Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19210E324 + (Operating Procedure 507.1,Revision 3, Reactor Bldg Closed Cooling Water Sys Failure)
- ML19210E326 + (Operating Procedure 507.2,Revision 3, Turbine Bldg Closed Cooling Water Sys Failure)
- ML19254E008 + (Operating Procedure 6, Maint of Records)
- ML19254E006 + (Operating Procedure 7,Revision 2, Procedure for Receipt & Opening of Packages Containing Licensed Matl,Removal & Exchange of Sealed Sources & Preparation of Licensed Matl for Shipment)
- ML20199E411 + (Operating Procedure 7201.1, Standby Steam Generator Feedwater Sys - Operating Instructions. Related Info Encl)
- ML19253A964 + (Operating Procedure EOP-10:steam Generator Tube Failure)
- ML19253A965 + (Operating Procedure EOP-11:pressurizer Relief or Safety Valve Stuck Open)
- ML19253A954 + (Operating Procedure EOP-7:station Blackout Operation)
- ML19253A959 + (Operating Procedure EOP-8:main Steam Line or Feedline Break)
- ML19253A961 + (Operating Procedure EOP-9:loss of Reactor Coolant)
- ML19312D635 + (Operating Procedure OP-168:QA Program for Use of DOT 6M Drums in Shipping Special Form Pu-238)
- ML19312D633 + (Operating Procedure OP-169:radiation Safety Program & Responsibilities)
- ML20239A056 + (Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys)
- ML20115H511 + (Operating Procedure OP-402 FPC Crystal River Unit 3 Makeup & Purification Sys, Rev 75)
- ML18081A884 + (Operating Procedure PD-15.7.016, Securing Demineralizer Operations & Dewatering, Revision 0)
- ML13308B644 + (Operating Procedure S-3-5.27,Revision 7, Earthquake)
- ML19250C056 + (Operating Procedure SI-400,Revision 1:surveillance Instruction Re Radioactive Liquid Waste Effluent - Batch Release)
- ML19250C057 + (Operating Procedure SI-401,Revision 1:surveillance Instruction Re Radioactive Liquid Waste Effluent - Continuous Releases - Steam Generator Blowdown)
- ML19250C065 + (Operating Procedure SI-410,Revision 2:surveillance Instruction Re Containment (Upper,Lower,Hot Instrument Room) Purge,Waste Gas Decay Tank Release or Operation of ABGTS or EGTS)
- ML19250C067 + (Operating Procedure SI-417:surveillance Instructions Re Radiation Monitor Setpoint Evaluation - Noble Gases - Gaseous Effluents)
- ML19250C051 + (Operating Procedure TI-18,Revision 1:technical Instruction Re Radiation Monitoring)
- ML19211A143 + (Operating Procedure for Auxiliary Feedwater Sys)
- ML18051A545 + (Operating Procedures Review)
- ML19296C817 + (Operating Procedures for Process Control Program)
- ML20028H115 + (Operating Procedures for Use of GE 8500 (USA/6697/B() Cask)
- ML19249F118 + (Operating QA Plan for Nuclear Generating Stations,Revision 3)
- ULNRC-06562, Operating Quality Assurance Manual (Oqam) Interim Revision 34a + (Operating Quality Assurance Manual (Oqam) Interim Revision 34a)
- EPID:L-2020-LLQ-0000 + (Operating Quality Assurance Manual (Oqam) Interim Revision 34a)
- ULNRC-05852, Operating Quality Assurance Manual (Oqam) Revision 29 + (Operating Quality Assurance Manual (Oqam) Revision 29)
- ML13303B686 + (Operating Quality Assurance Manual (Oqam) Revision 30)
- ULNRC-06327, Operating Quality Assurance Manual (Oqam) Revision 32 + (Operating Quality Assurance Manual (Oqam) Revision 32)
- ML22327A206 + (Operating Quality Assurance Manual (Oqam) Revision 36)
- ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 36 + (Operating Quality Assurance Manual (Oqam) Revision 36)
- ULNRC-05615, Operating Quality Assurance Manual (Oqam), Rev. 026 + (Operating Quality Assurance Manual (Oqam), Rev. 026)
- ML091540099 + (Operating Quality Assurance Manual (Oqam), Rev. 027)
- ULNRC-05328, Operating Quality Assurance Manual (Oqam), Revision 25 + (Operating Quality Assurance Manual (Oqam), Revision 25)
- ML063120132 + (Operating Quality Assurance Manual (Oqam), Revision 25)
- ULNRC-05473, Operating Quality Assurance Manual (Oqam), Revision 26 + (Operating Quality Assurance Manual (Oqam), Revision 26)
- ML091540095 + (Operating Quality Assurance Manual (Oqam), Revision 27)
- ML19302G427 + (Operating Quality Assurance Manual (Oqam) Revision 33a Mark-up, Identifying Changes Through the Use of Strikeovers and Inserts)
- ULNRC-06254, Operating Quality Assurance Manual (Oqam) Revision 31, Oqam Change Notice 15-002 + (Operating Quality Assurance Manual (Oqam) Revision 31, Oqam Change Notice 15-002)
- ML20216A681 + (Operating Quality Assurance Manual Change Revision 34B (EPID L-2020-LLQ-0004 (COVID-19)))
- ML20141L745 + (Operating Quality Assurance Manual Change Revision 34A)
- ULNRC-06177, Operating Quality Assurance Manual Revision 31 + (Operating Quality Assurance Manual Revision 31)
- ULNRC-06340, Operating Quality Assurance Manual Revision 32 Correction + (Operating Quality Assurance Manual Revision 32 Correction)
- ML15035A273 + (Operating Quality Assurance Manual, Rev. 030c)
- ML15035A274 + (Operating Quality Assurance Manual, Rev. 031)
- ULNRC-04844, Operating Quality Assurance Manual, Revision 23 + (Operating Quality Assurance Manual, Revision 23)
- ULNRC-06539, Operating Quality Assurance Manual, Revision 34 + (Operating Quality Assurance Manual, Revision 34)
- ML19302G421 + (Operating Quality Assurance Manual, Revision 34)
- ML20065U275 + (Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1) for Cooper Nuclear Station, Final Technical Evaluation Rept)
- ML20062B299 + (Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2)