Walnut Creek, Cahtornia 94596 (PCP) LIMEPICK 2 PENHSYLVANIA (CP ) NEW ENGLAND 1 RHODE ISLAND f
2 B
2 N
IA 0
(LIC) PEACH BOTTOM 3 PENNSYLVANIA (CP ) NEW HAVEN 2 NEW YORK (LIC) SALEM 1 NEW JERSEY CLIC) NINE MILE POINT 1 NEW YORK (OL ) SALEM 2 NEW JERSEY (PCP) HINE MILE POINT 2 NEW YORK (OL ) SUSQUEHANNA 1 PENNSYLVANIA (LIC) PILGRIM 1 MASSACHUSETTS (OL ) SUSQUEHANNA 2 PENHSYLVANIA (CP ) PILGRIM 2 MASSACHUSETTS (LIC) THREE MILE ISLAND 1 PENNSYLVANIA hAB (LIC) THREE MILE ISLAND 2 PENHSYLVAMIA U.S. Electric Reliability Councd, s (OL ) SHOREHAM HEW YORK MAIN (Mid-Amer ca Interocol Network) i (PCP) STERLING 1 NEW YORK (OL ) BRAIDWOOD 1 ILLINOIS (LIC) VERMONT YANKEE 1 VERMONT ECAR East Central Area Reliability (OL ) BRAIDWOOD 2 ILLINDIS Coordination Agreernent (LIC) YANKEE-ROWE 1 MASSACHUSETTS (OL ) BYRON 1 ILLINDIS MAIN Mid-Arnerica interpool Network (OL ) BYRON 2 ILLINDIS MAAC Mid-Atlantic Area Council (PCP) CALLAWAY 1 MISSOURI Regional Status of Nuclear Power Reactors MARCA Mid Continent Area Reliability (PCP) CALLAWAY 2 MISSOURI Data as of: February 29,1980 Coordination Agreernent (PCP) CLINTON 1 ILLINDIS NPCC Northeast Power (PCP) CLINTON 2 ILLINOIS Region i
11 lil IV V
Total Coordinating Council (LIC) DRESDEN 1 ILLINOIS 3
6 7
1 6
23 Reactors Planned or Announced SERC t
t rn E tric 2
17 35 21 10 12
'95 Reactors Authorized to Construct SWPP Southwest Power Pool (LIC) KEWAUNEE WI5CONSIN 22 19 20 5
4 70 Reactors Licensed to Operate A
ERCOT Electnc Reliability Council of Texas 42 60 48 16 22 188 r
tn o ncil
'4 Umts with an LWA are included in the Construction Category 0
U.O. Electric Reliability Councils and U.S. Regional Offices NUCLEAR POWER UNITS GROUPED GEOGRAPHICALLY BY REGIONAL ELECTRIC RELIABILITY COUNCILS!
SERC (Southeastern Reliability Council)
(OL ) WATTS BAR 1 TENNESSEE (OL ) BELLEFONTE 1 ALABAMA (OL ) WATTS BAR 2 TENNESSEE (OL ) BELLEFONTE 2 ALABAMA (PCP) YELLOW CREEK 1 MISSISSIPPI (LIC) BROWNS FERRY 1 ALABAMA (PCP) YELLOW CREEK 2 MISSISSIPPI (LIC) BROWNS FERRY 2 ALABAMA (LIC) BROWNS FERRY 3 ALABAMA (LIC) BRUNSWICK 1 NORTH CAROLINA SWPP (Scuthwest Power Pool)
(LIC) BRUNSWICK 2 HORTH CAROLINA (LIC) ARKANSAS I ARKANSAS COL ) CATAWBA 1 SOUTH CAROLINA (LIC) ARKAHSAS 2 ARKAHSAS (OL ) CATAWBA 2 SOUTH CAROLINA (CP ) BLACK FOX 1 OKLAHOMA (PCP) CHEROKEE 1 SOUTH CAROLINA (CP ) BLACK FOX 2 OKLAHOMA (PCP) CHEROKEE 2 SOUTH CAROLINA (OL ) GRAND GULF 1 MISSISSIPPI (PCP) CHEROKEE 3 SOUTH CAROLINA (OL ) BRAND GULF 2 MISSISSIPPI (CP 3 CLINCH RIVER TENNESSEE (PCP) RIVER BEND 1 LOUISIANA (LIC) CRYSTAL RIVER 3 FLCRIDA (PCP) RIVER BEND 2 LOUISIANA (LIC) FARLEY 1 ALABAMA (OL ) WATERFORD 3 LOUISIANA (OL ) FARLEY 2 ALABAMA (PCP) W9LF CREEK 1 KANSAS (PCP) HARRIS 1 NORTH CAROLINA (PCP) HARRIS 2 NORTH CAROLINA WSCC (Western Systems Coord. CounciJl (PCP) HARRIS 3 NORTH CAROLIHA (OL ) DIAbl0 CANYOH 1 CALIFORNIA (PCP) HARRIS 4 NORTH CAROLINA (OL ) DIABLO CANYON 2 CALIFORNIA (PCP) HARTSVILLE A-1 TENNFSSEE (LIC) FORT ST VRAIN COLORADO (PCP) HARTSVILLE A-2 TENNESSEE (LIC) HUMBOLDT BAY CALIFORNIA (PCP) HARTSVILLE B-1 TENNESSEE (PCP) PALO VERDE 1 ARIZOHA (PCP) HARTSVILLE B-2 TENHESSEE (PCP) PALD VERDE 2 ARIZONA (LIC) HATCH 1 GEORGIA (PCP) PALO VERDE 3 ARIZONA (LIC) HATCH 2 GEORGIA (CP ) PEBBLE SPRINGS 1 OREGON (DL ) MCGUIRE 1 NORTH CAROLINA (CP ) PEBBLE SPRINGS 2 OREGON (OL ) MCGUIRE 2 NORTH CAROLINA (LIC) RANCHO SECO 1 CALIFORNIA (LIC) NORTH ANNA 1 VIRGINIA (FTL) SAN OHOFRE 1 CALIFORNIA (OL ) NORTH ANNA 2 VIRGINIA (OL ) SAN ONOFRE 2 CALIFORNIA (LIC) DCONEE 1 SOUTH CAROLINA COL ) SAN OH0FRE 3 CALIFORNIA (LIC) OCONEE 2 SOUTH CAROLTHA (CP ) SKAGIT 1 WASHINGTON (LIC) OCONEE 3 SOUTH CAROLINA (CP ) SKAGIT 2 WASHINGTON (CP ) PERKINS 1 NORTH CAROLINA (LIC) TROJAN OREGON (CP ) PERKINS 2 NORTH CAROLINA (PCP) WASHINGTON NUCLEAR 1 WASHINGTON (CP ) PERKINS 3 NORTH CAROLINA (OL ) WASHINGTON NUCLEAR 2 WASHINGTON (PCP) PHIPPS BEND 1 TENNESSEE (PCP) WASHINGTON NUCLEAR 3 WASHINGTON (PCP) PHIPPS BEND 2 TENNESSEE (PCP) WASHINGTON NUCLEAR 4 WASHINGTON (FTL) ROBINSON 2 SOUTH CAROLINA (PCP) WASHINGTON NUCLEAR 5 WASHINGTON (LIC) SEQUOYAH 1 TENNESSEE (OL ) SEQUDYAH 2 TEHNESSEE (LIC) ST LUCIE 1 FLORIDA (PCP) ST LUCIE 2 FLORIDA (OL ) SUMMER 1 SOUTH CAROLINA I
(LIC) SURRY 1
'/IRGINI A (LIC) SURRY 2 VIRGINIA (PCP) NORTH ANNA 3 VIRGINTA (PCP) NORTH ANNA 4 VIRGINIA (LICs IURKEY POINT 3 FLORIDA (LIC) TURKEY POINT 4 FLORIDA (PCP) V0GTLE 1 GEORGIA i
REACTORS BY STATE a
state aug sfsGE l staff M
sYa0E Staff M
sfa:E sfa'E M
siaZ 1
I l
l seut, ovet ria
- EW af tsEY 4 Lata =a l
IaD!ama OCC=EE I tas7s LIC seCwns rf eev i (1465:
TIC l
sartly station taest UC OvstEn Cettu tese)
LIC paesLE MIL L t altsas uC l
sate 9 9 testal (IC l
OCo=EE 2 tes73 LIC se0was #Esev 2 stessa LIC I
sacwas FEear s tises)
LIC maestE aILL 2 stissa UC l
satEm 2 r e tts3 LIC a
eCO*EE s tas78 LIC raeL E T 1 ts293 LIC l
easthsCm 2 (70d3 t!C I
acPE CsEEs t (18676 aC l
Catamaa 1 a t tes a UC pattEv 2 ta2sa uCIOt I laina I
m0PE CeEEa 2 tits 7 UC Cata.sa 2 t e tes:
uC s E L L E r0st r E e (1215:
uCIOL l
CwEe:aEE 1 tilasp UC SEttfr0=fE 2 892s53 uC/Ot g
wua=E anect0 (ssal LIC l
l CwEaMEE 2 412 03 uC l
ped Y:eg CufacsEE s 412808 UC I
l sumE t t (9ssa UC/OL artagsas g
mansas l
fir 2PaTe CK vs21s TIC I
semansas a (Ost)
(IC l
n!==a
<+een t!C 60tp CeEEE toisen ut I
lactan Po!=t t tissa TIC l
TE*wEssEE asaansas 2 testa LIC I
l Implan point 2 (srs7 LIC l
!=olse Polar s es733 LIC l
usetsv!LLE t st20sn ut ser2cga tourslawa l
=Inf MILE Polaf 1 (610 LIC l
maetsu!Lif 2 (tress UC l
natisvILLE s (12053 UC mI*E m!LE POInf 2 t t las s ut poefseILLE 4 (12058 UC I
Pato vEeDE 1 ft27s3 UC l
eivEssEm3 1 1934) ut s*3eEnam tas4) uC/0t PaLo vEnct 2 (12703 ut elvtesE=n 2 tes4D UC l
sfEeLI4G t f1:50) uC l
SEsuovan 1 t i toe s LIC PALO VERGE s (1270s uC l
waffarDa3 s (19653 DC/DL JamEsPoaf 1 (11509 uC Stoutvan 2 (19403 UC/0L I
as=EsPCel 2 t t'ss)
UC l
watts saa I (91653 uC/0L g
watts saa 2 titos3 UCrot l
nEw navEn t s12ssa ce PMIPPS sEm3 9 (122:3 bC calif 0tMla l
M1*l NEW Maven 2 (12593 us l
l Pu PPs sE=0 2 at:2s>
UC 1
malme vam EE t7ssa TIC g
CtI=Cn alvfe Essen Un numsotor say ess:
L1C samCd0 SECO E9979 LIC l
cern caentma l
san 0*0raE o tesel (IC l
g clast0 Canv0m t (9004 uC/st I
manyt a*D saunsw!Cs t (02:3 LIC Texas I
seuwsw!Cu 2 talt)
LIC l
clasLO Craf0* 2 Lettsi uCrot San Onoraf 2 sties) uC/ot Catuter Ctlers 1 ts4s3 LIC l
nameIs I tots:
UC C0=s*C=E Pfar a tivsts UC/st I
ComaaCME Pf aa 2 tatssa UC/et saw ow0reE 3 (site uCIOL l
Catvfer CttsFs 2 (443 LIC name :s 2 te?s3 ut l
nasa s3 tots) uC l
50uin venas 1 tatsas UCIOt I
l usee: s4 (9153 uC souva Texas 2 st2ssa utrot Ceterano l
passmenustits pCou::eE 1 c l tse l UC/0L l aLLEus CREEE I (9tsel Ua 1
mCsvInf 2 stissa uC/0L g Ft. sf. wea!N (3305 LIC l
Pitcalm t (6sst LIC e
PEsaIns t
( trat a un l
PILGeIM 2 4 9 tsti up 8
Peta!*s 2 Es2se) ba l
VEP90MT vanaEE-a mE (17s:
LIC l
PEsalms s e t2:03 ue I
C0gwreficuf l
mouracut t tolsen ue vremont vanaEE est43 LIC l
l moniacut 2 (195s3 Wa CChMECTICUT vaNeEE (575)
LIC 1
l ggg l vItalNIa mILtsiO*E I (6 son LIC l
I cavis-SEssE (9s63 LIC l
mIListonE 2 taste LIC gICwIcag mILLsto=E s (1tssa UC l
l ZImmte i teils uC/PL nenin amma 1 tes7>
LIC l
PaLIsacEs tassa L 'C Peter e et205:
ut I
noata amma 2 toefa LIC sis toCs POInf a723 t
C l
PEnev 2 st20s:
ut n0ern an=a 3 testa uC F10eIDa l
Coca t itsset t
- C 43atu anna 4 (9073 UC I
l sueur e is22:
LIC Coos a sittel tc si tuCIE I tas2p LIC l
mIolano 1 (4s2n UCrot I
tuesty point s ases)
LIC mIDLago 2 tais:
uCIOL I
ue/Lha l TUenty point 4 cass:
LIC l
l slaca FON e (19503 ida spi tGTDM slaCa FOX 2 (11ssa be/tha l Carsfat alvEt 3 (s253 LIC l
l I
FIMMEsOft kasM. mutt E at n (92473 UC I
.nsw. muttf as 2 t11:33 UCrot GEORGIA g
m0NTILELLO ts45)
LIC SE123 l
wasm nuCLEae 4 (92s73 ttC F#aleIE Island e tssa)
LIC l
I wasa. nuCLEsa s (12423 UC wasW. muttfas 3 (12423 UC MafCM t (7173 LIC
-l PaaleIE 154 40 2 tss03 I IC TROJAN Ettsst LIC MatCW 2 87923 LIC l
PEsBLE SPefwCs 1 (1260) ut l
saaGIT t (1277)
We EU2 U
l '
'3" 8 I
g MrssrssrPer l
Caa#D GULF 1 (12ssa UCIOt I pgpysytyggIg WisCCyslit l
ItLINDIs gga4D GUL F 2 192595 UC/0L l
VELLCW CEEER I toiss)
UC l
staVEe WaLLEY t 1852)
LIC a
REwaumEE asss3 (IC DefsDEN 1 afsel TIC l
yggggv CeEEE 2 (12:58 UC sE AVEe VatLEY 2 (8523 UC 1
POInf staCN 1 (4973 TIC g
g PEACH 00f f 0m 2 4to6sl LIC l
POINT BEaCM 2 (497)
(IC l
PEaCN 30TTCn s itses)
LIC tacrosst esta LIC 9U40 CIf!Es t (7s93 LIC l
TheEE MILE IstaWD t est99 LIC quad CITIES I (7:13 LIC ehg ZION 1 at:4s)
LIC l
C at t awaY t (11503 UC 9e g
g 000 1 OL g
Catt aY 2 (18503 UC LINEeICK 2 (18653 UC l
suseuEMa#44 9 E19528 UC/0L l seaILwCOD 2 (t1203 UC/0L l
savo4 9
( 112s3 uC/0L gEgggsgg l
s M EHaNNA 2 e MW MM t
seV04 2 (19209 UC/0L l
=
g CLINTON 1 (9ss)
UC l
FT. CALN004 9 (4578 LIC IslaMD CLINTON 2 (950)
UC COOPER staf!0N 7783 LIC l
l LasaLLE 1 (197s3 UC/0L l
l l LIC*tICENsts TO OPfeart u
LasaLLE 2 (ts7sl UC/0L I
UC/0L uuMcEs C04sf eUCTIOM/UNDEe et REVIEW g W HaMPsHret l
l l UCCUNote C04sf euCTIO4/0L APPLICafIDit NOT sfase00t t
(*1943 UC l
l tJe=UNDEs CP aEWIEW eE M ED SEase00K 2 (15943 UC l
g l Ue/LhatuMDER CP eEWIEW/LWa ISSUED I
l 1
I l
98 I
I I
un i
INDEX TO REACTOR SITES DATA AS OF MAY 2,1980 StTE/NAME GTATE)
APPLICANT UNITS PER SITE LIC.
CONST. AUTK PLANNED
1 l'
2 2
- 3. A R N O L D ( 10W A )........................... I CW A ELECTRIC LIGHT 1 POWER.CO.......
1 1
1 1
- 5. B E A V ER V A L L EY ( P EN N ).................... DU Q U ES N E L I GH T CO.................... 2 1
1
- 7. BIG ROCK POINT (MICH)................... CONSUMERS P3WER CO...................
1 1
- 8. BL ACK FOX (0KLAHOMA)....................PUBLIC SERVICE OF OKLAHOMA...........
2 2
- 9. BR AIDWOOD ( ILL IN0!S ).................... COMMONWE ALTH EDISON CO............... 2 2
- 11. BRUNSWICK (N C
)....................... CAR 0 LINA PCWER 8 LIGHT CO............
2 2
- 12. BYRON (ILLIN0IS)........................ COMMONWEALTH EDISON CO...............
2 2
- 13. C A L L A W A Y (M 0. ).......................... U N I O N ELECTRIC CO....................
2 2
2 2
- 15. CATAWBA (S.
C.)......................... DUKE POWER CO........................
2 2
- 16. CHEROKEE (S. C.)........................ DUKE POWER CD........................
3 3
- 18. C L I N T O N ( I L L I N 0 I S )...................... I L L I N D I S P OWE R CO................... 2 2
.19. COMANCHE PEAK (TEXAS).................. TEXAS UTILITIES GENERATING CO........
2 2
- 21. CONN Y ANK E E ( C0NN )...................... CONN Y ANK E E A T OMIC POWER CO.......... 1 1
2e. COOK (MICH)............................. INDIANA 8 MICHIGAN ELECTRIC CO.......
2 2
- 22. COOPER (NEB)........................... NEBRASKA PUBLIC POWER DISTRICT.......
1 1
- 23. CRYST A L RIVER 3 ( FL A )................... FL ORIDA POWER CORP................... 1 1
- 24. D AVI S B ES S E ( 0HIO )..................... T O L E DO E DI S DN CO..................... 1
- 25. DIABLO CANYON (CALIF)................... PACIFIC GAS 8 ELECTRIC CO............
2 2
- 26. DRESDEN (ILLIN0IS)...................... COMMONWEALTH EDISON CO...............
3 3
- 27. FARLEY (ALA)............................ ALABAMA POWER CO.....................
2 1
1
- 28. F ERMI (MICH)............................ DEI ROI T EDISON CO................... 1 1
- 29. FITZPATRICK (N Y )......................P0WER AUTH OF THE STATE OF N.
Y.
.... 1 1
- 30. FORKED RIVER (N J )
......... JERSEY CENTRAL POWER d LIGHT CO......
1 1
31 FORT CALHOUN (NEB)..................... 0MAHA PUBLIC POWER DISTRICT..........
1 1
1 1
- 33. GINNA (N.
Y.)...........................R0CHESTER GAS 8 ELECTRIC.CO..........
1 1
- 34. GRAND GULF (MISS)............
.......... MISSISSIPPI POWER 8 LIGHT CO.........
2 2
- 35. HARRIS (N. C. ).......................... C AF O L I N A P OWER 8 LIGHT CO............
4 4
- 36. H A R TSVIL L E ( T ENN)....................... T EFN ESS EE V A L L EY AUTHORI TY........... 4 4
- 37. HATCH (GECRGIA).........................GE(:RGIA POWER CO.....................
2 2
- 38. HOPE CREEK (N.
J.)......................PUBLIC SERVICE ELECTRIC 8 GAS CO.....
2 2
- 39. HUMBOLDT BAY (CALIF).................... PACIFIC GAS 8 ELECTRIC CD............
1 1
- 40. INDIAN POINT (N Y ).....................C0hSOLIDATED EDISON CO......
........ 3 3
- 41. JAMESPORT ( N. Y. )........................ L 0 h G I S L AN D L I GH T I N G C O.............. 2 2
- 42. KEWAUNEE (WISC).........................WI!CONSIN PUBLIC SERVICE CORP........
1 1
- 43. LACROSSE (WISC).........................DAIRYLAND POWER C00 PERATIVE..........
1 1
- 05.. L IMERIeK ( P ENN )......................... PHI L ADEL PHI A E L EC TRIC CO............. 2 2
...................NAINE YANKEE ATOMIC POWER CO.........
1 1
- 47. MARBL E HILL (INDI AN A)...................PUE L IC SERVICE COMPANY OF INDI AN A.... 2 2
- 48. M C GU I R E ( H. C. ).......................... DU W E P OW E R C O........................ 2 2
- 49. MIDLAND (MICH).......................... CONSUMERS POWER CO...................
2 2
- 50. MILLSTONE (CONN)
.......................N0RTHEAST NUCLEAR ENERGY.CO..........
3 2
1
- 51. MONTAGUE (MASS)...............
......... NORTHEAST NUCL**R ENERGY.CO..........
2 2M
- 52. MONTICELLO (MINN).......................N0RTHERN STAT.5 POWER C0.............
1 1
INDEX TO REACTOR SITES APPUCANT UNITS PE R StTE LtC.
CONST.AUTH.
PLANNED SITEthlAME (STATE)
- 53. NEW HAVEN (N.Y.)........................NEW YORK STATE ELECTRIC 8 GAS........
2 2u
- 54. HINE MIL E POINT (N Y )..................NI AG AR A MOH AWK POWER CORP............ 2 1
1
- 55. NORTH ANN A (V A)......................... VIRGINI A EL ECTRIC 8 POWER CO......... 4 1
3 5 6. 0 CO N E E ( S. C. )........................... D U K E P OW E R CO........................ 3 3
- 57. OYSTER CREEK (N.J.).................... JERSEY CENTRAL POWER 8 LIGHT CO......
1 1
- 58. P A L I S A D ES (MICH )........................ C0N SUM ER S P OW ER C0.................... !
1
- 59. P ALC VERDE ( ARIZ)....................... ARIZON A PUBLIC SERVICE CORP.......... 3 3
6 0. PE ACH BOTTOM (PENN).....................PHIL ADELPHI A EL ECTRIC CD............. 2 2
- 61. PEBBL E SPRINGS (0RE)................... PORTLAND GENERAL ELECTRIC.CO......... 2 2w 6 2. P ER K I N S ( N. C. ).......................... DU K E P OW ER C O........................ 3 3*
- 63. PERRY (0HIO)............................ CLEVELAND ELECTRIC ILLUM.CO..........
2 2
6 4. P HIPPS B END ( T ENN )...................... T ENN ESS EE V A L L EY AUT HORITY........... 2 2
6 5. PI L GRIM (MASS ).......................... BOSTON EDISO N CO.................... 2 1
1*
6 6. POINT BE ACH (WI5 C)...................... WISCONSIN MICHIG AN POWER CO.......... 2 2
- 68. QU AD-CITI ES ( IL L )....................... C0MMONWE A L T H EDISON C0............... 2 2
6 9. R ANCHO SECO (CALIF).....................S ACR AMENTO MUNICIP AL UTILITY DIST.... 1 1
7 0. RIV ER B EN D ( L A )......................... GU L F S T A T E S POWER CO R P............... 2 2
- 71. ROBINSON (S.C.)......................... CAROLINA POWER 8 LIGHT C0..........
.1 1
- 72. S7 LUCIE (FLA)......................... FLORIDA POWER 8 LIGHT CO.............
2 1
1
- 73. SALEM (N.J.)............................PUBLIC SERVICE ELECTRIC 8 GAS CD.....
2 1
1 7 4. S AN ONOFRE (C ALIF)..................... 50UTHERN C ALIFORNI A EDISON........... 3 1
2 7 5. S EABROOK (N.H. ).........................PUBLIC S ERVIC E CO OF H
.H...........
2 2
7 6. SEQUDY AH ( T ENN)......................... T ENN ESS EE V A L L EY AUT HORITY........... 2 2
- 77. SHOREHAM (N Y
).........................L0HG ISLAND LIGHTING C0...............t t
- 78. SK AGIT (W ASHINGTON).....................PUGET SOUND POWER 8 LIGHT............
......................hJUST0N LIGHTING 8 POWER CO..........
2 2
8 0. ST ER L IN G ( N Y ).......................... R0CH EST ER G AS 8 ELECTRIC CO..........
1 1
- 81. SUMMER (S C.)........................
50UTH CAROLINA ELECTRIC & GAS CD.....
1 1
- 82. SURRY ( V A ).............................. VIRGINI A EL ECTRIC & POWER CO......... 2 2
- 83. SUSQUEHANNA (PA)........................PENNSYLVANIA POWER 8 LIGHT CD........
2 2
- 84. THREE MIL E ISL AND (PA)..................METROPOLIT AN EDISDN C0.............. 2 2
- 85. TROJ AN (ORE)
...........................P0RTLAND GENERAL ELECTRIC.............t t
8 6. TURK EY POINT ( FL A)...................... FL 0 RIDA POWER & L IGH T CO............. 2 2
8 8. V0 GT L E ( G E0 RGI A )........................ G EO R GI A P OW ER CO..................... 2 2
- 89. WPPSS (WASH) SATS0P..................... WASH PUBLIC POWER SUPPLY.SYS........ 2 2
- 90. WPPSS (WASH) RICH....................... WASH PUBLIC POWER SUPPLY SYS........
3 3
- 91. WATERF01D (L A)
.........................L0UISIANA POWER & LIGHT CD...........
1 1
- 92. WATTS B AR (TENN)
.......................TENNEi3EE VALLEY AUTHORITY...........
2 2
9 3. WO L F CR E EK ( K ANS AS)..................... K ANS At GAS 8 ELECTRIC C0..............t 1
- 94. YANK EE-ROWE (MA S S )...................... YANKEE A TOMIC EL EC TRIC. CO............ 1 1
2 2
- 96. ZIMMER (OHIO).......................... CINCINNATI GAS 8 ELECTRIC.CO..........t 1
9 7. ZION ( IL L IN0IS )......................... COMMONWEA LTH EDISON C0............... 2 2
ty7mm 70mm 93mm 14mm
- CP APPLICATIONS UNDER REVIEW 98w
INDEXTO REACTORSITES
SUMMARY
177 REACTOR UNITS TO BE LOCATED ON 97 SITES:
1 UNIT SITES - 33 2 UNIT SITES - 51 3 UNIT SITES - 10 4 UNIT SITES - 3 T
LICENSED TO OPERATE:
SITESN UNITS 1 UNIT SITES - 22 22 2 UNIT SITES - 19 32 3 UNIT SITES -
6 15 4 UNIT SITES -
1 1
70 CONSTRUCTION AUTHORIZED:
SITESM UNITS 1 UNIT SITES -
9 9
2 UNIT SITES - 33 61 3 UNIT SITES -
5 12 4 UNIT SITES -
3 11 93 PLANNED:
SITESM UNITS 1 UNIT SITES -
2 2
2 UNIT SITES -
S 9
3 UNIT SITES -
1 3
4 UNIT SITES -
0 0
I4 W SINCE THE SAME SITE COULD CONTAIN A UNIT LICENSED TO OPERATE AS WELL AS A UNIT WITH CONSTRUCTION AUTHORIZATION AND EVEN A PLANNED UNIT THE TOTAL OF THESE SITE NUMBERS COULD BE GREATER THAN THE ACTUAL NUMBER OF INDEPENDENT SITES.
MN TOTALS INCLUDE SITES FOR POSTPONED AND SHUTDOWN UNITS NOT I
INCLUDED IN ' STATUS OF NUCLEAR POWER PLANTS' (1-4 ).
INDEX TO REACTORS BY UTluTY OWNER COOLING UTILITY REACTOR DOCKET TYPE MWe COOLING SOURCE METHOD 1 ALABAMA POWER COMPANY FARLEY 1 05000348 PWR 0829 CHATTAHOOCHEE RIVER CC FACT
- 3. ARIZONA PUBLIC SERVICE PALO VERDE 1 05000528 PWR 1238 SEWAGE TREATMENT COOLING TOWERS
- 4. ARIZONA PUBLIC SERVICE PALD VERDE 2 05000529 PWR 1238 SEWAGE TREATMENT COOLING TOWERS
- 5. ARIZONA PUBLIC SERVICE PALO VERDE 3 05000530 PWR 1238 SEWAGE TRLATMENT COOLING TOWERS
- 6. ARKANSAS POWER 8 LIGHT ARKANSAS 1 05000313 PWR 0850 LAKE DARDANELLE ONCE THRU
- 8. BALTIMORE GAS 8 ELECTRIC CALVERT CLIFFS 1 05000317 PWR 0845 CHESAPEAKE BAY ONCE THRU
- 9. BALTIMORE GAS 8 ELECTRIC CALVERT CLIFFS 2 05000318 PWR 0845 CHESAPEAKE BAY ONCE THPH
- 14. CAROLINA P9WER 8 LIGHT HARRIS 1 05000400 PWR 0900 MAKEUP RESERVOIR NDCT
- 15. CAROLINA POWER 8 LIGHT HARRIS 2 05000401 PWR 0900 MAKEUP RESERVOIR NDCT
- 16. CAROLINA POWER 8 LIGHT HARRIS 3 05000402 PWR 0900 MAKEUP RESERVOIR NDCT
- 17. CAROLINA POWER 8 LIGHT HARRIS 4 05000403 PWR 0900 MAKEUP RESERVOIR NDCT
- 19. CINCINNATI GAS 8 ELECTRIC ZIMMER 1 05000358 PWR 0810 OHID RIVER COOLING TDWER
- 22. COMMONWEALTH EDISON BRAIDWOOD 1 05000456 PWR 1120 KANKAKEE RIVER CC ART
- 23. COMMONWEALTH EDISON BRAIDWOOD 2 05000457 PWR 1120 KANKAKEE RIVER CCART
- 25. COMMONUEALTH EDISON BYRON 2 05000455 PWR 1120 ROCK RIVER CCHNDCT
- 26. COMMONWEALTH EDISON DRESDEN 1 05000010 BWR 0200 KANKAKEE RIVER Or>5 THRU
- 27. COMMONWEALTH EDISON DRESDEN 2 05000237 BWR 0809 KANKAKEE RIVER COOLING LAKE
- 28. COMMONWEALTH EDISON DRESDEN 3 05000249 BWR 0809 KANKAKEE RIVER COOLING L AKE
- 29. COMMONWEALTH EDISON LASALLE 1 05000373 BWR 1078 RESERVOIR POND
- 30. COMMONWEALTH EDISON LASALLE 2 05000374 BWR 1078 RESERVOIR POND
- 31. COMMONWEALTH EDISDN QUAD CITIES 1 05000254 BWR 0800 MISSISSIPPI RIVER ONCE THRU
- 32. COMMONWEALTH EDISDN QUAD CITIES 2 05000265 BWR 0800 MISSISSIPPI RIVER ONCE THRU
- 33. COMMONWEALTH EDISON ZION 1 05000295 PWR 1040 LAKE MICHIGAN ONCE THRU
- 34. COMMONWEALTH EDISON ZION 2 05000304 PWR 1040 LAKE MICHIGAN ONCE THRU
- 35. CONNECTICUT YANKEE ATOMIC POWER HADDAM HECK 05000213 PWR 0575 CONNECTICUT RIVER ONCE THRU
- 36. CONSOLIDATED EDISON INDIAN POINT 1 05000003 PWR 0265 HUDSON RIVER ONCE THRU
- 37. CONSOLIDATED EDISON INDIAN POINT 2 05000247 PWR 0873 HUDSON RIVER ONCE THRU
- 38. CONSOLIDATED EDISON INDIAN POINT 3 05000286 PWR 0965 HUDSON RIVER ONCE THRU
- 39. CONSUMERS POWER BIG ROCK PGINT 1 05000155 BWR 0075 LAKE MICHIGAN ONCE THRU
- 40. CONSUMERS POWER MIDLAND 1 05000329 PWR 0458 TITTABAWASSEE RIVER CLOSED CYCLE
- 41. CONSUMERS POWER MIDLAND 2 05000330 PWR 0808 TITTABAWASSEE *.IVER CLOSED CYCLE
- 42. CONSUMERS POWER PALISADES 05000255 PWR 0700 LAKE MICHIGAN COOLING TOWERS
- 43. DAIRYLAND POWER LA CRO?SE 05000409 BWR 0050 MISSISSIPPI RIVER ONCE THRU
- 45. DUKE POWER CATAWBA 1 05000413 PWR 1153 LAKE WYLIE HNDCT
- 46. DUKE POWER CATAWBA ?
05000414 PWR 1153 LAKE WYLIE HNECT
- 47. DUKE POWER CHEROKEE 1 05000491 PWR 1280 BROAD RIVER CLOSED CYCLE
- 48. DUKE POWER CHEROKEE 2 05000492 PWR 1280 BROAD RIVER CLOSED CYCLE
- 49. DUKE POWER CHEROKEE 3 05000493 PWR 1280 BROAD RIVER CLOSED CYCLE
- 50. DUKE POWER MCGUIRE 1 05000369 PWR 1180 LAKE NORMAN ONCE THRU St. DUKE POWER MCGUIRE 2 05000370 PWR 1180 LAKE NORMAN ONCE THRU
- 52. DUKE POWER OCONEE 1 05000269 PWR 0871 LAKE KEDWEE ONCE THRU
- 53. DUKE POWER OCONEE 2 05000270 PWR 0871 LAKE KE0 WEE ONCE THRU
- 54. DUKE POWER OCONEE 3 05000287 PWR 0871 LAKE KE0 WEE ONCE THRU 98e
INDEX TO REACTORS BY UTIUTY OWNER g
COOLING UTILITY REACTOR DOCKET TYPE MWe COOLING SOURCE METHOD
- 55. DUKE POWER PERKINS 1 05000488 PWR 1280 YADKIN RIVER CLOSED CYCLE
- 56. DUKE '0WER PERKINS 2 05000489 PWR 1280 YADKIN RIVER CLOSED CYCLE
- 57. DUKE POWER PERKINS 3 05000490 PWR 1280 YADKIN RIVER CLOSED CYCLE
- 59. DUQUESHE LIGHT BEAVER VALLEY 2 05000412 PWR 0852 CHIO RIVER HNDCT
- 60. FLORIDA POWER 8 LIGHT ST LUCIE 1 05000335 PWR 0907 ATLANTIC OCEAN ONCE THRU
- 61. FLORIDA POWER 8 LIGHT ST LUCIE 2 05000389 PWR 0810 ATLANTIC OCEAN ONCE THRU
- 65. GEORGIA POWER HATCH 1 05000321 BWR 0786 ALTAMAHA RIVER COOLING TOWER
- 66. GEORGIA POWER HATCH 2 05000366 BWR 0795 ALTAMAHA RIVER COOLING TOWER
- 69. GULF STATES UTILITIES RIVER BEND 1 05000458 BUR 0934 MISSISSIPPI RIVER MDCT
- 70. GULF STATES UTILITIES RIVER BEND 2 05000459 BWR 0934 MISSISSIPPI RIVER MDCT
- 71. HOUSTON LIGHTINC 8 POWER ALLENS CREEK 1 05000466 BWR 1150 BRAZDS RIVER LAKE POND
- 74. ILLINDIS POWER CLINTON 1 05000461 BWR 0933 SALT CREEK ONCE THRU
- 75. ILLINDIS POWER CLINTON 2 05000462 BWR 0933 SALT CREEK ONCE THRU
- 76. INDIANA 8 MICHIGAN ELECTRIC COOK 1 05000315 PWR 1060 LAKE MICHIGAN ONCE THRU
- 77. INDIANA 8 MICHIGAN ELECTRIC COOK 2 05000316 PWR 1060 LAKE MICHIGAN ONCE THRU
- 79. JERSEY CENTRAL POWER 8 LIGHT FORKED RIVER 05000363 PWR 1070 ONCE THRU
- 80. JERSEY CENTRAL POWER & LIGHT OYSTER CREEK 1 05000219 BWR 0640 BARNEGAT BAY ONCE THRU 81 KANSAS GAS 8 ELECTRIC WOLF CREEK 1 05000482 PWR 1150 COOLING LAKE
- 82. LONG ISLAND LIGHTING JAMESPORT 1 05000516 PWR 1150 LONG ISLAND SOUND ONCE THRU
- 83. LONG ISLAND LIGHTING JAMESPORT 2 05000517 PWR 1150 LONG ISLAND SOUND ONCE THRU
- 84. LONG ISLAND LIGHTING SHOREHAM 05000322 BWR 0819 LONG ISLAND SOUND ONCE THRU
- 85. LOUISIANA POWER 8 LIGHT WATERFORD 3 05000382 PWR 1113 MISSISSIPPI RIVER ONCE THRU
- 87. METROPOLITAN EDISDN THREE MILE ISLAND 1 05000289 PWR 0819 SUSQUEHANNA RIVER CC.HNDCT
- 88. METROPOLITAN EDISON THREE MILE ISLAND 2 0500032G PWR 0906 SUSQUEHANNA RIVER CC.HNDCT
- 89. MISSISSIPPI POWER 8 LIGHT GRAND GULF 1 05000416 BWR 1250 MISSISSIPPI RIVER CCHNDCT
- 90. MISSISSIPPI POWER 8 LIGHT GRAND GULF 2 05000417 BWR 1250 MISSISSIPPI RIVER CCHNDP' 91 NEBRASKA PUBLIC POWER DISTRICT COOPER STATION 05000298 BWR 0778 MISSOURI RIVER ONCE s
- 92. NY STATE ELECTRIC 8 GAS CO.
NEW HAVEN 1 05000596 PWR 1250 UNKNOWN
- 93. NY STATE ELECTRIC 8 GAS CO.
NEW HAVEN 2 05000597 PWR 1250 UNKNOWN 94, NIAGARA MOHAWK POWER HINE MILE POINT 1 05000220 BWR 0610 LAKE ONTARIO ONCE THRU 95, HIAGARA MOHAWK POWER HINE MILE POINT 2 05000410 BWR 1080 LAKE ONTARIO ONCE THRU
- 96. NORTHEAST NUCLEAR ENERGY MILLSTONE 1 05000245 BWR 0652 LONG ISLAND SOUND ONCE THRU
- 97. NORTHEAST NUCLEAR ENERGY MILLSTONE 2 05000336 PWR 0828 LONG ISLAND SOUND ONCE THRU
- 98. NORTHEAST NUCLEAR ENERGY MILLSTONE 3 05000423 FWR 1156 NIANTIC BAY ONCE THRU
- 99. HORTHEAST NUCLEAR ENERGY MONTAGUE 1 05000496 BWR 1150 CONNECTICUT RIVER CLSD LP CL TWR 400. NORTHEAST NUCLEAR ENERGY MONTAGUE 2 05000497 BWR 1150 CONNECTICUT RIVER CLSD LP CL TWR 40 1 NORTHERN INDIANA PUBLIC SERVICE BAILLY 1 05000367 BWR 0645 LAKE MICHIGAN CC.HNDCT 102. NORTHERN STATES POWER MONTICELLO 05000263 BWR 0545 MISSISSIPPI RIVER VC. MDCT 103. NORTHERN STATES POWER PRAIRIE ISLAND 1 05000282 PWR 0530 MISSISSIPPI RIVER COOLING TOWERS 104. NORTHERN STATES POWER PRAIRIE ISLAND 2 05000306 PWR 0530 MISSISSIPPI RIVER COOLING TOWERS 105. OMAHA PUBLIC POWER DISTRICT FORT Cath 0VN 1 05000285 PWR 0457 MISSOURI RIVER ONCE THRU 106. PACIFIC GAS 8 ELECTRIC DIABLO CANYON 1 05000275 PWR 1084 PACIFIC OCEAN ONCE THRU 107. PACIFIC GAS 8 ELECTRIC DIABLO CANYON 2 05000323 PWR 1106 PACIFIC OCEAN ONCE THRU 108. PACIFIC GAS 8 ELECTRIC HUMBOLDT BAY 05000133 BWR 0065 PACIFIC OCEAN ONCE THRU 1
INDEX TO REACTORS BY UTILITY OWNER UTILITY REACTOR DOCKET TYPE MWe COOLING >OURCE COOLING METHOD 109 PENNSYLVANIA POWER 8 LIGHT SUSQUEHANNA 1 05000387 BWR 1050 SUSQUEHANNA RIVER CC.HNDCT 110. PENHSYLVANIA POWER 8 LIGHT SUSQUEHANNA 2 05000388 BWR 1058 SUSQUEHANNA RIVER CC,HNDCT 111. PHILADELPHIA ELECTRIC LIMERICK 1 05000352 BWR 10.. SCHUYLKILL RIVER CC HNDCT 112. PHILADELPHIA ELECTRIC LIMERICK 2 05000353 BWR 106'. SCHUY1 KILL RIVER CC HNDCT 113. PHILADELPHIA ELECTRIC PEACH BOTTOM 2 05000277 BWR 106S CONOWINGO POND VC.MDCT 114. PHILADELPHIA ELECTRIC PEACH BOTTOM 3 05000278 BWR 1065 CON 0WINGO POND VC.MDCT 115. PORTLAND GENERAL ELECTRIC PEBBLE SPRINGS 1 05000514 PWR 1260 COLUMBIA RIVER CLOSED POND 116. PORTLAND GENERAL ELECTRIC PEBBLE SPRINGS 2 05000515 PWR 1260 COLUMBI'A RIVER CLOSED POND 117. PORTLAND GENERAL ELECTRIC TROJAN 05000344 PWR 1130 COLUMBIA RIVER COOLING TOWERS 118. POWER AUTHORITY OF STATE OF N.Y.
FITZPATRICK 05000333 BWR 0521 LAKE ONTARIO CHCE THRU 119. PROJECT MANAGEMENT CORP./TVA CLINCH RIVER 05000537 LMFBR 0350 CLINCH RIVER 120. PUBLIC SERVICE GAS 8 ELECTRIC HOPE CREEK 1 05000354 BWR 1067 DELAWARE RIVER HDCT 121 PUBLIC SERVICE GAS 4 ELECTRIC HOPE CREEK 2 05000355 BWR 1067 DELAWARE RIVER NDCT 122. PUBLIC SERVICE GAS 8 ELECTRIC SALEM 1 05000274 PWR 1090 DELAWARE RIVER ONCE THRU 123. PUBLIC SERVICE GAS e ELECTRIC SALEM 2 05000311 PWR 1115 DELAWARE RIVER CHCE THRU 124. PUBLIC SERVICE OF COLORADO FORT ST VRAIN 05000267 HTGR 0330 50. PLATTE RIVEP CLOSED HELIUM 135. PUBLIC SERVICE OF INDIANA MARBLE HILL 1 05000546 PWR 1130 CHIO RIVER CMDCT 126. PUBLIC SERVICE OF INDIAHA MARBLE HILL 2 05000547 PWR 1130 OHIO RIVER CMDCT 127. PUBLIC SERVICE OF NEW HAMPSHIRE SEABROOK 1 05000443 PWR 1200 ATLANTIC OCEAN ONCE THRU 138. PUBLIC SERVICE OF NEW HAMPSHIRE SEABROOK 2 05000444 PWR 1200 A?LANTIC OCEAN ONCE THRU 129. PUBLIC SERVICE OF OKLAHOMA BLACK FOX 1 05000556 BWR 1150 VERIGRIS RIVER MECH DR CL TWR 130. PUBLIC SERVICE OF OKL AHOMA BLACK FOX 2 05000557 BWR 1150 VERIGRIS RIVER MECH DR CL TWR 131 PUGET SOUND POWER 8 LIGHT SKAGIT 1 05000522 BWR 1277 RANNEY COLLECTOR COOLING TOWERS 132. PUGET SOUND POWER 8 LIGHT SKAGIT 2 05000523 BWR 1277 RANHEY COLLECTOR COOLING TOWERS 133. ROCHESTER GAS 4 ELECTRIC GINNA 05000244 PWR 0490 LAKE ONTARIO ONCE THRU 134. ROCHESTER GAS 8 ELECTRIC STERLING t 05000485 PWR 1150 COOLING LAKE 135. SACRAMENTO MUN. UTIL. G4 STRICT RANCHO SECO 05000312 PWR 0913 FOLSON CANAL COOLING TOWERS 136. SOUTH CAROLINA ELECTRIC 8 GAS SUMMER 1 05000395 PWR 0900 MONTICELLO RESERVOIR ONCE THRU 137. SOUTHERN CALIFORNIA EDISON SAN ONOFRE 1 05000206 PWR 0430 PACIFIC OCEAN ONCE THRU 138. SOUTHERN CALIFORNIA EDISON SAN ONOFRE 2 05000361 PWR 1140 PACIFIC OCEAN ONCE THRU 139. SOUTHERN CALIFORNIA EDISON SAN ONOFRE 3 05000362 PWR 1140 PACIFIC OCEAN ONCE THRU 140. TENNESSEE VALLEY AUTHORITY BELLEFONTE 1 05000438 PWR 1213 GUNTERVILLE RES CCHNDCT 141 TENNESSEE VALLEY AUTHORITY BELLEFONTE 2 05000439 PWR 1213 GUNTHERVILLE RES CCHNDCT 102. TENNESSEE VALLEY AUTHORITY BROWNS FERRY 1 05000259 BWR 1067 TENNESSEE RIVER ONCE THRU 143. TENNESSEE VALLEY AUTHORITY BROWNS FERRY 2 05000260 BWR 1067 TENHESSEE RIVER ONCE THRU 144. TENNESSEE VALLEY AUTHORITY BROWNS FERRY 3 05000296 BWR 1067 TENNESSEE RIVER ONCE THRU 145. TENHESSEE VALLEY AUTHORITY HARTSVILLE 1 05000518 BWR 1233 COOLING TOWERS CCHDCT 146. TENHESSEE VALLEY AUTHORITY HARTSVILLE 2 05000519 BWR 1233 COOLING TOWERS CCHDCT 147. TENNESSEE VALLEY AUTHORITY HARTSVILLE 3 05000520 BWR 1253 COOLING TOWERS CCHDCT I48. TENNESSEE VALLEY AUTHORITY HARTSVILLE 4 05000521 BWR 1233 COOLING TOWERS CCHDCT I49. TENNESSEE VALLEY AUTHORITY PHIPPS BEND 1 05000553 BWR 1233 HOLSTON RIVER 150. TENNESSEE VALLEY AUTHORITY PHIPPS BEND 2 05000554 BWR 1233 HOLSTON RIVER 151 TENNESSEE VALLEY AUTHORITY SEQUOYAH 1 05000327 PWR 1148 CHICKAMAUGA LAKE OHCE THRU 152. TEH.1ESSEE VALLEY AUTHORITY SEQUDYAH 2 05000328 PWR 1948 CHICKAMAUGA LAKE ONCE THRU 153. TENNESSEE VALLEY AUTHORITY WATTS BAR 1 05000390 PWR 1177 TENNES EE RIVER CC,HNDCT 154. TENNESSEE VALLEY AUTHORITY WATTS BAR 2 05000391 PWR 1177 TENNESSEE RIVER CC.HNDCT 155. TENNESSEE VALLEY AUTHORITY YELLOW CREEK 1 05000566 PWR 1300 YELLOW CRK EMBAY.
MDCT 156. TEHNESSEE VALLEY AUTHORITY YELLOW CREEK 2 05000567 PWR 1300 YELLOW CRK EMBAY.
MDCT 157. TEXAS UTILITIES GENERATING COMANCHE PEAK 1 05000445 PWR 1150 SQUAW CREEK RES CC ART 158. TEXAS UTILITIES GENERATING COMANCHE PEAK 2 05000446 PWR 1150 SQUAW CREEK RES CC ART 159. TOLEDO EDISON DAVIS-BESSE 1 05000346 PWR 0906 LAKE ERIE HBDCT 160. UNION ELECTRIC CALLAWAY 1 05000483 PWR 1120 COOLING POND 161. UNION ELECTRIC CALLAWAY 2 05000486 PWR 1120 COOLING POND 162. VERMONT YANKEE NUCLEAR POWER VERMONT YANKEE 1 05000271 BWR 0514 CONNECTICUT RIVER CC CT p
d
INDEX TO REACTORS BY UTILITY 0WNER on UTILITY REACTOR DOCKET TYPE MWe COOLING SOURCE COOLING METHOD 163. VIRGINI A ELECTRIC & POWER NORTH ANNA 1 05000338 PWR 0907 LAKE ANNA DNCE THRU 164. VIRGINI A ELECTRIC 8 POWER NORTH ANNA 2 05000339 PWR 0907 LAKE ANNA ONCE THRU 165. VIRGINI A ELECTRIC 8 POWER NORTH ANNA 3 05000404 PWR 0907 LAKE ANNA ONCE THRU
'166. VIRGINI A ELECTRIC 8 POWER NORTH ANNA 4 05000405 PWR 0907 LAKE ANNA ONCE THRU 167. VIRGINI A ELECTRIC 8 POWER SURRY 1 05000280 PWR 0788 JAMES RIVER ONCE THRU 168. VIRGINI A ELECTRIC 8 POWER CO.
SURRY 2 05000281 PWR 0788 JAMES RIVER ONCE THRU 169. WASHINGTON P.P.S.S.
WASHINGTON NUCLEAR 1 05000460 PWR 1218 COLUMBIA RIVER ONCE THRU 170. WASHINGTON P.P.S.S.
WASHINGTON NUCLEAR 2 05000397 BWR 1103 MECHANICAL TOWERS C00 LING TOWERS 171. WASHINGTON P.P.S.S.
WASHINGTON NUCLEAR 3 05000508 PWR 1242 CHEHALIS RIVER NATURAL DRAFT 172. W ASHINGTON P. P. S.S.
WASHINGTON NUCLEAR 4 05000513 PWR 1218 COLUMBIA RIVER ONCE THRU 173. WASHINGTON P.P.S.S.
WASHINGTON NUCLEAR 5 05000509 PWR 1242 CHEHALIS RIVER NATURAL DRAFT 174. WISCONSIN PUBLIC SERVICE KEWAUNEE 05000305 PWR 0541 LAKE MICHIGAN ONCE THRU 175. WISCONSIN-MICHIGAN ELECTRIC POINT BEACH 1 05000266 PWR 0497 LAKE MICHIGAN ONCE THRU 176. WISCONSIN-MICHIGAN ELECTRIC POINT BEACH 2 05000301 PWR 0497 LAKE MICHIGAN ONCE THRU 177. YANKEE ATOMIC ELECTRIC YANKEE-ROWE 1 05000029 PWR 0175 DEERFIELD RIVER ONCE THRU CC HNDCT = Closed cycle hyperbolic natural draft cooling tower CC
= Closed cycle MDCT
= Mechanical draft cooling tower NDCT
= Natural draft cooling tower VCMDCT = Variable cycle mechanical draft cooling tower l
AGREEMENT STATES 6 xx ASHINGTON l
MINNESOTA MONTANA ORTH DAKOTA N
1 NH
, OREGON h
(
MASS I
NEW YORK IDAHO SOUTH DAKOTA gR WYOMING g
PENNSYLVANIA ASKA OHIO MD DEL NEVADA ILLINOIS INDIANA COLORADO VIRGINIA MISSOURI KENTUCKY CALIFORNLA PUERTO RICO WASHINGTON D.C.
i NORTH CAROLINA TENNESSEE dO OKtAHOMA
\\
sOUTHg art 2ONA NEW MEXICO MISSIS $1PP GEORGIA o
HAWAll EXAS nag
/
ALASKA h\\\\\\\\h\\\\3 AGREEMENT STATES
's e 1
NON-AGREEMENT STATES PANAMA CANAL NRC AGREEMENT STATES:
ZONE ALABAMA FLORIDA LOUISLANA NEW HAMPSHIRE OREGON WASHINGTON ARIZONA GEORGIA MARYLAND NEW MEXICO RHODE ISLAND go ARKANSAS IDAHO MISSISSIPPI NEW YORK SOUTH CAROUNA g
CAUFORNIA KANSAS NEBRASKA NORTH CAROUNA TENNESSEE COLORADO KENTUCKY NEVADA NORTH DAKOTA TEXAS
BROWN BOOK DISTRIBUTION I
l i
l COMMISSION (9)
OFFICE OF THE SECRETARY (4)
OFFICE OF THE EXECUTIVE DIRECTOR FOR OPER ATION (4)
OFFICE OF ADMINISTRATION (9)
OFFICE OF CONGRESSIONAL AFFAIRS (8)
OFFICE OF THE CONTROLLER (10)
[
OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (11)
OFFICL OF INSPECTION AND ENFORCEMENT (10)
OFFICE OF INSPECTOR AND AUDITOR (3)
OFFICE OF INTERNATIONAL PROGRAMS (1)
OFFICE 01-MANAGEMENT AND PROGRAM ANALYSIS (18) (EXTRA: 26)
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS (25)
OFFICE OF NUCLEAR REGULATORY RESEARCH (8).
OFFICE OF NUCLEAR REACTOR REGULATION (55)
OFFICE OF POLICY EVALUATION (31 OFFICE OF PUBLIC AFFAIRS (2)
OFFICE OF STANDARDS DEVELOPMENT (22)
OFFICE OF STATE PROGRAMS (5)
NRC REGIONS (14)
ATOMIC SAFETY AND LICENSING SAFEGUARDS (4)
DEPARTMENT OF ENERGY (14)
ENVIRONMENTAL PROTECTION AGENCY (2)
PUBLIC DOCUMENT ROOM (4)
SUBCOMMITTEE ON NUCLEAR REGULATION (8)
OFFICE OF MANAGEMENT AND BUDGET (1)
DEPARTMENT OF LABOR (1)
OTHER (20)
TOTAL DISTRIBUTION: 310'
..