Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198L406 + (Multifrequency Eddy Current Exam of Containment Spray HX Tubes,Comanche Peak Unit 1,Train a & B & Unit 2,Train A. Vol 1:Baseline Exam Rept)
- ML19327B724 + (Multiloop Integral System Test (Mist): Final Report.Test Group 34, Steam Generator Tube Rupture)
- ML19327B719 + (Multiloop Integral System Test (Mist): Final Report.Test Group 31, SBLOCA with Varied Boundary Conditions)
- ML19327B726 + (Multiloop Integral System Test (Mist): Final Report.Test Group 36, Pump Operation)
- ML20006D138 + (Multiloop Integral System Test (Mist): Final Report. RELAP5/MOD2 Mist Analysis Comparisons)
- ML19327B725 + (Multiloop Integral System Test (Mist): Final Report.Test Group 35, Noncondensibles and Venting)
- ML19327B722 + (Multiloop Integral System Test (Mist): Final Report.Test Group 33, HPI-PORV Cooling)
- ML19327B721 + (Multiloop Integral System Test (Mist): Final Report.Test Group 32, SBLOCA with Altered Leak and HPI Configurations)
- ML20246Q021 + (Multiloop Integral System Test (Mist):Final Report. Inter-Group Comparisons)
- ML20059K411 + (Multiloop Integral System Test (Mist):Final Report.Mist Phase IV Tests)
- ML20064A656 + (Multiloop Integral System Test (Mist):Final Report.Mist Phase IV Tests)
- ML20024H123 + (Multiloop Integral System Test (Mist):Final Report.Summary)
- ML20024H122 + (Multiloop Integral System Test (Mist):Mist Facility Functional Specification)
- ML20027E186 + (Multimethods Approach to Safety Parameter Display Evaluation, Interim Rept)
- ML20027B990 + (Multimethods Approach to Safety Parameter Display Evaluation)
- ML20045E348 + (Multinational Design Evaluation Program Vendor Inspection Report of Ensa, Equipos Nucleares S.A. S.M.E, No. 99901379/2019- 201, Notice of Nonconformance)
- ML19331A615 + (Multinational Design Evaluation Program Vendor Inspection Report of Ensa, Equipos Nuclears S.A. S.M.E, 99901379/2019-201, Notice of Nonconformance)
- ML19259C525 + (Multinode Analysis of Small Breaks for B&W 205-Fuel-Assembly Nuclear Plants W/Internals Vent Valves)
- ML19256F762 + (Multiphase Transients W/Coolant & Core Matls in LMFBR Core Disruptive Accident Energetics Evaluations)
- ML031360468 + (Multiple Addressees, Letter Transmitting Report, Operating Experience Assessment - Effects of Grid Events on Nuclear Power Plant Performance)
- ML13101A126 + (Multiple Authors Ltr. Re Edisons Proposed Experimental Restart of the Crippled San Onofre Nuclear Reactors License Amendment and Rigorous Oversight)
- BSEP-95-0220, Multiple Chlorine Sensors Used for Control Bldg Isolation Logic Found to Be Outside TS Tolerances During Routine Calibr + (Multiple Chlorine Sensors Used for Control Bldg Isolation Logic Found to Be Outside TS Tolerances During Routine Calibr)
- ML071300024 + (Multiple Comments (4) Submitted by Progress Energy Third Party Coalitions Consisiting of Resolutions in Support of the Continued Safe and Secure Operation of the Shearon Harris)
- 05000305/FIN-2009002-04 + (Multiple Component Cooling Water Pipes in Close Proximity to High Energy Feedwater Lines)
- ML19253C909 + (Multiple Controlled Cell Removal)
- ML20008F838 + (Multiple DNB Events)
- 05000280/FIN-2015008-04 + (Multiple Design Deficiencies in the Fire Protection Program)
- 05000266/FIN-2010005-05 + (Multiple ESFAS Steam Line Pressure Channel Modules Inoperable Due to Inadequate Calibration Instructions)
- ML26043A277 + (Multiple Emails Transmitting Results of Decommissioning Funding Plan Reviews)
- ENS 43943 + (Multiple Emergency Sirens Lost Power Due to Severe Weather)
- 05000285/FIN-2014009-02 + (Multiple Examples of Failure to Evaluate Operability of Degraded or Non-Conforming Condition)
- 05000285/FIN-2013008-32 + (Multiple Examples of Inadequate RISK-BASED Operability Determinations)
- 05000285/FIN-2013008-31 + (Multiple Examples of Operability Determinations That Lacked Adequate Technical Justification)
- 05000336/FIN-2011008-01 + (Multiple Examples of Procedural Violations and Inadequate Procedures Relating to Control Room Crew Performance During a Plant Transient)
- 05000275/FIN-2018003-01 + (Multiple Examples of Scaffolding in Place Greater Than 90 Days Without Required Evaluation)
- 05000298/FIN-2009005-02 + (Multiple Examples of a Failure to Follow Procedure For Extension Cord Configuration Control)
- 05000266/FIN-2005013-06 + (Multiple Examples of the Failure to Notify the NRC within 8 Hours as Required by 10 CFR 50.72)
- 05000456/FIN-2016002-01 + (Multiple Failure to Follow Procedures Leads to Inadequate Monitoring of Gas Susceptible Locations)
- 05000456/FIN-2014004-02 + (Multiple Failures to Follow Operability Evaluation Process Following Discovery of a Non-Conforming Condition in the Ultimate Heat Sink)
- 05000528/FIN-2013002-01 + (Multiple Failures to Identify Conditions Adverse to Quality)
- ENS 45058 + (Multiple Failures to Meet 24 Hour Reporting Criteria)
- 05000443/FIN-2016002-02 + (Multiple Letdown Isolations Resulting from an Inadequate Procedure and the Performance of Steps Not Prescribed by Established Procedures)
- ML012910122 + (Multiple Letters - NRC Discussion of Comments Received on the Environmental Assessment for the Univ of Missouri-Columbia Construction Permit Recapture Amendment)
- ML013100454 + (Multiple Letters - NRC Discussion of Comments Received on Operational Issues-University of Missouri-Columbia Construction Permit Recapture Amendment (Tac No. MB0850))
- ML18324A626 + (Multiple Letters Dtd 11/01/2018 to Licensees Who Filed for Reciprocity in 2018, Reminder for Initial Reciprocity Filing of NRC Form 241 for Calendar Year 2019)
- ML052060249 + (Multiple Letters and Post Exam Comments (Folder 1))
- ML13324A814 + (Multiple Level Response Spectra Analysis W/Pvrc Variable Damping)
- 05000289/FIN-2010009-03 + (Multiple MSSVs test failures due to improper evaluation of Operating Experience)
- ML061710275 + (Multiple Maps and Drawings: Offsite Sample Results)
- ML14252A893 + (Multiple Notice of Availability of the Final Supplemental Environmental Impact Statement for License Renewal of Grand Gulf, Unit 1)
- ML20101Q923 + (Multiple Notices of Appearance in Proceeding.Certificate of Svc Encl)