Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "License Amendment 228 Regarding Lead Test Assembly". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML110530159  + (License Amendment 207, Improved Technical Specifications Implementation)
  • ML042920532  + (License Amendment 207, Revise TS Section 3.8.1, AC Sources - Operating, Condition B, to Provide a One-Time Extension of Diesel Generator Allowed Outage Time from 7 Days to 14 Days)
  • ML062130637  + (License Amendment 208 Regarding Emergency Diesel Generator or Automatic Trips Bypass TS 3.8.1)
  • ML061930421  + (License Amendment 210 Core Operating Limits Report)
  • ML021500052  + (License Amendment 210, Revising Maximum Allowable Value of Reactor Protective System Variable High Power Trip Setpoint from 107.0% to 109.0%)
  • ML041400282  + (License Amendment 212 Regarding the Nuclear Services Seawater System)
  • ML052620413  + (License Amendment 212 Revision of the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation)
  • ML022480469  + (License Amendment 212, Remove Existing Scram Function & Group 1 Isolation Valve Closure Functions of Main Steam Line Radiation Monitors)
  • ML080880014  + (License Amendment 214, Request to Support Next Generation Fuel; Review and Approval of ECCS Performance Analysis; and Review and Approval of Supplement to ECCS Performance Analysis)
  • ML060060145  + (License Amendment 215 Regarding Revision to Technical Specification 2.1.1.2 for the Single Loop Operation Safety Limit Minimum Critical Power Ratio (Slmcpr). Cover Letter & Non-Proprietary SE)
  • ML040480377  + (License Amendment 215, Revising the Values and Wording of the Technical Specifications Safety Limit Minimum Critical Power Ratio)
  • ML050960004  + (License Amendment 216 Eliminating of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process)
  • ML051870257  + (License Amendment 216 Revised Action for Scram Discharge Volume Vent and Drain Valves)
  • ML071540001  + (License Amendment 216 to Adopt Technical Specifications Task Force (TSTF) Standard TS Change Traveler, TSTF-447, Using the Consolidated Line Item Improvement Process)
  • ML041660152  + (License Amendment 220, Limiting Safety Systems Settings and Instrumentation)
  • ML050840275  + (License Amendment 221 Extension of Allowed Outage Time for Emergency Diesel Generator Load Sequencer)
  • ML060740214  + (License Amendment 221 Regarding Revised Rod Worth Minmizer Bypass Allowances)
  • ML043360276  + (License Amendment 221, Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors (MC1903))
  • ML042260503  + (License Amendment 222 Regarding Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors)
  • ML050670028  + (License Amendment 222 Regarding Quench Spray and Recirculation Spray Nozzle Surveillance)
  • ML051750678  + (License Amendment 225 Incorporation of Reactor Pressure Vessel Head Drop Analysis Into the Final Safety Analysis Report)
  • ML072850894  + (License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System)
  • ML062430337  + (License Amendment 225 Regarding Revised Reactor Coolant System Leakage Detection Instrumentation Requirements and Actions)
  • ML060740522  + (License Amendment 226 Regarding Minimum Critical Power Ratio Safety Limit)
  • ML072910317  + (License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool)
  • ML053200224  + (License Amendment 228 Regarding Lead Test Assembly)
  • ML060050022  + (License Amendment 229 Regarding Extended Power Uprate)
  • ML023460086  + (License Amendment 232 and 232, Surveillance Frequency for the Containment Spray and Recirculation Spray Nozzles)
  • ML023510446  + (License Amendment 235 Administrative Controls to Reflect Site Integration)
  • ML030170368  + (License Amendment 236, Relocating Technical Specification Requirements for Gas Turbine Generators to Updated Final Safety Analysis Report & Fire Protection Program)
  • ML030660439  + (License Amendment 236, Relocation of Emergency Diesel Generator Maintenance Inspection Requirements)
  • ML031420375  + (License Amendment 237 Regarding 1.4 Percent Power Uprate)
  • ML030900284  + (License Amendment 237 to License DPR-16, Eliminating Requirements for Post-Accident Sampling System)
  • ML060670320  + (License Amendment 238 Regarding Inoperability of Snubbers)
  • ML033160528  + (License Amendment 238, Conversion to Improved Technical Specifications)
  • ML060890283  + (License Amendment 240 and 268, Suppression Chamber-To-Drywell Vacuum Breakers)
  • ML020440315  + (License Amendment 240, Technical Specification Amendment)
  • ML040700390  + (License Amendment 241 Regarding Increasing Flexibility in Mode Restraints)
  • ML061710538  + (License Amendment 241 Regarding Use of M5 Fuel Cladding)
  • ML093360443  + (License Amendment 241 Revision of High Radiation Area Controls)
  • ML051470347  + (License Amendment 241 and 222, RCP Flywheels Inspection Interval Extension)
  • ML050140262  + (License Amendment 246 Regarding Increasing Spent Fuel Pool Maximum Enrichment Limit)
  • ML031490475  + (License Amendment 247, Allowing for One-Time Change to Revise Steam Generator Inspection Frequency Requirements in TS 4.4.5.3.a. to Allow 40-Month Inspection Interval After One Inspection)
  • ML042110014  + (License Amendment 247, Core Spray System Requirements)
  • ML023310270  + (License Amendment 250 Regarding Containment Leakage Rate Testing Program)
  • ML031410048  + (License Amendment 251, License Page 4a, Pertaining to Reactor Building Crane and single-failure Proof)
  • ML032591119  + (License Amendment 252 Revision to Technical Specifications Safety Limit Minimum Critical Power Ratio for Cycle 15 Operation)
  • ML042250520  + (License Amendment 253, Regarding Elimination Requirements for Post-Accident Sampling System)
  • ML050180119  + (License Amendment 253, Revised Technical Specifications, Section 3.2.B.4, Regarding Control Rod Operability Requirements)
  • ML051440520  + (License Amendment 255, Regarding Completion Time for Containment Atmosphere Dilution Subsystem Inoperability)
  • ML050330442  + (License Amendment 257, Modify License Condition 2.C.(2)(b) to Eliminate Main Steam Isolation Valve Closure Test for Extended Power Uprate)