Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML100491535 + (Probabilistic Risk Assessment Individual Plant Examination Summary Report)
- 05000315/FIN-2015004-02 + (Probabilistic Risk Assessment Model Errors)
- ML20054H624 + (Probabilistic Risk Assessment Program Plan)
- ML080280137 + (Probabilistic Risk Assessment Quality Requirements for Risk-informed Inservice Inspection (ISI))
- ML19345C794 + (Probabilistic Risk Assessment of Automatic Recirculation Pump Trip)
- ML20072K717 + (Probabilistic Risk Assessment of Effects of Postulated Events w/360 Degree Shroud Through-Wall Crack)
- ML20054E969 + (Probabilistic Risk Assessment, Rev 4)
- ML20064K625 + (Probabilistic Risk Assessment, Vol 1)
- ML20064K630 + (Probabilistic Risk Assessment, Vol 2)
- ML20030B069 + (Probabilistic Risk Assessment, Vols 1 & 2 for Limerick)
- ML20041B949 + (Probabilistic Risk Assessment:Limerick Generating Station, Philadelphia Electric Co, Vols I & II)
- ML20086K829 + (Probabilistic Safety Analysis Procedures Guide)
- ML20135B422 + (Probabilistic Safety Analysis Procedures Guide.Sections 8-12)
- ML20135B395 + (Probabilistic Safety Analysis Procedures Guide.Sections 1-7 and Appendices)
- ML19241C169 + (Probabilistic Safety Analysis for Solidified High Level Nuclear Waste Mgt Sys)
- ML032380383 + (Probabilistic Safety Assessment Branch Input to Safety Evaluation Regarding License Amendment Request for Arkansas Nuclear One, Unit 2, to Extend the Allowed Outage Time for a Single Inoperable LOW Pressure Safety Injection (LPSI) Train Fro)
- ML20132G888 + (Probabilistic Safety Assessment Update 1996,Summary Document)
- ML042860095 + (Probabilistic Safety Assessment, Summary Report)
- ML042860080 + (Probabilistic Safety Assessment, Summary Report)
- ML042860100 + (Probabilistic Safety Assessment, Summary Report)
- ML20076B178 + (Probabilistic Safety Assessment,Phase I: Preliminary Risk Model Development)
- L-05-104, Probabilistic Safety Review for License Amendment Request Nos. 302 and 173 + (Probabilistic Safety Review for License Amendment Request Nos. 302 and 173)
- ML20140H307 + (Probabilistic Safety Study Applications Program for Inspection of Indian Point Unit 3 Nuclear Power Plant)
- ML20101S454 + (Probabilistic Safety Study Shutdown Modes 4,5 & 6 Vol 1)
- ML20199L073 + (Probabilistic Safety Study,Northeast Util Svc Company Evaluation of Probabilistic Safety Study Results)
- ML17331A910 + (Probabilistic Seismic Hazard Analysis, Final Rept)
- ML17348B007 + (Probabilistic Seismic Hazard Evaluation & Uniform Hazard Spectra for St Lucie & Turkey Point Nuclear Power Plant Sites)
- ML20086P498 + (Probabilistic Seismic Resistance of Steel Containments)
- ML19309G229 + (Probability Analysis for Combined Surface Rupture Offset & Vibratory Ground Motion, Prepared for GE)
- ML19309B446 + (Probability Analysis of Surface Rupture Offset Beneath Getr Reactor Bldg)
- ML19274E698 + (Probability Analysis of Surface Rupture Offset Beneath Reactor Bldg,Getr)
- ML20154S432 + (Probability Based Load Combination Criteria for Design of Shear Wall Structures)
- ML20135B353 + (Probability Based Load Combination Criteria for Design of Concrete Containment Structures)
- ML20023B036 + (Probability Based Load Combination for Design of Category I Structures, Progress Rept)
- ML19347E809 + (Probability Based Load Criteria for the Design of Nuclear Structures:A Critical Review of the STATE-OF-THE-ART)
- ML20084Q919 + (Probability Based Safety Checking of Nuclear Plant Structures)
- ML20073M475 + (Probability Estimate of Temp Extremes for Seabrook,Nh)
- ML19310A645 + (Probability Estimates of Temp Extremes for Contiguous Us)
- ML20147H631 + (Probability Evaluation for Dynamic Response Combinations)
- ML20079G850 + (Probability and Consequences of Misloading Fuel in a PWR)
- ML20102A778 + (Probability and Consequences of Rapid Boron Dilution in a Pwr.A Scoping Study)
- ML20011A167 + (Probability of Containment Failure Due to Steam Explosions Following a Postulated Core Meltdown in an LWR)
- ML19242B610 + (Probability of Detecting Planar Defects in Heavy Wall Welds by Ultrasonic Techniques According to Existing Codes)
- ML20078P155 + (Probability of Detection by Bobbin Insp)
- ML20078G835 + (Probability of Detection by Bobbin Insp)
- ML20138P267 + (Probability of Disk Cracking Due to Stress Corrosion)
- ML20138B898 + (Probability of Disk Cracking Due to Stress Corrosion: Grand Gulf Unit 1)
- ML20053A571 + (Probability of Exceeding OBE Horizontal Design Response Spectrum,Midland Plant - Units 1 & 2)
- ML20246P746 + (Probability of Failure in BWR Reactor Coolant Piping.Pipe Failure Induced by Crack Growth and Failure of Intermediate Supports)
- ML20215F918 + (Probability of Failure in BWR Reactor Coolant Piping.Volume 3: Probabilistic Treatment of Stress Corrosion Cracking in 304 and 316NG Stainless Steel BWR Piping Weldments)
- ML20246P912 + (Probability of Failure in BWR Reactor Coolant Piping.Summary Report)