Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Initial Decommissioning Funding Status Report". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20134N698  + (Initial Decision LBP-85-34 Authorizing NRR to Issue Amends to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry.Initial Decision Effective Immediately.Served on 850904)
  • ML19330A930  + (Initial Decision Modifying OL Immediately.Exceptions May Be Filed within 10 Days,Briefs within 30 Days & Supporting or Objecting Briefs within 30 Days of Original Briefs.Decision Shall Constitute Final Action within 45 Days)
  • ML20207J513  + (Initial Decision Ordering Amends 99 & 93 to Licenses DPR-31 & DPR-41,respectively Re Program for Reduction of Neutron Bombardment & Consequent Embrittlement of Pressure Walls,To Remain in Effect W/O Mod)
  • ML20235B683  + (Initial Decision Ordering Director of Regulation to Issue CP to Applicant for Const of Plant to Include Listed Conditions)
  • ML19326A906  + (Initial Decision Ordering Issuance of CP to Toledo Edison Co & Cleveland Electric Illuminating Co.Certificate of Svc Encl)
  • ML19220B666  + (Initial Decision Ordering Issuance of Provisional Cp. Decision Will Constitute Final Action After 40 Days)
  • ML19308C009  + (Initial Decision Ordering Issuance of Provisional CP)
  • ML19329E849  + (Initial Decision Ordering Termination of Proceedings.Also Orders That Initial Decision Constitutes Final Commission Action 45 Days After Issuance Date,Subj to 740121 Memorandum & Order & Notice of Hearing.Certificate of Svc Encl)
  • ML19319C379  + (Initial Decision Permitting Issuance of Const Permit to Util.Initial Decision Is Effective Immediately Upon Issuance & Constitutes Final Decision Subject to Review by AEC)
  • ML20115A725  + (Initial Decision Re City of Los Angeles Application for CP & Class 104 License to Construct & Operate Pwr.City of Los Angeles Authorized to Construct Facility on Condition That Design Criteria Be Modified to Include Ground Displacement)
  • ML20058J546  + (Initial Decision Re Emergency Planning Contentions on Emergency Planning Pamphlet.Pamphlet Shall Be Modified as Listed & Promptly Distributed)
  • ML20066C769  + (Initial Decision Re Nu Request for Approval Under Section 203 of Federal Power Act to Acquire Jurisdictional Assets of Public Svc Co of New Hampshire)
  • ML20062A635  + (Initial Decision Re Proposed Amend for Fuel Storage Pool Mod.License Amend May Be Issued for Expansion of Fuel Storage Pool Per Listed Conditions.Decision Effective Immediately)
  • ML19317F754  + (Initial Decision Stating That Unconditioned Licensing of Plant Would Create & Maintain Situation Inconsistent W/Antitrust Law & Policies Underlying Those Laws)
  • ML19347F523  + (Initial Decision That long-term Mods,W/Addl Changes Completed & Being Undertaken,Are Sufficient to Provide Reasonable Assurance Facility Will Respond Safely to Feedwater Transients)
  • ML20052F876  + (Initial Decision in Investigation to Determine Jurisdiction Requiring Fl Power & Light to File Original Cost Statements)
  • ML19330B771  + (Initial Decision to Issue Appropriate License Amend to License NPF-1 Authorizing Implementation of Mods to Control Bldg)
  • ML20138Q019  + (Initial Decision.* Concludes That Rl Tetrick Had Passing Score of 80% & Should Be Granted License as Sro. W/Certificate of Svc.Served on 970228)
  • ML20205R651  + (Initial Decision.* Initial Decision LBP-87-11 Ordering That Condition Re C Husted Imposed in ALAB-772 Shall Not Be Vacated.Served on 870403)
  • ML20236C139  + (Initial Decision.* Order Authorizing Util to Continue Const Activities of Facilities Authorized Pending Completion of on-going NEPA Review W/Exception That Const Re Removal of Cooling Sys Discharge Cofferdam Be Suspended)
  • ML17083B968  + (Initial Decision.* Sierra Club Contentions Re Licensee Application to Substantially Increase Storage Capacity in Two Spent Fuel Pools at Plant Unfounded.Issuance of License Authorized.Served on 870915)
  • ML20248H986  + (Initial Decision.* Sustains NRC 880615 Order Suspending License Effective Immediately & Denies MP Acosta Application to Renew Operator License.W/Certificate of Svc.Served on 891002)
  • ML20127L313  + (Initial Decision.Director of Regulation Authorized to Issue Provisional CP to NSP)
  • ML19308C013  + (Initial Decisions Ordering Issuances of Provisional CP for TMI-1)
  • CNL-16-153, Initial Decommissioning Funding Plan for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI)  + (Initial Decommissioning Funding Plan for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI))
  • ML25350C176  + (Initial Decommissioning Funding Status Report)
  • ML20065A958  + (Initial Deficiency Rept 67 Re Rockwell Intl Hydrogen Combiners.Reported Equipment Failures During Qualification Testing Corrected Per Vendor Instructions.Also Reported Per Part 21 by Rockwell Intl)
  • TXX-4656, Initial Deficiency Rept CP-85-49 Re Unevaluated Fluid Transient in Two Main Steam Piping Sys.Initially Reported on 851206.Piping Sys Will Be Redesigned to Include Sloping & Addl Drain Pots  + (Initial Deficiency Rept CP-85-49 Re Unevaluated Fluid Transient in Two Main Steam Piping Sys.Initially Reported on 851206.Piping Sys Will Be Redesigned to Include Sloping & Addl Drain Pots)
  • TXX-4657, Initial Deficiency Rept CP-85-52 Re Structural Integrity of Support Sys for Cable Tray Hangers.Initially Reported on 851218.Verification & Insp Activities Will Be Accomplished by Fuel Load  + (Initial Deficiency Rept CP-85-52 Re Structural Integrity of Support Sys for Cable Tray Hangers.Initially Reported on 851218.Verification & Insp Activities Will Be Accomplished by Fuel Load)
  • ML19345D495  + (Initial Deficiency Rept Re 800814 Hydrogen Dilution Fan 2B Trip.Caused by Blade Mounting Bolt Fracture.Fan Hubs & Blades Returned to Joy Mfg Co for Testing)
  • ML20005A532  + (Initial Deficiency Rept Re Nonconformance of Spec Requirements on Approx 20,000 Ft of Rockbestos Cable Delivered to Site.Investigation to Determine Location of Remaining Cable Underway.Results Expected by 810831)
  • ML19350A317  + (Initial Deficiency Rept Re Operator Requalification Program Execution.No Record Exists of Operator walk-through Due Feb 1980.Senior Reactor Operator Has Been Appointed Acting Assistant Reactor Manager.Items Expected Complete by 810430)
  • ML18081B060  + (Initial Deficiency Rept Re Potential Dropped Rod Events Leading to Calculated DNB Ratios Lower than Reported to NRC for Certain Westinghouse Plants.Util Is Investigating Condition for Applicability to Facility)
  • ML19351G561  + (Initial Deficiency Rept Re Tilting or Differential Settlement of Mechanical Electrical Auxiliary Bldg.Approx 11,143 Tons of Backfill Were Removed from Around Bldg & Replaced W/Concrete Placements to Correct Tilt)
  • ML20010F610  + (Initial Deficiency Rept Re Transmitter & Trip Units for Reactor Vessel Water Level Scrams.Incorrect Units Supplied to Several BWR/6 Projects.All Incorrect Units Will Be Replaced.Deficiency Reportable Per Part 21)
  • ML19350E204  + (Initial Deficiency Rept Re Voids in Concrete Under Base Plates.Condition Is Reportable Under 10CFR50.55e.Interim Rept Will Be Provided by 810601)
  • ML20101D375  + (Initial Demonstration of the U.S. NRCs Capability to Conduct a Performance Assessment for a HIGH-LEVEL Waste Repository)
  • ML063310309  + (Initial Disclosure Statement by Pilgrim Watch)
  • ML12184A240  + (Initial Disclosures NRDC Filed Pursuant to 10 C.F.R 2.336(a))
  • ML12184A245  + (Initial Disclosures Pursuant to 10 C.F.R 2.336, Exelon Generation Co, Llc., License Renewal for Limerick Generating Station Units 1 and 2)
  • ML21049A362  + (Initial Discovery Disclosures of the Tennessee Valley Authority)
  • ML030090416  + (Initial Document Request for 03/24/2003 Biennial Safety System Design & Performance Capability Inspection)
  • 05000317/FIN-2009003-03  + (Initial Dose Assessment with the Containment Outage Door Opened)
  • IR 05000272/1991099  + (Initial Draft SALP Repts 50-272/91-99,50-311/91-99 & 50-354/91-99 for 911229-930619)
  • ML19344E554  + (Initial Draft Safety Evaluation on Metallurgy Review)
  • ML20206K432  + (Initial Drum Retrieval,Final Rept)
  • ML023110531  + (Initial EXAM-OCTOBER 2002- Performance Analysis)
  • ML023110530  + (Initial EXAM-OCTOBER 2002-APPLICANT Question)
  • ML20217H458  + (Initial Evaluation of Earthquake Site Response from Garner Valley Downhole Seismic Array:Cooperative Usnrc/Ispn Project, Presented at 970817-22 14th Intl Conference on Structural Mechanics in Reactor Technology in Lyon,France)
  • ML010510268  + (Initial Exam (10/2000) Initial Submittal of the Walkthrough Jpms Week of October 2, 2000)
  • ML010450431  + (Initial Exam (10/2000) JPM OP Test)