Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML091610365 + (Map, Wadsworth Quadrangle Texas-Matagorda Co. 7.5 Minute Series (Topographic))
- ML073240568 + (Map,Richmond County TC 2006 City of Augusta)
- ML19344A249 + (Mapleton Intervenors Oppose Applicant 710818 Motion Fixing Date for Discovery Motion Re NEPA Issues.Not Possible to Comprehensively Frame Items to Which Discovery Will Be Requested Until AEC Has Fully Complied W/Calvert Cliffs)
- ML19329F501 + (Mapleton Intervenors Request for Disclosure of ASLB Technical Member Qualifications to Judge Environ Issues. Certification of Svc Encl)
- ML19329F507 + (Mapleton Intervenors Response to Certain Portions of ASLB 711222 Order.Certificate of Svc Encl)
- ML16050A296 + (Maps)
- ML030720185 + (Maps - Figure 3-4 Detailed Transmission Line Map and Figure 3-2 Cooling Water System Schematic. (Dresden))
- ML101730208 + (Maps Braidwood Station)
- ML19259C502 + (Mar 1979 Monthly Highlights, Ofc of Nuclear Regulatory Research Programs,Div of Reactor Safety Research at ORNL)
- ML20115A735 + (Mar 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project)
- ML20115A739 + (Mar 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project)
- ML20062A523 + (Mar 1982 Loft Progress Rept to Foreign Participants, Interim Rept)
- ML20107L108 + (Mar 1996 Wastewater Rept for Davis-Besse Nuclear Power Station)
- ML20138A961 + (Mar 1997 Telecommunicated Hardcopy Wastewater Rept for Davis-Besse Nuclear Power Station)
- ML18074A119 + (Mar 29, 2018 Meeting with NEI and EPRI on GL 2016-01)
- ML102871091 + (Mar 3 Pnsc De Tensioning Briefing P1)
- ML20091K113 + (Mar 31, 2020 BWRVIP-189, Rev 3 Meeting Attendees - Meeting Between the NRC Staff and Electric Power Research Institute (EPRI) MRP-189 Revision 3, B&W-design PWR Internals Ranking and Categorization Report Category 2 Meeting)
- ML20090F972 + (Mar 31, 2020 EPRI MRP-189 Rev 3 Public Meeting with NRC)
- ML102871090 + (Mar 8 Pnsc De Tensioning Briefing)
- ML20076J861 + (Mar Power Generation Group Activities Rept)
- ML070470244 + (Marad, Withholding from Public Disclosure, Consolidated Security Discussion (Attachment a) to License Amendment Request 13, from Public Disclosure)
- ML22196A068 + (Marathon Pipe Line, LLC, NRC Form 591M - Inspection Report 99990003/2022001(DNMS))
- ML22122A325 + (Marathon Watch Company, Ltd. (54-28526-01E), Notice of License Expiration)
- ML18226A295 + (Marathon Watch Company, NRC Form 532, Receipt of Correspondence)
- ML18234A008 + (Marathon Watch Company, Request for Additional Information, 54-28526-01E, NR-0505-D-101-E, Docket No. 03031742, Mail Control 609601, Ssd Case No. 18-37)
- ML25223A281 + (Marathon and Ultra Control Rod Lifetime Surveillance Update)
- ML20236T106 + (Marble Hill Annealing Demonstration Evaluation)
- ML19341D434 + (Marble Hill Project Mgt Organization)
- ML20069F030 + (Marble Hill Project Organization)
- ML22090A288 + (Marc Tannenbaums Invitation to Participate in the 8th Nuclear Regulatory Commissions Workshop on Vendor Oversight)
- ML20002A283 + (March (Meltdown Accident Response Characteristics) Code Description and User Manual)
- ML18072A045 + (March 01, 2018 Summary of the Reactor Oversight Process Working Group Public Meeting)
- ML25085A085 + (March 02, 2023, Summary of Periodic Advanced Reactor Stakeholder Public Meeting)
- ML091530227 + (March 04, 2009, Generic Fundamentals Examination Section Region II, Participant Letter)
- ML082200171 + (March 05000400-08-301 Draft Exam RO Written Exam)
- ML082200269 + (March 05000400-08-301 Exam Administrative Documents)
- ML082200166 + (March 05000400-08-301 Exam Draft ES-401-6 Checklist & Sample Plan)
- IR 05000400/2008301 + (March 05000400-08-301 Exam Draft In-Plant Job Performance Measures)
- ML082200172 + (March 05000400-08-301 Exam Draft SRO Written Exam)
- ML082200212 + (March 05000400-08-301 Exam Final JPMs (Admin))
- ML082200250 + (March 05000400-08-301 Exam Final JPMs (In-Plant))
- ML082200233 + (March 05000400-08-301 Exam Final Outlines)
- ML082200264 + (March 05000400-08-301 Exam Final Simulator Scenarios)
- ML081140063 + (March 05000400/2008301 Combined Ro/Sro Written Exam with Kas, Answers, References)
- ML082200160 + (March 05000400/2008301 Exam Draft Simulator Scenarios)
- ML082200260 + (March 05000400/2008301 Exam Final JPMs (Simulator/ Control Room))
- ML081140038 + (March 05000400/2008301 Exam Post-Exam Comments Ltr Dtd 3-25-08 (No Comments))
- ML081140047 + (March 05000400/2008301 Final RO Written Examination & Reference)
- ML081140054 + (March 05000400/2008301 Final SRO Written Examination & References)
- ML082200154 + (March 0500400/2008301 Exam Draft Admin JPMs)
- ML25079A163 + (March 06 2025 Meeting Summary - NRC Public Meeting with Industry Steam Generator Task Force)