Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/FIN-2012010-01 + (Incomplete and inaccurate information provided in Generic Letter 89-10 response)
- 05000293/FIN-2009005-01 + (Incomplete licensed operator medical examinations)
- 05000316/FIN-2012008-02 + (Incomplete methodology for developing acceptance criteria for suction voids)
- Information Notice 2002-36, Incomplete or Inaccurate Information Provided to the Licensee And/Or NRC by Any Contractor or Subcontractor Employees + (Incomplete or Inaccurate Information Provided to the Licensee And/Or NRC by Any Contractor or Subcontractor Employees)
- ML20212M868 + (Incomplete,Unexecuted SECY-86-352 Re Util Request for Exemption from Requirement for full-scale Emergency Preparedness Exercise within 1-yr Prior to OL Receipt. Petitioners Requested Hearing & Submitted Briefs)
- ML18101A878 + (Incompleted Documentation of EDG TS Surveillance)
- ML010510159 + (Incompleted NR-0220-S-120-S)
- 05000220/FIN-2011008-01 + (Inconsistencies Between Non-Safety Related Breaker Preventive Maintenance Templates and Station Practices)
- ML043210373 + (Inconsistencies Between the October 28, 2004 Safety Evaluation and the Revised Security Plans Order EA-03-086 Revised Design Basis Threat)
- ML043210133 + (Inconsistencies Between the October 28, 2004 Safety Evaluation and the Revised Security Plans Order EA-03-086 Revised Design Basis Threat)
- 05000275/FIN-2011004-02 + (Inconsistent Control Room In-Leakage Test Results Reported to NRC)
- 05000305/FIN-2011004-04 + (Inconsistent Maintenance Rule Evaluations Performed on Containment Isolation Valves)
- ML17345B004 + (Incore CET Wiring Diagram Channel B)
- ML17345B002 + (Incore CET Wiring Diagram Channel B)
- ML17345B003 + (Incore CET Wiring Diagram Channel a)
- ML17345B001 + (Incore CET Wiring Diagram Channel a)
- ML17213B146 + (Incore Cet/Spnd Wiring Diagram Channel A. Sheet 1 of 6)
- ML17213B145 + (Incore Cet/Spnd Wiring Diagram Channel B. Sheet 1 of 6)
- ML20148Q903 + (Incore Detection Sys Analysis)
- ML20081K774 + (Incore Detector Algorithm (Pidal) Analysis of Quadrant Power Tilt Uncertainties)
- ML19259C007 + (Incore Insp Region 35 & Region 13 Core Support Block)
- ML20266F364 + (Incore Instrumentation Tube Supports Structural Steel Containment)
- ML20266D962 + (Incore Instrumentation Tube Supports Structural Steel Containment)
- ML032160384 + (Incore Monitoring Instrumentation Nozzle Inspections)
- ML032510339 + (Incore Monitoring Nozzle Inspections)
- ML19224B660 + (Incore Thermocouple Readings)
- ML19224B351 + (Incore Thermocouple Readings on 790328)
- TSTF-212 + (Incorporate Approved Topical BAW-10167, Supplement 3 in SR 3.3.3.1 and SR 3.3.4.1)
- TSTF-059 + (Incorporate CE NPSD-994 Recommendations Into the Sits Specification)
- TSTF-058 + (Incorporate CE NPSD-995 Recommendations Into the ECCS Specification)
- TSTF-368 + (Incorporate CEOG Topical Report to Eliminate Pressure Sensor Response Time Testing)
- TSTF-527 + (Incorporate Model Application Commitments as Reviewer'S Notes)
- NL-18-0102, Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process, Response to Request for Additional Information (RAIs 1,2,3, & 12) + (Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process, Response to Request for Additional Information (RAIs 1,2,3, & 12))
- ML20058F445 + (Incorporates 820609 Revisions to Physical Security Plan)
- ML19326C266 + (Incorporates APL-TOP-1A Revision 4 to QA in Docket & Requests Approval for Implementation)
- ML19326B855 + (Incorporates BAW-1391 Fuel Densification Rept by Ref as Part of OL Application)
- ML20137Q719 + (Incorporates Comments from Region I Matls Radiological Protection Section & Licensing Section Re Draft Rev to 10CFR35 on Qualifications of Physicians Using Licensed Matl. Physician Qualifications Not Regarded)
- ML20082T019 + (Incorporates Editorial Comments Into Util 910215 Application for Amends to Licenses DPR-58 & DPR-74 as Requested During Telcon with NRC)
- ML20040F095 + (Incorporates Into OL Application,Twelve Position Papers Provided by Licensing Review Group II . Plant-unique Submittal Re Issue 1-61B Provided 811023)
- 05000336/LER-1993-007, Incorporates NRC Comments Discussed During 940324 Telcon Into 931217 Application for Amend to License DPR-65,revising TS 3.8.1.1,as Result of LER 93-007-00,dtd 930428 & Util 930726 Response to NOV from Insp Rept 50-336/93-81 + (Incorporates NRC Comments Discussed During 940324 Telcon Into 931217 Application for Amend to License DPR-65,revising TS 3.8.1.1,as Result of LER 93-007-00,dtd 930428 & Util 930726 Response to NOV from Insp Rept 50-336/93-81)
- ML19309E627 + (Incorporates Three Ltr Refs Into 791214 Response to NRC 790911 Request for Info Re Fuel Assembly Guide Thimble Tube Wear.Refs Consist of Tm Anderson 780912,1015 & s to DG Eisenhut)
- ML25149A256 + (Incorporation by Reference (Ibr) - a Tool for Streamlining NEPA Documents)
- PMNS20180815, Incorporation by Reference of American Society of Mechanical Engineers Codes Into the U.S. Nuclear Regulatory Commission Regulations + (Incorporation by Reference of American Society of Mechanical Engineers Codes Into the U.S. Nuclear Regulatory Commission Regulations)
- PMNS20200899, Incorporation by Reference of American Society of Mechanical Engineers Codes Into the U.S. Nuclear Regulatory Commission Regulations + (Incorporation by Reference of American Society of Mechanical Engineers Codes Into the U.S. Nuclear Regulatory Commission Regulations)
- ENS 46138 + (Incorporation of 'Incredible' Criticality Sequences Into Integrated Safety Analysis)
- ML071060126 + (Incorporation of Lead Use Assemblies)
- DCL-04-126, Incorporation of NRC Security Plan Review Team Comments of the Diablo Canyon Power Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan + (Incorporation of NRC Security Plan Review Team Comments of the Diablo Canyon Power Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- DCL-04-134, Incorporation of NRC Security Plan Review Team Comment of October 13, 2004 Into the Plant Physical Security Plan + (Incorporation of NRC Security Plan Review Team Comment of October 13, 2004 Into the Plant Physical Security Plan)
- DCL-04-139, Incorporation of NRC Security Plan Review Team Comment of October 15. 2004, Into the Plant Physical Security Plan + (Incorporation of NRC Security Plan Review Team Comment of October 15. 2004, Into the Plant Physical Security Plan)
- ML20100P765 + (Incorporation of Original PRR 11281 to Rev 5 to Operating Procedure OP-407D, Operation of Miscellaneous Waste Storage Tank)
- ML102780226 + (Incorporation of RAIs and Comments from TR-5 License Renewal Into FSAR)