Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "PRA and RIDM - UCLA". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20072S893  + (PRA Evaluation of Population Dose Risk from Severe Accidents at San Onofre Nuclear Generating Station Units 2 & 3)
  • ML20072S935  + (PRA Evaluation of Risk Impact of Proposed One-Time Exemption from Requirements of 10CFR50,App J for ILRT Testing at San Onofre Nuclear Generating Station Units 2 & 3)
  • ML20063D330  + (PRA Evaluation of Tornado-Generated Missile Impact on SONGS 2/3 AFW Sys)
  • ML20064J450  + (PRA Evaluation:Proposed Changes in Primary Cooling Water Tech Spec 3.7.3)
  • ML20065P476  + (PRA Evaluation:Proposed Changes in Svc Water TS 3.7.4)
  • ML20115B098  + (PRA IPE, Summary Rept)
  • ML17348A960  + (PRA Individual Plant Exam Final Rept, Vols 1 & 2)
  • ML20210K645  + (PRA Insights)
  • ML21138A805  + (PRA Lessons from Ope Uiuc)
  • 05000315/FIN-2015003-05  + (PRA Model Errors)
  • ML20070U251  + (PRA Procedures Guide.A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
  • ML20070U255  + (PRA Procedures Guide.A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
  • ML20031G797  + (PRA Procedures Guide:(Review Draft) Guide to Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
  • ML26006A147  + (PRA Realism Day 2 Updated Agenda)
  • ML25272A200  + (PRA Realism Workshop -NRC All)
  • ML25234A148  + (PRA Realism Workshop Agenda)
  • ML25272A201  + (PRA Realism Workshop- Industry Combined)
  • ML19080A041  + (PRA Reporting Requirement for 505 - February 2019)
  • ML21154A176  + (PRA Reporting Requirement for 505 - February 2019)
  • ML12159A103  + (PRA Requests for Additional Information, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition))
  • ML20217E965  + (PRA Rev 2 Summary Rept. W/Disk)
  • ML20209D547  + (PRA Review & Recommended Approach for Completion of Project, Status Rept as of 841101)
  • ML20135H483  + (PRA Review Manual)
  • ML030870737  + (PRA Update Project - Phase 2, Project Work Plan, Revision 0)
  • ML18317A054  + (PRA Upgrade Definition (and Related Topics) Working Meeting - Pressurized Water Reactor Owners Group - Slides for 11/14/18 Public Meeting on Use of New Probabilistic Methods)
  • ML21138A779  + (PRA and RIDM INL Mev)
  • ML21138A780  + (PRA and RIDM Mit)
  • ML19309F616  + (PRA and RIDM Mit 2019-11-25 Rev. 1 Small)
  • ML21138A781  + (PRA and RIDM NCSU)
  • ML20293A370  + (PRA and Risk-Informed Decision Making at the NRC: Some Trends and Challenges (NCSU Lecture))
  • ML20195B157  + (PRA and Risk-Informed Decision Making at the NRC: Some Trends and Challenges (Mev Lecture))
  • ML20105A904  + (PRA for North Anna Power Station Svc Water Preservation Project,Part 1, Supplemental Rept)
  • ML20094G157  + (PRA of Offsite Releases Initiated by Toxic Chemical Release, Final Rept)
  • ML20153G209  + (PRA of Various Test Methods & Design Options Concerning Specific Containment Penetrations)
  • ML13162A580  + (PRB Closed Meeting Notes - 05/29/12 Gunter Et Al. 2.206 Requesting Enforcement Action Against James A. Fitzpatrick Plant)
  • ML13162A581  + (PRB Closed Meeting Notes - 07/19/12 Gunter Et Al. 2.206 Requesting Enforcement Action Against James A. Fitzpatrick Plant)
  • ML12256A746  + (PRB Meeting with Saporito Petition Slides)
  • ML20097B301  + (PRE- and POST-TEST Analysis of Lobi MOD2 Test ST-02 (BT-00) with RELAP5/MOD1 and MOD2 (Loss of Feed Water))
  • PMNS20220955, PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg  + (PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg)
  • PMNS20230724, PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg  + (PRE-DECISIONAL Enforcement Conference with BWXT Nuclear Operations Group, Inc. - Lynchburg)
  • ML23278A218  + (PRE-FILED Exhibits Cover Sheet Templates)
  • ML19046A388  + (PRE-GI-018 Public Meeting Materials)
  • ML18215A207  + (PRE-Remediation Data)
  • ML20088A126  + (PRE-TEST Visual Examination and Crud Characterization of LWR Rods Used in the LONG-TERM,LOW-TEMPERATURE Whole Rod Test)
  • ML20058F869  + (PRESSURE-DEPENDENT Fragilities for Piping Components.Pilot Study on Davis-Besse Nuclear Power Station)
  • ML20129F601  + (PRESSURIZED-THERMAL-SHOCK Test of 6-IN.-THICK Pressure VESSELS.PTSE-1:Investigation of Warm Prestressing and Upper-Shelf Arrest)
  • ML20148L446  + (PRESSURIZED-THERMAL-SHOCK Test of 6-INCH Thick Pressure VESSELS.PTSE-2:Investigation of Low Tearing Resistance and Warm Prestressing)
  • ML20057E590  + (PRESSURIZED-WATER Reactor Internals Aging Degradation Study. Phase 1)
  • ML20261M694  + (PRI Na Make-Up Pump B Discharge Line 4 Inches GCAA-81PPD- 0005 & 1 Inch GCAA-81PPD-0056 Fabrication Iso. Sheet 2)
  • ML20261M691  + (PRI Na Make-Up Pump B Discharge Line 4 Inches GCAA-81PPD- 0005 & 1 Inch GCAA-81PPD-0056 Fabrication Iso. Sheet 1 of 2)