Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072S893 + (PRA Evaluation of Population Dose Risk from Severe Accidents at San Onofre Nuclear Generating Station Units 2 & 3)
- ML20072S935 + (PRA Evaluation of Risk Impact of Proposed One-Time Exemption from Requirements of 10CFR50,App J for ILRT Testing at San Onofre Nuclear Generating Station Units 2 & 3)
- ML20063D330 + (PRA Evaluation of Tornado-Generated Missile Impact on SONGS 2/3 AFW Sys)
- ML20064J450 + (PRA Evaluation:Proposed Changes in Primary Cooling Water Tech Spec 3.7.3)
- ML20065P476 + (PRA Evaluation:Proposed Changes in Svc Water TS 3.7.4)
- ML20115B098 + (PRA IPE, Summary Rept)
- ML17348A960 + (PRA Individual Plant Exam Final Rept, Vols 1 & 2)
- ML20210K645 + (PRA Insights)
- ML21138A805 + (PRA Lessons from Ope Uiuc)
- 05000315/FIN-2015003-05 + (PRA Model Errors)
- ML20070U251 + (PRA Procedures Guide.A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
- ML20070U255 + (PRA Procedures Guide.A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
- ML20031G797 + (PRA Procedures Guide:(Review Draft) Guide to Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
- ML26006A147 + (PRA Realism Day 2 Updated Agenda)
- ML25272A200 + (PRA Realism Workshop -NRC All)
- ML25234A148 + (PRA Realism Workshop Agenda)
- ML25272A201 + (PRA Realism Workshop- Industry Combined)
- ML19080A041 + (PRA Reporting Requirement for 505 - February 2019)
- ML21154A176 + (PRA Reporting Requirement for 505 - February 2019)
- ML12159A103 + (PRA Requests for Additional Information, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition))
- ML20217E965 + (PRA Rev 2 Summary Rept. W/Disk)
- ML20209D547 + (PRA Review & Recommended Approach for Completion of Project, Status Rept as of 841101)
- ML20135H483 + (PRA Review Manual)
- ML030870737 + (PRA Update Project - Phase 2, Project Work Plan, Revision 0)
- ML18317A054 + (PRA Upgrade Definition (and Related Topics) Working Meeting - Pressurized Water Reactor Owners Group - Slides for 11/14/18 Public Meeting on Use of New Probabilistic Methods)
- ML21138A810 + (PRA and RIDM - UCLA)
- ML21138A779 + (PRA and RIDM INL Mev)
- ML21138A780 + (PRA and RIDM Mit)
- ML19309F616 + (PRA and RIDM Mit 2019-11-25 Rev. 1 Small)
- ML21138A781 + (PRA and RIDM NCSU)
- ML20293A370 + (PRA and Risk-Informed Decision Making at the NRC: Some Trends and Challenges (NCSU Lecture))
- ML20195B157 + (PRA and Risk-Informed Decision Making at the NRC: Some Trends and Challenges (Mev Lecture))
- ML20105A904 + (PRA for North Anna Power Station Svc Water Preservation Project,Part 1, Supplemental Rept)
- ML20094G157 + (PRA of Offsite Releases Initiated by Toxic Chemical Release, Final Rept)
- ML20153G209 + (PRA of Various Test Methods & Design Options Concerning Specific Containment Penetrations)
- ML13162A580 + (PRB Closed Meeting Notes - 05/29/12 Gunter Et Al. 2.206 Requesting Enforcement Action Against James A. Fitzpatrick Plant)
- ML13162A581 + (PRB Closed Meeting Notes - 07/19/12 Gunter Et Al. 2.206 Requesting Enforcement Action Against James A. Fitzpatrick Plant)
- ML12256A746 + (PRB Meeting with Saporito Petition Slides)
- ML20097B301 + (PRE- and POST-TEST Analysis of Lobi MOD2 Test ST-02 (BT-00) with RELAP5/MOD1 and MOD2 (Loss of Feed Water))
- PMNS20220955, PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg + (PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg)
- PMNS20230724, PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg + (PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg)
- ML23278A218 + (PRE-FILED Exhibits Cover Sheet Templates)
- ML19046A388 + (PRE-GI-018 Public Meeting Materials)
- ML18215A207 + (PRE-Remediation Data)
- ML20088A126 + (PRE-TEST Visual Examination and Crud Characterization of LWR Rods Used in the LONG-TERM,LOW-TEMPERATURE Whole Rod Test)
- ML20058F869 + (PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station)
- ML20129F601 + (PRESSURIZED-THERMAL-SHOCK Test of 6-IN.-THICK Pressure VESSELS.PTSE-1:Investigation of Warm Prestressing and Upper-Shelf Arrest)
- ML20148L446 + (PRESSURIZED-THERMAL-SHOCK Test of 6-INCH Thick Pressure VESSELS.PTSE-2:Investigation of Low Tearing Resistance and Warm Prestressing)
- ML20057E590 + (PRESSURIZED-WATER Reactor Internals Aging Degradation Study. Phase 1)
- ML20261M694 + (PRI Na Make-Up Pump B Discharge Line 4 Inches GCAA-81PPD- 0005 & 1 Inch GCAA-81PPD-0056 Fabrication Iso. Sheet 2)
- ML20261M691 + (PRI Na Make-Up Pump B Discharge Line 4 Inches GCAA-81PPD- 0005 & 1 Inch GCAA-81PPD-0056 Fabrication Iso. Sheet 1 of 2)