Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18096A550 + (New Milford Medical Group, License Renewal, Mail Control No. 602235)
- RIS 2002-19, New Modalities To Be Regulated Under 10 CFR 35.1000 + (New Modalities To Be Regulated Under 10 CFR 35.1000)
- RIS 2002-19, New Modalities to Be Regulated Under 10 CFR 35.1000 + (New Modalities to Be Regulated Under 10 CFR 35.1000)
- L-MT-05-076, New Monticello Site Vice President + (New Monticello Site Vice President)
- L-MT-03-063, New Monticello Site Vice President + (New Monticello Site Vice President)
- ULNRC-05597, New NPDES Discharge Permit + (New NPDES Discharge Permit)
- ML17230A308 + (New NRC Expectations Contained in Regulatory Guide 8.7, Revision 3, Instructions for Recording and Reporting Radiation Dose Data)
- ML20206P921 + (New NRC Reactor Inspection and Oversight Program)
- ML25189A248 + (New Nuclear States Perspective)
- ML18038A512 + (New OMB Clearance, NRC Forms 361, 361A and 361N, Proposed Information Collection)
- ML18120A192 + (New Opportunities Survey Field Notes)
- ML20151M698 + (New Orleans Public Svc Inc Annual Rept,1987)
- ML20073D167 + (New Orleans Public Svc,1990 Annual Rept)
- ML20245E117 + (New Orleans Public Svc,Inc,1988 Annual Rept)
- ML20155C097 + (New Orphaned Radioactive Sources Program in Us, Presented at 980914-18 Intl Conference on Safety & Radiation Sources & Security of Radioactive Matl in Dijon,France)
- ML17229B560 + (New Plant Licensing Lessons Learned and Recommended Actions)
- LIC-14-0090, New Plant Manager + (New Plant Manager)
- ML082180526 + (New Pool Water Conductivity Monitoring System at Washington State University Nuclear Radiation Center Installed and Became Operational March 2008)
- ML19246A142 + (New Presentation Slides for September 6, 2019, Meeting on RIS 2016-11)
- ML023540399 + (New Procedures, Emergency Management Plan for Matagorda County, Bay City, and Palacios, Annex W Procedures Fixed Nuclear Facilities Response)
- ML083510086 + (New Projected Date for Alternate Source Term Licensing Submittal Identified in Supplemental Response to GL-04-002: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water)
- ML21056A173 + (New Proposed Alternative Web Based Relief Request)
- ML19317E310 + (New Proposed List of Subissues of Fact Submitted by Doj. Certificate of Svc Encl)
- ML13206A021 + (New RAI for Millstone 2 Ultimate Heat Sink Amendment)
- ML020280153 + (New RSC Chair Effective November 2, 2001)
- ML20196D273 + (New Reactor Control Console QA Program)
- RIS 2006-06, New Reactor Standardization Expectations Needed to Support the Design-Centered Licensing Review Approach + (New Reactor Standardization Expectations Needed to Support the Design-Centered Licensing Review Approach)
- ML23018A174 + (New Reactors Business Line Fee Estimates)
- ML062220478 + (New Recovery .Xls - NUREG/CR-5496)
- ML051460168 + (New Release - Dominion Declares Alert at Millstone Power Station)
- Information Notice 1991-86, New Reporting Requirements for Contamination Events at Medical Facilities (10 CFR 30.50) + (New Reporting Requirements for Contamination Events at Medical Facilities (10 CFR 30.50))
- ML033210256 + (New Revisions for Farley Procedures)
- ENS 47294 + (New River Hydraulic Analysis Raises Maximum Flood Level)
- PMNS20230585, New Robatel Technologies Type B Waste Transportation Package Public Meeting + (New Robatel Technologies Type B Waste Transportation Package Public Meeting)
- ML19077A320 + (New Rx Guidance Updates and EIS Lessons Learned - Jdavis RIC Presentation Acc)
- ML18156A596 + (New Section for General Domestic Licenses for Byproduct Material (Part 31))
- ML18156A597 + (New Section for Irradiators (Part 36))
- ML18156A598 + (New Section for Licenses for Industrial Radiography (Part 34))
- ML18156A599 + (New Section for Manufacturing and Transfer (Part 32))
- ML18156A600 + (New Section for Well Logging)
- ML20087K371 + (New Sensor for Measurement of LOW Air Flow Velocity.Phase I Final Report)
- L-05-181, New Site Vice President + (New Site Vice President)
- L-03-078, New Site Vice President for Beaver Valley Power Station + (New Site Vice President for Beaver Valley Power Station)
- ML022560400 + (New Special Operations Limiting Condition of Operation Suppression Pool Makeup-Mode 3. Revised TS Page 3.6-34 and the New Additional TS Page 3.10-23, 3.10-24, 3.10-25 & 3.10-26)
- 05000334/LER-2003-006, New Steam Generator Level Uncertainties Identified Which Exceed Available Setpoint Margins + (New Steam Generator Level Uncertainties Identified Which Exceed Available Setpoint Margins)
- ML101940117 + (New TS 3.7.19 as Received in Amendment No. 197)
- ML101940108 + (New TS 3.7.19 as Received in Amendment No. 197)
- ML18095A724 + (New Tech Spec Page 3/4 3-27 Re ESFAS Instrumentation Trip Setpoints)
- ML18250A181 + (New Technologies Working Group Charter)
- ML19121A441 + (New Technologies Working Group Charter)
- ML16062A379 + (New Transient Analysis Results 160226)