ML18120A192
From kanterella
Jump to navigation
Jump to search
ML18120A192 | |
Person / Time | |
---|---|
Issue date: | 01/29/2016 |
From: | Oak Ridge Institute for Science & Education |
To: | Office of Nuclear Material Safety and Safeguards |
RXChang NMSS/DUWP 415.5888 T5D26 | |
References | |
Download: ML18120A192 (9) | |
Similar Documents from Oak Ridge Institute for Science & Education | |
---|---|
Category:Note
MONTHYEARML18120A1922016-01-29029 January 2016
[Table view]Some use of "" in your query was not closed by a matching "".New Opportunities Survey Field Notes ML0617102252005-12-19019 December 2005 Orise Letter Dated 12/19/05, W/Personal Notes, Analytical Results for Water Samples Near the Braidwood Nuclear Generation Station in Braidwood, Illinois, Inspection Report 456/457/2005-010 - Rfta No. 06-001 2016-01-29 Category:Report MONTHYEARML24004A1332023-12-27027 December 2023
[Table view]Some use of "" in your query was not closed by a matching "".Scan MDAs for DRPs Technical Report ML23310A1082023-11-0303 November 2023 Confirmatory Survey Report 2023 ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 ML22304A1372022-10-31031 October 2022 Estimating Scan Minimum Detectable Activities of Discrete Radioactive Particles -Technical Report ML22129A1172022-04-29029 April 2022 Independent Confirmatory Survey Summary and Results for the U.S. Navy Surface Ship Barge Ballast Wing Tank 9, Port Mobile, Alabama ML21267A5232021-09-0303 September 2021 Orise Report of April 2021 Survey at Zion Nuclear Power Station ML21116A1322021-04-23023 April 2021 Independent Survey Results for the Shutdown Reactors at the Vallecitos Nuclear Center, Vbwr (License DPR-1, Docket 50-18), EVESR (License DR-10, Docket 50-183); and, Getr (License TR-1, Docket 50-70) ML21027A1632021-01-0808 January 2021 Oak Ridge Institute for Science and Education (Orise), Ltr Dated January 8, 2021 W/Enclosure, Unc, Inc., Naval Final Confirmatory Survey Report ML20034D6612020-01-31031 January 2020 Oak Ridge Institute for Science & Education - Transmittal of Independent Confirmatory Survey Summary and Results for the Subsurface Soils Associated with the Sacrificial Barrier at the Zion Nuclear Power Station ML20029D8962020-01-28028 January 2020 Independent Confirmatory Survey Summary and Results for Select Penetrations and Embedded Piping in the Containment and Auxiliary Buildings at the Zion Nuclear Power Station ML20027A2382020-01-24024 January 2020 Independent Confirmatory Survey Summary and Results for the Spent Fuel Pool and Transfer Canal at the Zion Nuclear Power Station, Zion, Illinois ML20296A5192020-01-10010 January 2020 Confirmatory Survey Report 5299-SR-05 - January 10, 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19337D3822019-11-26026 November 2019 General Atomics Confirmatory Survey Report from Orau ML21246A2672019-11-26026 November 2019 5339-SR-01-0 Independent Confirmatory Survey Summary and Results for the General Atomics Triga Reactor Facility Building G21 and Associated Land Area, San Diego, California ML19239A1182019-08-13013 August 2019 GE Hitachi Nuclear Energy, Vallecitos Nuclear Center - Report of Independent Confirmatory Survey Results for the Request for Partial Site Release of the Vallecitos Nuclear Center (License Numbers: DPR-1 and DR-10, Docket Numbers: 50-18 and ML19247C5492019-08-0202 August 2019 Orise Confirmatory Survey Plan - General Atomics Triga Reactor Facility ML20296A5132019-06-26026 June 2019 Confirmatory Survey Report 5299-SR-04 - June 26, 2019 ML19065A2562019-02-27027 February 2019 Unit 1: Final Confirmatory Survey Summary and Results for the Non-Impacted Land Areas (License DPR-40, Docket No. 50-285) ML19053A6772019-02-0707 February 2019 Oak Ridge Institute for Science & Education - Submittal of Independent Confirmatory Survey Summary and Results for the Waste Water Treatment Facility and Select Land Areas at the Zion Nuclear Power Station ML19063A9942018-08-16016 August 2018 5326-SR-01-0 American Centrifuge Survey Report ML19007A0322018-06-20020 June 2018 5299-SR-03 - LACBWR Confirmatory Survey Report ML18100A0142018-04-0404 April 2018 Submittal of Independent Confirmatory Survey Summary and Results for Survey Units OOL10-14 and NOL01-09 ML20296A5072018-03-23023 March 2018 Confirmatory Survey Report 5299-SR-02 - March 23, 2018 ML18024A8762018-01-24024 January 2018 5184-SR-09-0 Hematite Subsurface Sampling Report_Final (012418) ML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML17024A0212017-01-23023 January 2017 Independent Confirmatory Survey Summary and Results for the Non-Impacted Land Areas at the La Crosse Boiling Water Reactor, Genoa, Wisconsin ML18120A1922016-01-29029 January 2016 New Opportunities Survey Field Notes ML15317A3402015-10-15015 October 2015 Oak Ridge Associated Universities (Orau), Letter Report for Analytical Results for Six (Four Concrete, One Metal, and One Soil) Samples Associated with General Atomics in San Diego, CA ML19007A0332014-10-0808 October 2014 GP-EO-313196-QA-PL-001 - LACBWR Characterization Qapp 2014 ML12226A0702012-06-28028 June 2012 Orise Final Report - Independent Confirmatory Survey of the Nuclear Research Laboratory at the University of Illinois ML1203704612012-01-30030 January 2012 Theodore Smith Ltr Revised Final Report No. 1: Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan ML11319A1012011-11-0707 November 2011 Oak Ridge Institute for Science & Education Independent Confirmatory Survey Report for the University of Arizona Nuclear Reactor Laboratory, Tuscon, Az ML1131111732011-10-27027 October 2011 Revised Final Report No. 2, Fermi Independent Confirmatory Survey Summary and Results ML11209B5382011-04-20020 April 2011 Confirmatory Survey Results for Portions of the Material and Equipment from Units 1 and 2 at the Hbpp. 2029-SR-01-0 ML1029401782010-10-13013 October 2010 B. Watson Ltr. Report No. 1: Independent Confirmatory Survey Summary and Results for the Enrico Fermi: Atomic Power Plant, Unit 1, Newport, Michigan ML1023002782010-01-12012 January 2010 Orise Analytical Results for Five Nasa Plum Brook Soil Samples ML1000701172009-11-19019 November 2009 Oak Ridge Institute for Science and Education, Final Report - Radiological Survey for New Generation Footprint Area Plant Soils at Humboldt Bay Unit 3 ML0920502152009-07-21021 July 2009 Confirmatory Survey Report for Activities Performed in the Industrial Area of the Rancho Seco Nuclear Generating Station ML0914701032009-05-0707 May 2009 Confirmatory Survey Report for September and October 2008 at the Rancho Seco Nuclear Generation Station by Oak Ridge Institute for Science and Education (Orise) ML0913504682009-05-0606 May 2009 Confirmatory Survey Report for the Rancho Seco Nuclear Generating Station Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0912805482009-04-30030 April 2009 Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0904805822008-08-29029 August 2008 Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station ML0814802952008-05-0606 May 2008 Orise Final Report - Independent Confirmatory Survey Summary and Results for the Plum Brook Reactor Facility, Sandusky, Ohio. ML0905103162008-04-18018 April 2008 Orise Report for Analyses of Nine Water Samples from Set Seven ML0905100292008-03-12012 March 2008 Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station ML0734505732007-12-0707 December 2007 Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 ML0731801672007-10-18018 October 2007 Report for Analysis of Seven Water Samples from Set Five from the Indian Point Power Station, Buchanan, New York, Dtd October 18, 2007 ML0728402922007-08-22022 August 2007 Report for Analysis for Three Water Samples from Set One from the Indian Point Power Station, Buchanan, New York. Dtd. August 22, 2007 ML0728403232007-08-0101 August 2007 Report for Analysis for Samples from Set Twenty-Five from the Indian Point Power Station, Buchanan, New York. Dtd. August 1, 2007 2023-06-07 Category:Miscellaneous MONTHYEARML19007A0322018-06-20020 June 2018
[Table view]Some use of "" in your query was not closed by a matching "".5299-SR-03 - LACBWR Confirmatory Survey Report ML17083A9832017-03-22022 March 2017 Orau Independent Confirmatory Survey Summary, Results, and In-Process Inspection for the Interim On-Site Storage Building and Surrounding Area at the Rancho Seco Nuclear Generating Station ML18120A1922016-01-29029 January 2016 New Opportunities Survey Field Notes ML15317A3402015-10-15015 October 2015 Oak Ridge Associated Universities (Orau), Letter Report for Analytical Results for Six (Four Concrete, One Metal, and One Soil) Samples Associated with General Atomics in San Diego, CA ML19007A0332014-10-0808 October 2014 GP-EO-313196-QA-PL-001 - LACBWR Characterization Qapp 2014 ML12226A0702012-06-28028 June 2012 Orise Final Report - Independent Confirmatory Survey of the Nuclear Research Laboratory at the University of Illinois ML11319A1012011-11-0707 November 2011 Oak Ridge Institute for Science & Education Independent Confirmatory Survey Report for the University of Arizona Nuclear Reactor Laboratory, Tuscon, Az ML11209B5382011-04-20020 April 2011 Confirmatory Survey Results for Portions of the Material and Equipment from Units 1 and 2 at the Hbpp. 2029-SR-01-0 ML1023002782010-01-12012 January 2010 Orise Analytical Results for Five Nasa Plum Brook Soil Samples ML0912805482009-04-30030 April 2009 Draft Confirmatory Survey Report for the Rancho Seco Containment Building by Oak Ridge Institute for Science and Education (Orise) ML0904805822008-08-29029 August 2008 Confirmatory Survey Results for Activities Performed in April and May 2008 for the Rancho Seco Nuclear Generating Station ML0905103162008-04-18018 April 2008 Orise Report for Analyses of Nine Water Samples from Set Seven ML0905100292008-03-12012 March 2008 Confirmatory Survey Results for Activities Performed in December 2007, Rancho Seco Nuclear Generating Station ML0734505732007-12-0707 December 2007 Confirmatory Survey Report for Portions of the Auxiliary Building Structural Surfaces and Turbine Building Embedded Piping, Dated December 7, 2007 ML0731801672007-10-18018 October 2007 Report for Analysis of Seven Water Samples from Set Five from the Indian Point Power Station, Buchanan, New York, Dtd October 18, 2007 ML0728402922007-08-22022 August 2007 Report for Analysis for Three Water Samples from Set One from the Indian Point Power Station, Buchanan, New York. Dtd. August 22, 2007 ML0728403232007-08-0101 August 2007 Report for Analysis for Samples from Set Twenty-Five from the Indian Point Power Station, Buchanan, New York. Dtd. August 1, 2007 ML0728403572007-08-0101 August 2007 Report for Analysis for Samples from Set Twenty-Seven from the Indian Point Power Station, Buchanan, New York. Dtd. August 1, 2007 ML0728403122007-07-31031 July 2007 Report for Analysis for Samples from Set Twenty-Four from the Indian Point Power Station, Buchanan, New York. Dtd. July 31, 2007 ML0731206132007-07-0303 July 2007 Orise Confirmatory Survey Dated 07/03/2007 for Haddam Neck (Cy) ML0728402552007-05-0303 May 2007 Interim Report for Completed Analysis for Samples from Set Twenty-One from the Indian Point Power Station, Buchanan, New York. Dtd. May 3, 2007 ML0711402222007-04-20020 April 2007 Oak Ridge Institute for Science and Education - Letter Report for 34 Water Samples from the Vicinity of Braidwood Station ML0707300272007-03-0707 March 2007 Oak Ridge Institute for Science and Education - Letter Report for 18 Water Samples from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois (Inspection Report No. 050-00456/2007-003) (Rfta No. 06-001) ML0718302282007-02-0202 February 2007 Letter and Report for Additional Analyses of Two of the Twelve Soil Samples from Oyster Creek (Inspection Report No. 50-219/2006-05) from Orise Dtd 2/2/07 ML0623501082006-08-18018 August 2006 Analytical Results for Five Water Samples, Batch Four, from the Vicinity of LaSalle Station, LaSalle, Illinois (Inspection Report No. 050-00373/2006-005)(RFTA No. 06-001) ML0622701622006-08-10010 August 2006 Report of Analytical Results for Four Water Samples, Batch Four, from the Vicinity of the Zion Nuclear Station, Zion, Illinois (Inspection Report No. 050-00295/2006-001)(RFTA No. 06-001) ML0622002992006-08-0404 August 2006 Analytical Results for Six Soil Samples, Batches One and Two, from Big Rock Point Nuclear Station, Charlevoix, Michigan (Inspection Report No. 050-00155/2006-001)(RFTA No. 06-001) ML0622002972006-08-0303 August 2006 Analytical Results for Six Water Samples in Batch Five from the Vicinity of the Byron Generating Station, Byron, Illinois (Inspection Report No. 050-00454/2006-004)(RFTA No. 06-001) ML0621602722006-07-28028 July 2006 Analytical Results for Fourteen Water Samples, Batch Eight, from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois (Inspection Report No. 050-00456/2006-004)(RFTA No. 06-001) ML0613704642006-05-0808 May 2006 Analytical Results for Two Soil Samples Connected March 2, 2006 from Connecticut Yankee, Haddam Neck, Connecticut (Inspection Report No. DPR-61/2006001) (Rfta No.06-001) ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0530400222005-09-29029 September 2005 Orise In-Process Inspection Survey Results for the West End Excavation and Service Building at the Connecticut Yankee Haddam Neck Plant, Haddam, Connecticut ML0528602222004-06-30030 June 2004 Final Confirmatory Survey Plan for the Penelec Line Shack Building, Saxton Nuclear Experimental Corporation 2018-06-20 |
Retrieved from "https://kanterella.com/w/index.php?title=ML18120A192&oldid=4996314"