| To: | Bernhoft S, Jacobs K, Kenny J, Klapproth J, Lochbaum D, Marion A, Nevius D, Peifer M, Phelps R, Riccio J, Sepp H, Stahlkopf K, Stramback G, Torok R, Vine G BWR Owners Group, Electric Power Research Institute, Florida Power Corp, General Electric Nuclear Energy Owners Group, Institute of Nuclear Power Operations (INPO), North American Electric Reliability Council, Nuclear Energy Institute, Omaha Public Power District, Public Citizen's Critical Mass Energy & Environment Program, Union of Concerned Scientists, Westinghouse |
| Shared Package | |
| ML031360115 | List: |
| References | |
| Download: ML031360468 (8) | |
Text
May 16, 2003 Mr. Alex Marion, Director Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
OPERATING EXPERIENCE ASSESSMENT - EFFECTS OF GRID EVENTS ON NUCLEAR POWER PLANT PERFORMANCE
Dear Mr. Marion:
Enclosed for your review and comment is a copy of a report entitled Operating Experience Assessment-Effects of Grid Events on Nuclear Power Plant Performance, prepared by the Office of Nuclear Regulatory Research (RES). We are seeking comments in the following areas: (1) the reasonableness of the approach, (2) the appropriateness of the conclusions as reflected in the executive summary, and (3) additional sources of data that could be used in the assessment. We plan to revise the report as appropriate to address stakeholder comments and issue the document as a NUREG report.
The assessment was completed by RES to identify changes to grid performance, which could impact nuclear power plants (NPP)safety. The information gathered provides a baseline of grid performance to gauge the impact of deregulation and changes in grid operation. The report provides a comparison and assessment of loss of offsite power (LOOP) experience over two distinct periods of time, before deregulation (1985-1996) and after deregulation (1997-2001).
Insights from the assessment of actual operating data indicate that following deregulation major changes have occurred in several factors important to the risk from a station blackout. They include: 1) the frequency of LOOP events at NPPs has decreased, 2) the percentage of LOOPs duration longer than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> has increased from approximately 17 percent to 67 percent, 3) most LOOP events occurred during the summer months, and 4) the probability of a LOOP as a consequence of a reactor trip has increased by a factor of 5 (from 0.002 to 0.01).
Recognizing that the performance of offsite power is a major factor for assessment of risk, licensees and the NRC need to understand the condition of the grid.
We welcome your comments. To meet our planned issuance schedule, we would appreciate receiving your comments by July 15, 2003.
As you may know, RES reports do not represent official NRC positions. Our reports are one input to an ongoing review and evaluation process.
A. Marion 2
A copy of this letter and report are being sent to other organizations. Both documents are also available as Official Agency Records through the Publicly Available Records System Library at 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852.
If you have any questions regarding this report, please feel free to contact William S. Raughley, E-mail: WSR@NRC.GOV, (301) 415-7577.
Sincerely,
/RA/
Farouk Eltawila, Director Division of Systems Analysis and Regulatory Effectiveness Office of Nuclear Regulatory Research
Enclosure:
As stated (ML031220116, ML031220130)
(ADAMS Package Accession ML031360115)
Identical letters sent to: See enclosed list
A. Marion 3
Letter dated: May 16, 2003
SUBJECT:
OPERATING EXPERIENCE ASSESSMENT - EFFECTS OF GRID EVENTS ON NUCLEAR POWER PLANT PERFORMANCE Identical letters sent to:
Mr. David Nevius, Vice President North American Electric Reliability Council 116-390 Village Boulevard Princeton, NJ 08540-5721 Mr. David A. Lochbaum Union of Concerned Scientists 1616 P Street NW, Suite 310 Washington, D.C. 20036-1495 Mr. Mark Piefer, Vice President Industry and Government Relations Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, GA 30339-5957 Mr. Raymond C. Torok, Project Manager Nuclear Power Group Electric Power Research Institute P.O. Box 10412 Palo Alto, CA 94303 Mr. Gary L. Vine Senior Washington Representative Electric Power Research Institute 2000 L Street NW, Suite 805 Washington, DC 20036 Mr. Karl Stahlkopf, Vice President Power Delivery Electric Power Research Institute P.O. Box 10412 Palo Alto, CA 94303 Mr. James Riccio Critical Mass Energy Project Public Citizen 215 Pennsylvania Ave.SE Washington, DC 20003 Mr. Hank Sepp, PE Manager Regulatory and Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. George B. Stramback Regulatory Services Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 Mr. James F. Klapproth, Manager Engineering & Technology GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 Mr. Karl Jacobs, Chairman Westinghouse Owners Group 123 Main Street 14th Floor White Plains, NY 10601 Mr. Ralph Phelps, Chairman ABB-CE Owners Group Omaha Public Power District Ft. Calhoun Nuclear Station P.O. Box 399 Ft. Calhoun, NE 68023-0399 Mr. James M. Kenny, Chairman BWR Owners Group PPL, Inc.
M/C GENA6-1 Two North Ninth Street Allentown, PA 18101 Ms. Sherry L. Bernhoft, Chairman B&WOG Steering Committee Florida Power Corporation Crystal River Energy Complex 15760 West Power Line St.
Crystal River, FL 34428-6708
A. Marion 2
A copy of this letter and report are being sent to other organizations. Both documents are also available as Official Agency Records through the Publicly Available Records System Library at 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852.
If you have any questions regarding this report, please feel free to contact William S. Raughley, E-mail: WSR@NRC.GOV, (301) 415-7577.
Sincerely,
/RA/
Farouk Eltawila, Director Division of Systems Analysis and Regulatory Effectiveness Office of Nuclear Regulatory Research
Enclosure:
As stated (ML031220116, ML031220130)
(ADAMS Package Accession ML031360115)
Identical letters sent to: See enclosed list Distribution w/encls.:
DSARE R/F REAHFB R/F AThadani, RES JStrosnedier, RES JCalvo, NRR AWang, NRR (Project Manager for General Electric and BWR Owners Group)
DHolland, NRR (Project Manager for B&W Owners Group)
GShukla, NRR (Project Manager for CE Owners Group and Westinghouse)
BBenney, NRR (Project Manager for EPRI)
JBirmingham, NRR (Project Manager for NEI)
- See previous concurrence:
C:\\ORPCheckout\\FileNET\\ML031360468.wpd OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO.: ML031360468 TEMPLATE NO. RES-006 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC May 23, 2003 SENSITIVE? No To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE REAHFB REAHFB C:REAHFB D:DSARE NAME WRaughley:dfw:mmk GLanik JFlack FEltawila DATE 05/16/03* by JFlack 05/16/03* by JFlack 05/16/03* by JFlack 05/16/03*
A. Marion 3
Letter dated: May 16, 2003
SUBJECT:
OPERATING EXPERIENCE ASSESSMENT - EFFECTS OF GRID EVENTS ON NUCLEAR POWER PLANT PERFORMANCE Identical letters sent to:
Mr. David Nevius, Vice President North American Electric Reliability Council 116-390 Village Boulevard Princeton, NJ 08540-5721 Mr. David A. Lochbaum Union of Concerned Scientists 1616 P Street NW, Suite 310 Washington, D.C. 20036-1495 Mr. Mark Piefer, Vice President Industry and Government Relations Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, GA 30339-5957 Mr. Raymond C. Torok, Project Manager Nuclear Power Group Electric Power Research Institute P.O. Box 10412 Palo Alto, CA 94303 Mr. Gary L. Vine Senior Washington Representative Electric Power Research Institute 2000 L Street NW, Suite 805 Washington, DC 20036 Mr. Karl Stahlkopf, Vice President Power Delivery Electric Power Research Institute P.O. Box 10412 Palo Alto, CA 94303 Mr. James Riccio Critical Mass Energy Project Public Citizen 215 Pennsylvania Ave.SE Washington, DC 20003 Mr. Hank Sepp, PE Manager Regulatory and Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. George B. Stramback Regulatory Services Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 Mr. James F. Klapproth, Manager Engineering & Technology GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 Mr. Karl Jacobs, Chairman Westinghouse Owners Group 123 Main Street 14th Floor White Plains, NY 10601 Mr. Ralph Phelps, Chairman ABB-CE Owners Group Omaha Public Power District Ft. Calhoun Nuclear Station P.O. Box 399 Ft. Calhoun, NE 68023-0399 Mr. James M. Kenny, Chairman BWR Owners Group PPL, Inc.
M/C GENA6-1 Two North Ninth Street Allentown, PA 18101 Ms. Sherry L. Bernhoft, Chairman B&WOG Steering Committee Florida Power Corporation Crystal River Energy Complex 15760 West Power Line St.
Crystal River, FL 34428-6708