Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000412/LER-1997-011-02, On 971229,determined That Inadequate Electrical Isolation in Secondary Process Rack Circuitry Occurred Due to Design Error.Technical Evaluation Rept 1162 Was Developed + (On 971229,determined That Inadequate Electrical Isolation in Secondary Process Rack Circuitry Occurred Due to Design Error.Technical Evaluation Rept 1162 Was Developed)
- 05000325/LER-1999-004-01, On 990325,drywell Pressure Instrumentation Sensing Line Deficiency,Was Determined.Caused by Incorrect Design & Installation of Instrument Sensing Lines.Associated Sensing Lines Were Purged.With + (On 990325,drywell Pressure Instrumentation Sensing Line Deficiency,Was Determined.Caused by Incorrect Design & Installation of Instrument Sensing Lines.Associated Sensing Lines Were Purged.With)
- ML20235A823 + (On Appeal Per 10CFR2.714a from Prehearing Conference Order LBP-87-17 Issued 870526,brief of Intervenor.* Commonwealth of Ma Urges Aslab to Affirm Decision Based on Stated Given Reasons.Certificate of Svc Encl)
- ML20235H714 + (On Appeal Per 10CFR2.714a from Prehearing Conference Order, LBP-87-17,issued 870526,brief of New England Coalition on Nuclear Pollution.* Brief Contains Only Table of Contents & Table of Authorities)
- ML20234F445 + (On Appeal Per 10CFR2.714a from Prehearing Conference Order, LBP-87-17,870526,brief of New England Coalition on Nuclear Pollution.* Certificate of Svc Encl)
- ML20234D022 + (On Appeal Per 10CFR2.714a from Prehearing Conference Order, LBP-87-17,issued 870526.Brief of State of Vt.* Advises That ASLB 870526 Order Admitting Three Contentions Should Be Affirmed.Certificate of Svc Encl)
- ML20215D740 + (On Appeal Per 10CFR2.71a from Prehearing Conference Order, LBP-87-17 Issued on 870526.* Decision Should Be Reversed & Petitions for Intervention Dismissed.Certificate of Svc Encl)
- ML20236C356 + (On Appeal from Decision of ASLB LBP-89-04 Issued on 890130: Brief of Applicant.* Decision of ASLB Should Be Affirmed. Certificate of Svc Encl)
- ML20006B193 + (On Appeal from Decision of ASLB LBP-89-28 (891012).* Decision Should Be Affirmed on Basis That Successful Completion of Low Power Testing Not Prerequisite to Issuance of Full Power License.W/Certificate of Svc)
- ML20236H425 + (On Appeal from Decision of ASLBP Denying Petition to Waive Financial Qualification Regulations.* Appeal Should Be Dismissed & Decision of Licensing Board Should Be Affirmed. Certificate of Svc Encl)
- ML20247F431 + (On Appeal from Decision of Board (LBP-89-19),dtd 890308.* Decision Should Be Affirmed on Basis That Uncertainty of Future Ownership of Applicant Share Does Nothing to Establish Necessary Prima Facie Case.W/Certificate of Svc)
- ML20011F074 + (On Appeal from Decision of Board LBP-89-38 (891211).* Board Decision Should Be Affirmed Due to Contentions Not Passing late-filed Criteria & Argument from Regulatory Interpretation & History Flawed.W/Certificate of Svc)
- ML20033F240 + (On Appeal from Decision of Board LBP-89-32 (901109).* All Board Decisions on Appeal Should Be Affirmed on Basis That No Error Committed Re Threshold Requirements of 10CFR50.47(c)(1).W/Certificate of Svc)
- ML20012D680 + (On Appeal from Decision of Board LBP-90-01 (900108).* Decision Should Be Affirmed on Basis That Board Did Not Err in Rulings on Commonwealth of Ma Motions or Holding That Motions Deemed Untimely.W/Related Info & Certificate of Svc)
- ML20205F931 + (On Appeal from Order of Board Issued 880808.* Order Should Be Affirmed.Certificate of Svc Encl)
- ML20245J208 + (On Appeal from Partial Initial Decision of Board Issues 881230 (LBP-88-32).* Decision Should Be Affirmed.Supporting Documentation & Certificate of Svc Encl)
- ML20214T315 + (On Appeal from Partial Initial Decision of ASLB Issued 870325.* Decision Should Be Affirmed.Certificate of Svc Encl)
- ML20205Q915 + (On Appeal from Prehearing Conference Order of ASLB Issued 990317 (LBP-99-14).Reply Brief of Intervenor Necnp.* LBP-99-14 Should Be Upheld.Preceeding Should Go Forward. with Certificate of Svc)
- ML20205G079 + (On Appeal from Prehearing Conference Order of Atomic Safety & Licensing Board Issued 990317 (LBP-99-14)Brief of Licensee.* LBP-99-14 Should Be Reversed & Proceeding Should Be Dismissed.With Certificate of Svc)
- ML19345F961 + (On Application of Probabilistic Method to Estimation of Seismic Risk at Seabrook Nuclear Power Plant Site)
- ML18353A961 + (On Bayesian Estimation for Software Reliability)
- ML18219A774 + (On Behalf of Environmental Conscience, Inc., I Hereby Request Permission for Environmental Conscience, Inc. to Make a Limited Appearance in the Proceeding)
- ML20148U468 + (On Behalf of Ga Co,Requests Access to All Documents in NRC Possession Re Subj Facils)
- NRC 2016-0018, On Clarification to License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation, + (On Clarification to License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation,)
- ML20058J771 + (On Concept of Mgt of Major Accidents at Nuclear Power Plants in Ussr)
- ML18110A878 + (On Containment Isolation Valve)
- ML18110A871 + (On Containment Spray Header Valve)
- ML19323G465 + (On Corrosion Adequacy of 2 1/4 Cr-1Mo Steel for LMFBR Steam Generation Sys Svc)
- ML18110A876 + (On Detector Calibration)
- ML18110A877 + (On Diesel Generator 1A, Update Report No. 1)
- ML18110A879 + (On Dropped Control Element Assembly No. 39 Initiating a Turbine Runback)
- 05000280/FIN-2014406-01 + (On Duty Security Officer Confirmed Positive Test for Alcohol)
- ML20023A944 + (On Existence of Early Core Rewet During Large Break LOCA Transients in Commercial PWR, Presented at ANS Intl Meeting on Thermal Nuclear Reactor Safety,820829-0902)
- ML19305D072 + (On History of Evolution of LWR Safety in Us)
- ML19095A124 + (On Instructions from Client, Virginia Electric & Power Co, Enclosed Certified Endorsements for Neila & Maelu Policies)
- ML13311A242 + (On Instrumental Vs Effective Acceleration & Design Coefficients, Presented at 790822-24 Proceedings of Second Us Natl Conference on Earthquake Engineering,Stanford Univ,Ca)
- ML18110A869 + (On Intake Cooling Water Pump)
- ML18142A747 + (On Item 19 of Operating Data Report, Correct Duration of Refueling Shutdown Is 6 Weeks, Not 12 Weeks)
- 05000316/LER-2002-005, On May 12,2002 Unit 2 Tripped Due to Instrument Rack 24-Volt DC Power Supply Failure + (On May 12,2002 Unit 2 Tripped Due to Instrument Rack 24-Volt DC Power Supply Failure)
- ML20058J300 + (On Modeling of Radiation Embrittlement of Matls of Vessels of Atomic Energy Station Reactors)
- ML19351F031 + (On Motions of Particles in Turbulent Flows)
- 05000382/LER-2022-001-01, On Non-Compliance with Technical Specifications Due to Incorrect Procedural Guidance for Radiation Monitors + (On Non-Compliance with Technical Specifications Due to Incorrect Procedural Guidance for Radiation Monitors)
- ML18110A880 + (On Off-Site Power)
- ML20058J275 + (On Oxidizing-Reducing Potential of Coolant of Vver Type Nuclear Power Reactors)
- ML20053A504 + (On Performance of Large Gantry & Bridge Cranes in Past Earthquakes,)
- ML20058J384 + (On Principal Relationship Between Power Plant Stainless Steel Loop Corrosion-Erosion & Thermodynamic Equilibrium Factors)
- ML20207A217 + (On Probabilistic Aspects of Alpha-Mode Containment Failupart I)
- ML20207A427 + (On Probabilistic Aspects of Steam Explosion Induced Containment Failupart V - Final Results)
- ML20205F497 + (On Propagation Error in Air Pollution Measurements)
- ML20128N359 + (On Propagation of Error in Air Pollution Measurements)
- ML18110A881 + (On RCS Flow)