Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247F902 + (Photograph Presentation Entitled, New Facilities at Hematite Plant 1989)
- ML18220A625 + (Photograph, Plate IIA-9, Aerial Photograph)
- ML103610416 + (Photographers Preface)
- ML121810241 + (Photographic Example of the Use of New Technology as Part of NFPA 805 Transition)
- ML19321A530 + (Photographs of Containment Recirculation Piping Check Valve, SI-159 Following Removal from Sys for Insp)
- ML102950594 + (Photographs of Excavation)
- ML061390386 + (Photographs of Greenwood Estate Circa 1966-1967)
- ML19332A056 + (Photographs of Main Reverse Faults Discovered at Facility in Area of Essential Svc Water Spray Pond)
- ML13246A362 + (Photographs of Pictures of Cables from Wolf Creek)
- ML110060675 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 6 of 14)
- ML110060677 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 4 of 14)
- ML110060732 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 9 of 14)
- ML110060742 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 11 of 14)
- ML110060738 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 10 of 14)
- ML110060666 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 2 of 14)
- ML110060668 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 3 of 14)
- ML110060674 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 5 of 14)
- ML110060727 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 8 of 14)
- ML110060663 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 1 of 14)
- ML110060724 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 7 of 14)
- ML110060761 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 12 of 14)
- ML110060755 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 12 of 14)
- ML110060749 + (Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 12 of 14)
- ML060570003 + (Photographs of the Surry Power Plant and Vicinity Cultural Resources Viewshed)
- ML061450130 + (Photographs, Exelon - Excavation Activities)
- ML102030169 + (Photos)
- ML19291C771 + (Photos 2345-71 Through 75 Showing Const Progress)
- ML062010490 + (Photos Taken on 05/04/2006 of View Looking Toward Pilgrim Station from Junction of Pricilla and White Horse Beaches)
- ML19322C334 + (Photos of TMI-2 Console & Vertical Panels)
- ML15183A009 + (Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191)
- ML102920484 + (Photos; Picture007.jpg, Pcture008.jpg, Picture009.jpg, Picture010.jpg, Picture014.jpg, Picture021 .Jpg, Picture022.jpg, Picture023.jpg)
- ML102920497 + (Photos; Picture021.jpg, Picture022.jpg, Picture023.jpg, Picture024.jpg, Picture025.jpg, Picture026.jpg, Picture027.jpg, Picture028.jpg, Picture029.jpg, Picture030.jpg, Picture031.jpg, Picture032.jpg, Picture033.jpg, Picture034.jpg, Picture0)
- ML20058J844 + (Physical & Chemical Aspects of Burial of Vitrified Radwastes in Geological Formations)
- 05000219/FIN-2013004-01 + (Physical Change To Security Feature Causes Flood Control Feature To Be Ineffective)
- ML23278A221 + (Physical Exhibit (Non-Public))
- ML23278A222 + (Physical Exhibit (Public))
- ML20079H599 + (Physical Fitness Training Reference Manual for Security Force Personnel at Fuel Cycle Facilities Possessing Formula Quantities of Special Nuclear Materials)
- Regulatory Guide 1.75 + (Physical Independence of Electric Systems)
- ML20080C807 + (Physical Modelling of Contaminant Concentrations at Control Room)
- ML20080C819 + (Physical Modelling of Contaminant Concentrations at Control Room:Apps)
- ML20024C510 + (Physical Plant Dimensions Summary Comparison)
- ML20044E673 + (Physical Properties of Concrete & Core Debris Mixtures: Program Plan & Test Matrix)
- ML20148J953 + (Physical Protec of Nuc Matl in Transit Proj Progress Rept for Sept 1978.Discusses Prog Staffing & Dev Re Convoy Analysis(Source),Conflict Analysis(Sabres Ii),Ears,Casualty Assessment(Sacem),Search & Recovery,Weapons Effects)
- IR 05000334/1987003 + (Physical Protection & Preoperational Security Program Insp Repts 50-334/87-03 & 50-412/87-05,respectively,on 870126-30. No Violations Noted.Major Area Inspected:Quality of Training Program for Security Personnel & Status of Implementation)
- ML19249C170 + (Physical Protection Equipment Study. Final Rept)
- IR 05000020/1985002 + (Physical Protection Insp Rept 50-020/85-02 on 850925.No Violation Noted.Major Areas Inspected:Implementation of Physical Security Plan)
- IR 05000170/1985002 + (Physical Protection Insp Rept 50-170/85-02 on 850422.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Low Strategic Significance)
- IR 05000184/1985002 + (Physical Protection Insp Rept 50-184/85-02 on 850423.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Moderate Strategic Significance)
- IR 05000264/1976001 + (Physical Protection Insp Rept 50-264/76-01 on 760115-16. Noncompliance Noted Re Communications & Access Control. Portions Withheld (Ref 10CFR2.790))
- IR 05000271/1985019 + (Physical Protection Insp Rept 50-271/85-19 on 850520-24. Violation Noted:Lack of Required Redundancy & Barrier Capability Not as Described in Security Plan.Portions Deleted (Ref 10CFR73.21))
- IR 05000334/1986026 + (Physical Protection Insp Rept 50-334/86-26 on 861015-17.No Violation Noted.Major Areas Inspected:Licensee Security Program Prior To,During & Immediately After Changing Security Force Contractor)