Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12283A244 + (Part 21 - Temperature Switch Potentially Shipped Without Set Screw)
- ENS 57836 + (Part 21 - Thermal Overload of Voltage Regulators)
- ENS 57753 + (Part 21 - Thermal Sleeve Defect)
- ENS 49932 + (Part 21 - Thomas and Betts Printed Circuit Boards)
- ML14113A370 + (Part 21 - Thomas and Betts Printed Circuit Boards)
- ENS 56178 + (Part 21 - Tioga Pipe Purchased and Supplied Unqualified Piping)
- ENS 43558 + (Part 21 - Two Commerical Grade Relays Contained Deficiencies)
- ENS 50635 + (Part 21 - Type 67 Afr Regulators with Improperly Dedicated Diaphragm Valve Seats)
- ML14337A093 + (Part 21 - Type 67 Afr Regulators with Improperly Dedicated Diaphragm Valve Seats)
- ENS 47537 + (Part 21 - Uf6 Accumulator Tank Had Through Wall Cracks That Caused Leakage)
- ENS 53246 + (Part 21 - Undersized Packing Glands in Certain Crane Gate Valves)
- ENS 54506 + (Part 21 - Unknown Tightness of Cam Thrust Lock Nut Assembly)
- ENS 49908 + (Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve)
- ML14210A010 + (Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve)
- ML14079A027 + (Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve)
- ML25178A801 + (Part 21 - Valcor Solenoid Valve Defect Identified, EN 57785)
- ENS 52537 + (Part 21 - Valve Assembly Nonconformance)
- ENS 54301 + (Part 21 - Valve Manufacture Acceptance Criteria)
- ENS 53422 + (Part 21 - Wear of Thermal Sleeve in Westinghouse Control Rod Drive Mechanisms)
- ENS 48797 + (Part 21 - Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections)
- ENS 55836 + (Part 21 - Westinghouse Actuator Full Voltage Reversing Contactors Deficency Report)
- ENS 51492 + (Part 21 - Westinghouse Type Kir-60 Current Transformer)
- ENS 48493 + (Part 21 - an Operating Mechanism Front Cover Failed During Licensee Receipt Inspection)
- ML12318A039 + (Part 21 - an Operating Mechanism Front Cover Failed During Licensee Receipt Inspection)
- ML20236J105 + (Part 21 30 Day Written Rept Re Refurbished DB-25 Circuit Breaker Returned W/Missing Pin in Operating Mechanism.Spare DB-25 Circuit Breaker Was Inspected,Tested & Installed to Restore B Service Water Pump to Service)
- AEP-NRC-2025-39, Part 21 30-day Notification + (Part 21 30-day Notification)
- ENS 40962 + (Part 21 60-Day Interim Notification: Narrow Range Water Level Instrument Level 3 Trip)
- ML12348A136 + (Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers)
- ML061360465 + (Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking)
- ML12271A314 + (Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculation Methodology)
- ML112240142 + (Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance)
- ML102700614 + (Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance)
- ML102460537 + (Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance)
- ML14072A328 + (Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV)
- ML12347A308 + (Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology)
- ML15169A007 + (Part 21 60-Day Interim Report Notification: Potential Failure of Electromatic Relief Valve Cutout Switch)
- ML12158A447 + (Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld)
- ML093290046 + (Part 21 Communication Involving Wartsila Type Sacm UD45 Emergency Diesel Generating Sets Big End Bearings Installed in the Us Nuclear Power Stations of Constellation Energy at Calvert Cliffs and Xcel Energy at Prairies Island)
- ML052000333 + (Part 21 Communication: Circuit Breaker Replacement Primary Bushings Not Tested to ANSI Standards)
- ML052910389 + (Part 21 Communication: Testing to ANSI Standards Complete on Circuit Breaker Replacement Primary Bushings)
- ENS 43166 + (Part 21 Concerning Material Verifications on High Pressure and Temperature Steam and Water Globe Valves)
- ENS 43378 + (Part 21 Defect - Brachytherapy Seeds Unable to Return to Transfer Device After Treatment)
- JSP-552-93, Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced + (Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced)
- U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram + (Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram)
- ML052140277 + (Part 21 Deficiency Report Re Framatome Anp Supplied Pressurizer Heaters with Internals Manufactured by Thermocoax. Initially Reported on 07/22/05)
- ML20072G288 + (Part 21 Deficiency Rept 80 Re Damaged Insulation on MCC Powers Co Shielded Multiconductor Cable on HVAC Control Panels.Also Reported by MCC Power)
- ML19296F260 + (Part 21 Deficiency Rept Re Defect in Control Room Sys, Supplied & Mfg by Ge.Caused by Manufacturer.Effort Initiated to Check All Panel Wiring Diagrams Against Actual Manufacturer Documentation)
- ML20080N970 + (Part 21 Deficiency Rept Re Defective ITT-Grinnell Hydraulic Snubbers.Initially Reported in 830928 Telcon.Deficient Snubber Valve Blocks Will Be Remachined & Snubbers Rebuilt)
- ML19296F570 + (Part 21 Deficiency Rept Re Defective Pipe Assemblies for Heat Removal Sys,Fabricated by Dravo Corp.Improper Substitution of Matl Discovered During Internal Audit of Mill Test Repts.Assemblies Returned for Refabrication)
- ML20003B787 + (Part 21 Deficiency Rept Re Defects in Rosemount Trip/Calibr Units & Pressure Transmitters,Initially Reported on 800328. GE &/Or Rosemount Will Replace Defective Switches in Model 510DU Trip Units.Transmitters Will Be Modified)
- ML20081J136 + (Part 21 Deficiency Rept Re Defects on Certain AKR-30 & 50 Low Voltage Power Circuit Breakers Mfg Between mid-1976 & Dec 1978.Breaker Bearing May Become Loose,Preventing Closure.Text of Notification Included)