Browse wiki

Jump to navigation Jump to search
The following event description is based oThe following event description is based on information currently available. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS of under the reporting requirements of 10 CFR 50.73.</br>Palo Verde Nuclear Station declared all three Unit's atmospheric dump valves (ADV) inoperable at 1318 MST. The reason for the inoperability is the discovery by engineering personnel that the ADV backup nitrogen capacity, required to operate the valves to mitigate certain accident scenarios, was not adequate. </br>There are 4 ADVs (one on each steam line with two steam lines per steam generator) for each of the three units. Engineering review of a loss of offsite power event determined that the current nitrogen supply of 13.3 hours will not be adequate to get the plant to shutdown cooling entry conditions during a natural circulation asymmetric cooldown (i.e. Feedwater Line Break, Main Steam Line Break, and Steam Generator Tube Rupture). </br>Actions are in progress to restore the operability of the ADVs. If unsuccessful, all three units will be required by the Technical Specifications to be in Mode 3, Hot Shutdown, by 1918 MST on February 12, 2009.</br>The licensee notified the NRC Resident Inspector.</br> * * * RETRACTION FROM RAY BUZARD TO PETE SNYDER AT 1840 ON 2/12/09 * * * </br>This is a retraction of the condition reported in EN # 44846 on February 11, 2009 at 19:31 EST. Upon further review of the condition, engineering personnel have determined that the ADV nitrogen supply was adequate to mitigate the consequences of the postulated events and the ADVs were declared operable at 04:30 MST on February 12, 2009. Therefore, no reportable condition existed.</br>The licensee notified the NRC Resident Inspector. Notified R4DO (Miller).sident Inspector. Notified R4DO (Miller).  +
20:18:00, 11 February 2009  +
19:31:00, 11 February 2009  +
20:18:00, 11 February 2009  +
The following event description is based oThe following event description is based on information currently available. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS of under the reporting requirements of 10 CFR 50.73.</br>Palo Verde Nuclear Station declared all three Unit's atmospheric dump valves (ADV) inoperable at 1318 MST. The reason for the inoperability is the discovery by engineering personnel that the ADV backup nitrogen capacity, required to operate the valves to mitigate certain accident scenarios, was not adequate. </br>There are 4 ADVs (one on each steam line with two steam lines per steam generator) for each of the three units. Engineering review of a loss of offsite power event determined that the current nitrogen supply of 13.3 hours will not be adequate to get the plant to shutdown cooling entry conditions during a natural circulation asymmetric cooldown (i.e. Feedwater Line Break, Main Steam Line Break, and Steam Generator Tube Rupture). </br>Actions are in progress to restore the operability of the ADVs. If unsuccessful, all three units will be required by the Technical Specifications to be in Mode 3, Hot Shutdown, by 1918 MST on February 12, 2009.</br>The licensee notified the NRC Resident Inspector.</br> * * * RETRACTION FROM RAY BUZARD TO PETE SNYDER AT 1840 ON 2/12/09 * * * </br>This is a retraction of the condition reported in EN # 44846 on February 11, 2009 at 19:31 EST. Upon further review of the condition, engineering personnel have determined that the ADV nitrogen supply was adequate to mitigate the consequences of the postulated events and the ADVs were declared operable at 04:30 MST on February 12, 2009. Therefore, no reportable condition existed.</br>The licensee notified the NRC Resident Inspector. Notified R4DO (Miller).sident Inspector. Notified R4DO (Miller).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
3.472222e-5 d (8.333333e-4 hours, 4.960317e-6 weeks, 1.1415e-6 months)  +
00:00:00, 12 February 2009  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:12:41, 2 March 2018  +
19:31:00, 11 February 2009  +
false  +
-0.0325 d (-0.78 hours, -0.00464 weeks, -0.00107 months)  +
true  +
20:18:00, 11 February 2009  +
Possibly Inadequate Backup Nitrogen Supply for Atmospheric Dump Operation  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +, 2  +  and 3  +