Text
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390, UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS DECONTROLLED Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 August 10, 2011 LI C-11-0092 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
References:
- 1. Docket No. 50-285
- 2. Nuclear Regulatory Commission Public Meeting, July 27,2011
- 3. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk) dated August 10, 2011 (LlC-11-0090)
SUBJECT:
Fort Calhoun Station Post-Flooding Security Recovery Action Plan Due to Missouri river flooding, Fort Calhoun Station (FCS) entered a Notice of Unusual Event (NOUE) on June 6, 2011, as required by station procedures. Since April 9, 2011, FCS has been shutdown for a refueling outage and will remain shutdown until the Missouri river recedes to a safe level and site conditions allow for restart.
In the Reference 2 public meeting, OPPD provided information concerning current FCS site conditions, flooding action levels, on-going flood response, post-flooding recovery actions, and the OPPD commitment to safety. Additionally, in the Reference 2 meeting, OPPD committed to submit a detailed FCS flooding recovery action plan.
The attached FCS post-flooding recovery action plan provides for extensive reviews of plant systems, structures, and components (SSCs) to assess the impact of the flood waters.
OPPD understands that selected actions in the attached plan will be included in a Confirmatory Action Letter (CAL) that must be satisfactorily completed prior to FCS plant restart. Therefore, this letter contains no commitments; the commitments will be described in the CAL.
OPPD is committed to the safe operation of FCS and will not ascend in mode without concurrence from the NRC that applicable commitments have been satisfied. The attached Security FCS flooding recovery action plan is intended to be a living document and will be updated and re-submitted periodically as necessary.
The material enclosed herewith is exempt from public disclosure in accordance with 10 CFR 2.390 and its disclosure to unauthorized individuals could present a security vulnerability.
~
~I, ffrey A. Reinhart
~te Vice President Enclosure Employment with Equal Opportunity