Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Multiple DNB Events". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20198L406  + (Multifrequency Eddy Current Exam of Containment Spray HX Tubes,Comanche Peak Unit 1,Train a & B & Unit 2,Train A. Vol 1:Baseline Exam Rept)
  • ML19327B724  + (Multiloop Integral System Test (Mist): Final Report.Test Group 34, Steam Generator Tube Rupture)
  • ML19327B719  + (Multiloop Integral System Test (Mist): Final Report.Test Group 31, SBLOCA with Varied Boundary Conditions)
  • ML19327B726  + (Multiloop Integral System Test (Mist): Final Report.Test Group 36, Pump Operation)
  • ML20006D138  + (Multiloop Integral System Test (Mist): Final Report. RELAP5/MOD2 Mist Analysis Comparisons)
  • ML19327B725  + (Multiloop Integral System Test (Mist): Final Report.Test Group 35, Noncondensibles and Venting)
  • ML19327B722  + (Multiloop Integral System Test (Mist): Final Report.Test Group 33, HPI-PORV Cooling)
  • ML19327B721  + (Multiloop Integral System Test (Mist): Final Report.Test Group 32, SBLOCA with Altered Leak and HPI Configurations)
  • ML20246Q021  + (Multiloop Integral System Test (Mist):Final Report. Inter-Group Comparisons)
  • ML20059K411  + (Multiloop Integral System Test (Mist):Final Report.Mist Phase IV Tests)
  • ML20064A656  + (Multiloop Integral System Test (Mist):Final Report.Mist Phase IV Tests)
  • ML20024H123  + (Multiloop Integral System Test (Mist):Final Report.Summary)
  • ML20024H122  + (Multiloop Integral System Test (Mist):Mist Facility Functional Specification)
  • ML20027E186  + (Multimethods Approach to Safety Parameter Display Evaluation, Interim Rept)
  • ML20027B990  + (Multimethods Approach to Safety Parameter Display Evaluation)
  • ML20045E348  + (Multinational Design Evaluation Program Vendor Inspection Report of Ensa, Equipos Nucleares S.A. S.M.E, No. 99901379/2019- 201, Notice of Nonconformance)
  • ML19331A615  + (Multinational Design Evaluation Program Vendor Inspection Report of Ensa, Equipos Nuclears S.A. S.M.E, 99901379/2019-201, Notice of Nonconformance)
  • ML19259C525  + (Multinode Analysis of Small Breaks for B&W 205-Fuel-Assembly Nuclear Plants W/Internals Vent Valves)
  • ML19256F762  + (Multiphase Transients W/Coolant & Core Matls in LMFBR Core Disruptive Accident Energetics Evaluations)
  • ML031360468  + (Multiple Addressees, Letter Transmitting Report, Operating Experience Assessment - Effects of Grid Events on Nuclear Power Plant Performance)
  • ML13101A126  + (Multiple Authors Ltr. Re Edisons Proposed Experimental Restart of the Crippled San Onofre Nuclear Reactors License Amendment and Rigorous Oversight)
  • BSEP-95-0220, Multiple Chlorine Sensors Used for Control Bldg Isolation Logic Found to Be Outside TS Tolerances During Routine Calibr  + (Multiple Chlorine Sensors Used for Control Bldg Isolation Logic Found to Be Outside TS Tolerances During Routine Calibr)
  • ML071300024  + (Multiple Comments (4) Submitted by Progress Energy Third Party Coalitions Consisiting of Resolutions in Support of the Continued Safe and Secure Operation of the Shearon Harris)
  • 05000305/FIN-2009002-04  + (Multiple Component Cooling Water Pipes in Close Proximity to High Energy Feedwater Lines)
  • ML19253C909  + (Multiple Controlled Cell Removal)
  • 05000280/FIN-2015008-04  + (Multiple Design Deficiencies in the Fire Protection Program)
  • 05000266/FIN-2010005-05  + (Multiple ESFAS Steam Line Pressure Channel Modules Inoperable Due to Inadequate Calibration Instructions)
  • ML26043A277  + (Multiple Emails Transmitting Results of Decommissioning Funding Plan Reviews)
  • ENS 43943  + (Multiple Emergency Sirens Lost Power Due to Severe Weather)
  • 05000285/FIN-2014009-02  + (Multiple Examples of Failure to Evaluate Operability of Degraded or Non-Conforming Condition)
  • 05000285/FIN-2013008-32  + (Multiple Examples of Inadequate RISK-BASED Operability Determinations)
  • 05000285/FIN-2013008-31  + (Multiple Examples of Operability Determinations That Lacked Adequate Technical Justification)
  • 05000336/FIN-2011008-01  + (Multiple Examples of Procedural Violations and Inadequate Procedures Relating to Control Room Crew Performance During a Plant Transient)
  • 05000275/FIN-2018003-01  + (Multiple Examples of Scaffolding in Place Greater Than 90 Days Without Required Evaluation)
  • 05000298/FIN-2009005-02  + (Multiple Examples of a Failure to Follow Procedure For Extension Cord Configuration Control)
  • 05000266/FIN-2005013-06  + (Multiple Examples of the Failure to Notify the NRC within 8 Hours as Required by 10 CFR 50.72)
  • 05000456/FIN-2016002-01  + (Multiple Failure to Follow Procedures Leads to Inadequate Monitoring of Gas Susceptible Locations)
  • 05000456/FIN-2014004-02  + (Multiple Failures to Follow Operability Evaluation Process Following Discovery of a Non-Conforming Condition in the Ultimate Heat Sink)
  • 05000528/FIN-2013002-01  + (Multiple Failures to Identify Conditions Adverse to Quality)
  • ENS 45058  + (Multiple Failures to Meet 24 Hour Reporting Criteria)
  • 05000443/FIN-2016002-02  + (Multiple Letdown Isolations Resulting from an Inadequate Procedure and the Performance of Steps Not Prescribed by Established Procedures)
  • ML012910122  + (Multiple Letters - NRC Discussion of Comments Received on the Environmental Assessment for the Univ of Missouri-Columbia Construction Permit Recapture Amendment)
  • ML013100454  + (Multiple Letters - NRC Discussion of Comments Received on Operational Issues-University of Missouri-Columbia Construction Permit Recapture Amendment (Tac No. MB0850))
  • ML18324A626  + (Multiple Letters Dtd 11/01/2018 to Licensees Who Filed for Reciprocity in 2018, Reminder for Initial Reciprocity Filing of NRC Form 241 for Calendar Year 2019)
  • ML052060249  + (Multiple Letters and Post Exam Comments (Folder 1))
  • ML13324A814  + (Multiple Level Response Spectra Analysis W/Pvrc Variable Damping)
  • 05000289/FIN-2010009-03  + (Multiple MSSVs test failures due to improper evaluation of Operating Experience)
  • ML061710275  + (Multiple Maps and Drawings: Offsite Sample Results)
  • ML14252A893  + (Multiple Notice of Availability of the Final Supplemental Environmental Impact Statement for License Renewal of Grand Gulf, Unit 1)
  • ML20101Q923  + (Multiple Notices of Appearance in Proceeding.Certificate of Svc Encl)