- LIC-11-0090, Post-Flooding Recovery Action Plan + (Post-Flooding Recovery Action Plan)
- LIC-11-0095, Post-Flooding Recovery Action Plan, Revision 1 + (Post-Flooding Recovery Action Plan, Revision 1)
- LIC-11-0092, Post-Flooding Security Recovery Action Plan + (Post-Flooding Security Recovery Action Plan)
- ML13081A759 + (Post-Hearing Findings of Fact and Conclusions of Law Supporting Contention EC-3A Regarding Environment Justice)
- ML19325C147 + (Post-Implementation Audit Rept for CP&L Brunswick Steam Electric Plant Units 1 & 2 SPDS 890515-18)
- ML20236C860 + (Post-Implementation Audit Rept for Fermi-2,SPDS)
- ML20245A432 + (Post-Implementation Audit Rept for South Carolina Electric & Gas Co Virgil C Summer Nuclear Station Spds)
- ML20214J447 + (Post-Implementation Audit Rept for Yankee Atomic Electric Co,Yankee Rowe Nuclear Power Plant,Spds, Technical Evaluation Rept)
- ML072420248 + (Post-Investigation ADR Program, Alternative Dispute Resolution)
- ML19296D283 + (Post-Irradiation Data Analysis for Nrc/Pnl Halden Assembly IFA-431)
- ML20079G536 + (Post-Irradiation Evaluation of Reactor Vessel Surveillance Capsule W-97)
- ML20112F945 + (Post-Irradiation Exam & Evaluation of Fort St Vrain Fuel Element 1-2415)
- ML20137S873 + (Post-Irradiation Exam of Fort St Vrain Cracked Fuel Element Sn 1-2415)
- ML20055A817 + (Post-Irradiation Exams Planned for Pbf Severe Fuel Damage Tests, Technical Rept)
- ML19344A489 + (Post-Irradiation Iodine Release from U Dioxide at Ambient Temp, Experiment Data Rept)
- ML103200148 + (Post-LOCA Boric Acid Precipitation Control Analysis - Response to RAI 15.3.1 - 1.a)
- ML20137G182 + (Post-LOCA Boron Concentration Mgt)
- ML20203K152 + (Post-LOCA Boron Concentration Mgt for CR-3)
- ML20217G699 + (Post-LOCA Boron Concentration Mgt for CR-3)
- ML020310427 + (Post-LOCA Containment Hydrogen Monitoring)
- ML13311A482 + (Post-LOCA Cooldown & Depressurization, Revision 0)
- ML042740509 + (Post-LOCA Eab, LPZ, & CR Doses - Alternative Source Term (AST))
- RNP-RA/16-0021, Post-License Examination Documentation - Follow-up + (Post-License Examination Documentation - Follow-up)
- ML080230308 + (Post-Loss of Cooling Accident Long Term Cooling Models)
- ML080220253 + (Post-Loss of Cooling Accident Long-Term Cooling Models)
- ML20137P830 + (Post-Maint Testing)
- 05000461/FIN-2015002-02 + (Post-Maintenance Test Failed To Demonstrate Required Flow Through RCIC Room Cooler)
- 05000266/FIN-2012002-02 + (Post-Maintenance Test On Main Feedwater Regulating Valve AMSAC Switches Deferred To Later Date)
- 05000373/FIN-2018001-01 + (Post-Maintenance Testing Failed to Demonstrate Testable Check Valve Function)
- LR-N11-0001, Post-NRC Inspection Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (Post-NRC Inspection Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML110400201 + (Post-NRC Inspection Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML19322E595 + (Post-Operational Ecological Monitoring Program,Annual Rept 1979, Vol I,Part 1)
- ML20080G499 + (Post-Operational Ecological Monitoring Program Crystal River Units 1,2 & 3 1977 - 1981, Summary Rept)
- ML19322E596 + (Post-Operational Ecological Monitoring Program,Annual Rept 1979, Vol I,Part 2)
- ML19322E599 + (Post-Operational Ecological Monitoring Program,Annual Rept 1979, Vol II)
- ML19270G690 + (Post-Operational Rept 11 on Ecology of Conowingo Pond for Jul-Dec 1978)
- ML19210D689 + (Post-Operational Rept 12 on Ecology of Conowingo,Pond,Jan- June 1979, Prepared for Philadelphia Electric Co)
- ML19343B757 + (Post-Operational Rept 13 on Ecology of Conowingo Pond, Jul-Dec 1979)
- ML19343B758 + (Post-Operational Rept 14 on Ecology of Conowingo Pond, Jan-Apr 1980)
- U-604792, Post-Outage 120-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 120-Day Inservice Inspection (ISI) Summary Report)
- RA14-018, Post-Outage 90-Day Inservice (ISI) Summary Report + (Post-Outage 90-Day Inservice (ISI) Summary Report)
- ML14031A222 + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA16-020, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA15-028, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA15-035, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA13-023, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA12-018, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA10-023, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA09-041, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA07-045, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)
- RA08-035, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report + (Post-Outage 90-Day Inservice Inspection (ISI) Summary Report)