Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML061710275 + (Multiple Maps and Drawings: Offsite Sample Results)
- ML14252A893 + (Multiple Notice of Availability of the Final Supplemental Environmental Impact Statement for License Renewal of Grand Gulf, Unit 1)
- ML20101Q923 + (Multiple Notices of Appearance in Proceeding.Certificate of Svc Encl)
- ML19211A008 + (Multiple Property Variations in Coaxial Cylindrical Conductors Determined w/Multiple-Frequency Eddy Currents)
- 05000306/FIN-2011003-04 + (Multiple SAMG Procedures not Consistent with Industry Guidance)
- ML20126M342 + (Multiple Source Gamma Calibrator,Model 1,000)
- ENS 41787 + (Multiple Specified Systems Actuations Due to Loss of Ac Safety Related Buses)
- ML13044A114 + (Multiple Spurious Operation Evaluation Report R1976-20-01, Dated January 2013, Revision 2)
- ML20083K080 + (Multiple Subsequent Safety/Relief Valve Actuation Evaluation for Mark 1 Containment,Rev 1, Dtd Nov 1978.Tests of Torus Support Sys Were Run & Results Confirm Conclusions of Original 780727 Rept Re Safety)
- ML19354D506 + (Multiple System Responses Program - Identification of Concerns Related to a Number of Specific Regulatory Issues)
- 05000296/LER-2010-003, Multiple Test Failures of Excess Flow Check Valves + (Multiple Test Failures of Excess Flow Check Valves)
- 05000388/LER-2009-001, Multiple Test Failures of Main Steam Safety Relief Valves + (Multiple Test Failures of Main Steam Safety Relief Valves)
- 05000457/LER-2002-001, Multiple Test Failures of Pressurizer Safety Valves and Failure to Report Those Failures Due to Management Weakness in Applying Reportability Requirements on April 8, 2002 + (Multiple Test Failures of Pressurizer Safety Valves and Failure to Report Those Failures Due to Management Weakness in Applying Reportability Requirements on April 8, 2002)
- 05000352/LER-2019-001, Multiple Trains of RHRSW Inoperable for Greater than Time Allowed by Technical Specifications Due to Pipe Corrosion + (Multiple Trains of RHRSW Inoperable for Greater than Time Allowed by Technical Specifications Due to Pipe Corrosion)
- ENS 52057 + (Multiple Valid Specified System Actuations Due to Loss of Service Transformer 21)
- 05000387/FIN-2015002-04 + (Multiple Violations of Work Hour Limitations by Licensed Operators)
- ML18017B787 + (Multiplexing. Sheet 24.No Revision Date.Consists of Four Aperture Cards)
- ML18017B786 + (Multiplexing. Sheet 25.No Revision Date.Consists of Two Aperture Cards)
- ML19309E405 + (Multirod Burst Test Program Program Rept for Jul-Dec 1977)
- ML20064G865 + (Multirod Burst Test Program Progress Report for JANUARY-JUNE 1982)
- ML20052E438 + (Multirod Burst Test Program Progress Report for JULY- December 1981)
- ML20040C204 + (Multirod Burst Test Program Progress Report for January - June 1981)
- ML19209B062 + (Multirod Burst Test Program Progress Rept, Jan-Mar 1979)
- ML20126F352 + (Multirod Burst Test Program, Interim quick-look Rept)
- ML20147H586 + (Multirod Burst Test Program, Progress Rept Apr-June l978)
- ML19248C610 + (Multirod Burst Test Program, Progress Rept July-Dec 1978)
- ML19332A173 + (Multirod Burst Test Program, Progress Rept for Jul-Dec 1979)
- ML19321A582 + (Multirod Burst Test Program.Progress Report for April-June 1979)
- ML19347E114 + (Multirod Burst Test Program.Progress Report for January-June 1980)
- ML20008F995 + (Multirod Burst Test Program.Progress Report for July - December 1980)
- ML19331E066 + (Multirod Burst Test Program:Preliminary Results of B-5 (8x8) Bundle Test, Quick Look Rept)
- ML19257C805 + (Multirod Burst Tests, Bundle B-3 Test Data Rept)
- ML20041E474 + (Multirod Burst Tests, Trip Rept)
- ML19242A467 + (Multirod Burst Tests;Bundle B-1 Test Data, Interim Rept)
- ML20077F133 + (Multivariable Modeling of Pressure Vessel and Piping J-R Data)
- ML16048A131 + (Municipal Electric Authority of Georgia Response on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)))
- ML15167A465 + (Municipal Electric Authority of Georgia Response on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)))
- ML19259B945 + (Municipal Energy Agency of Ms Requests Commencement of Proceedings to Require Util to Comply W/Cp License Conditions Re Interconnect Agreement.Related Correspondence W/Doj Encl)
- ML21161A071 + (Municipality of Anchorage 50-15852-02 - Notice of License Expiration)
- ML17263B168 + (Mupra: a Few Observations and Technical Challenges)
- ML18059A123 + (Murdock 1993- TN5377--FWS 1993 Spreading Avns Recovery Plan)
- ML18059A122 + (Murdock and Langdon 1997- TN5380--FWS 1997 Recovery Plan Rock Gnome)
- ML19116A064 + (Murphy Campe Paper)
- ML18222A230 + (Murphy Exploration & Production Company - USA; Changes to Fee Categories and Program Codes Based on the 2018 Fee Rule)
- ML022750208 + (Murray & Trettel, Inc., Draft of Update of Meteorological Portion of FSAR for H. B. Robinson, Unit 2 (Encl. 2H))
- ML15107A105 + (Mururoa Supplied Air Suits Models MTH2 and V4F1 and the Mururoa Blu Suit Systems)
- ML21306A242 + (Muscogee (Creek) Nation Email the Indiana Agreement State Proposal)
- ML042800176 + (Mussel Study Near Hobbs Island on the Tennessee River for Butler Basin Marina)
- ML19276H668 + (Mussel Survey of Thief Slough at Mile 678 on Ms River Near Genoa,WI,780921-22)
- ML21005A027 + (Must Amendment No 23 Acceptance Review - Application Accepted 12-28-2020 (6))
- ML20101M580 + (Mut Dissolved Gas Evolution Analysis)