Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 44975 + (Possible Overexposure During the Second Quarter of 2008)
- ENS 43508 + (Possible Overexposure Event During Radiography in Gulf of Mexico)
- ENS 56427 + (Possible Overexposure of Radiographer)
- ENS 56492 + (Possible Overexposure to Radiographer)
- ML20212E626 + (Possible Part 21 Rept Re 36-inch Rockwell Intl Globe Valves Used as Msivs.Initially Reported on 861218.Mfg May Not Have Accounted for Changes in Valve Operating Characteristics W/ Temp & Pressure.Determination of Reportability Underway)
- ML20054C184 + (Possible Part 21 Rept Re Quantity of Two Conductor Shielded Instrumentation Cables Shipped to Facilities.Cable Contained Points of Deformation in Conductor Insulation Causing Wall Thickness to Be Below Tech Specs.Cable Returned)
- ENS 41099 + (Possible Personnel Overexposure)
- ENS 48040 + (Possible Personnel Overexposure Greater than 25 Rem)
- ML20148G662 + (Possible Questions for Executive Branch at Commission Briefing)
- ML19242D160 + (Possible RO on 790730 Re Failure to Seismically Qualify or Check Electrical Handholes in Conduit Between Auxiliary Bldg & Pump Station for Flow & Stress During Probable Max Flood)
- ENS 43339 + (Possible Radiation Exposure Beyond Occupational Limits)
- ENS 40992 + (Possible Radiation Exposure from a Level Detection Device)
- ENS 45209 + (Possible Radiographer Overexposure)
- 05000416/FIN-2014007-01 + (Possible Spurious Actuation of The Safety Relief Valves During Control Room Fire Scenarios)
- Information Notice 1985-17, Possible Sticking of Asco Solenoid Valves + (Possible Sticking of Asco Solenoid Valves)
- Information Notice 1989-63, Possible Submergence of Electrical Circuits Located Above the Flood Level Because of Water Intrusion and Lack of Drainage + (Possible Submergence of Electrical Circuits Located Above the Flood Level Because of Water Intrusion and Lack of Drainage)
- Information Notice 1988-36, Possible Sudden Loss of RCS Inventory During Low Coolant Level Operation + (Possible Sudden Loss of RCS Inventory During Low Coolant Level Operation)
- ML18121A034 + (Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA)
- ML19323B942 + (Possible Version of NRC Statement on Safety of Nuclear Power Plants)
- ENS 44846 + (Possibly Inadequate Backup Nitrogen Supply for Atmospheric Dump Operation)
- ML15036A528 + (Post - Shutdown Decommissioning Activities Report)
- ML18298A118 + (Post 2.206 Petition email-request OEDO-17-00075 September 3, 2018)
- ML19274D690 + (Post 790116-17 Conference Order 2.Orders Submittal of New Interim Statements of Issues by 790309 After Consultation Re Common Format)
- ML20266E869 + (Post Accident CTMT Combustible Gas Ctr Sys P&ID)
- ML20266E334 + (Post Accident CTMT Combustible Gas Ctrl Sys P & Id)
- ML17250A578 + (Post Accident Charcoal Filter Dampers)
- ML20266D866 + (Post Accident Containment Venting and H2 Recombiner System Flow Diagram, as-built.Sheet 1 of 1)
- RA-22-0175, Post Accident Monitoring (PAM) Instrumentation Report + (Post Accident Monitoring (PAM) Instrumentation Report)
- RA-23-0096, Post Accident Monitoring (PAM) Instrumentation Report + (Post Accident Monitoring (PAM) Instrumentation Report)
- ML14024A602 + (Post Accident Monitoring (PAM) Report)
- ML13254A207 + (Post Accident Monitoring (PAM) Report)
- ML13002A052 + (Post Accident Monitoring (PAM) Report)
- ML12107A008 + (Post Accident Monitoring (PAM) Report)
- ML12020A238 + (Post Accident Monitoring (PAM) Report)
- ML101800173 + (Post Accident Monitoring (PAM) Report)
- ML091330232 + (Post Accident Monitoring (PAM) Report)
- ML19248B764 + (Post Accident Monitoring (PAM) Report)
- ML25351A278 + (Post Accident Monitoring (PAM) Report)
- NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 + (Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3)
- NL-16-083, Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3 + (Post Accident Monitoring (PAM) Report for an Inoperable Containment Area Radiation Monitor (R-26) High Range, Indian Point Unit Number 3)
- NL-17-025, Post Accident Monitoring (PAM) Report for an Inoperable Gross Failed Fuel Detector + (Post Accident Monitoring (PAM) Report for an Inoperable Gross Failed Fuel Detector)
- NL-14-151, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B + (Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B)
- ML091740231 + (Post Accident Monitoring (Pam) Report)
- NRC 2005-0129, Post Accident Monitoring Instrumentation Report + (Post Accident Monitoring Instrumentation Report)
- NRC 2005-0126, Post Accident Monitoring Instrumentation Report + (Post Accident Monitoring Instrumentation Report)
- ML052660232 + (Post Accident Monitoring Instrumentation Report)
- NRC 2005-0119, Post Accident Monitoring Instrumentation Report + (Post Accident Monitoring Instrumentation Report)
- ML24177A151 + (Post Accident Monitoring Instrumentation Report)
- ML26029A377 + (Post Accident Monitoring Instrumentation Report)
- ENS 49308 + (Post Accident Monitoring Instrumentation Power Supplies Potentially Degraded)
- ML061950391 + (Post Accident Monitoring Instrumentation Report: Division 2 of the Containment Monitoring System Inoperable)
- NLS2015027, Post Accident Monitoring Instrumentation 14-Day Report, Per Technical Specification Section 5.6.6 + (Post Accident Monitoring Instrumentation 14-Day Report, Per Technical Specification Section 5.6.6)
- ML20266E425 + (Post Accident Monitoring Panel AI-66A Annunciator Arrangement and Elementary Diagram. Sheet 5 of 5.No Rev Date)
- ML20266E405 + (Post Accident Monitoring Panel AI-66A Arrangement. Sheet 1 of 5)
- ML20266E401 + (Post Accident Monitoring Panel AI-66A Wiring Diagram. Sheet 3 of 5.Rev Date Illegible)
- ML20266E422 + (Post Accident Monitoring Panel AI-66A Wiring Diagram. Sheet 2 of 5.No Rev Date)
- ML20266E417 + (Post Accident Monitoring Panel AI-66B Annunciator Arrangement and Elementary Diagram. Sheet 5 of 5)
- ML20266E413 + (Post Accident Monitoring Panel AI-66B Arrangement. Sheet 1 of 5.No Rev Date)
- ML20266E410 + (Post Accident Monitoring Panel AI-66B Wiring Diagram. Sheet 3 of 5.Rev Date Illegible)