Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Inadequate Corrective Action Inadvertent Loss of Thermal Barrier HX Flow". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 05000272/FIN-2017007-03  + (Inadequate Corrective Action Regarding Missed Periodic Inspection of 2C EDG AVR Card)
  • 05000336/FIN-2011003-03  + (Inadequate Corrective Action Results in Loss of Enclosure Building\'s Safety Function)
  • 05000327/FIN-2013007-08  + (Inadequate Corrective Action for 2010 Degraded Voltage Issues)
  • 05000456/FIN-2008005-04  + (Inadequate Corrective Action for Containment Spray Add Tank Drain Valve.)
  • 05000333/FIN-2013003-02  + (Inadequate Corrective Action for DHR System Degradation Results in Loss of DHR During R20)
  • 05000336/FIN-2009006-02  + (Inadequate Corrective Action for Degraded Battery Cell)
  • 05000286/FIN-2011010-02  + (Inadequate Corrective Action for Degraded EDG SW Piping)
  • 05000456/FIN-2008005-03  + (Inadequate Corrective Action for Failure to Promptly Correct Auxiliary Tunnel Feedwater Tunnel Hatch Cover Design Deficiencies.)
  • 05000338/FIN-2010005-02  + (Inadequate Corrective Action for Fatigued Fuse Clips in Safety-Related Breakers)
  • 05000220/FIN-2012003-02  + (Inadequate Corrective Action for Instrument Fill and Vent Activities)
  • 05000286/FIN-2015002-01  + (Inadequate Corrective Action for Main Steam Safety Valve 46-3 Failure to Lift at Required Setpoint)
  • 05000271/FIN-2013002-03  + (Inadequate Corrective Action for Maintaining Operability of the LOW Pressure Coolant Injection Battery UPS-1A)
  • 05000285/FIN-2013013-14  + (Inadequate Corrective Action for Non-Seismic Category 1 Piping)
  • 05000334/FIN-2008008-01  + (Inadequate Corrective Action for Potential Blockage of AFW Pump Lube Oil Cooling System Orifices When Supplied by Rw/Sw)
  • 05000336/FIN-2009006-03  + (Inadequate Corrective Action for Safety Related Inverter Out-of-Calibration Results)
  • 05000416/FIN-2011006-04  + (Inadequate Corrective Action for a Leak on the Division II Emergency Diesel Generator Lube Oil Sump)
  • 05000259/FIN-2014002-02  + (Inadequate Corrective Action for sump pump in Hand hole 15 allowing RHRSW pump power cables to be submerged in water without the pump operating.)
  • 05000244/FIN-2012002-01  + (Inadequate Corrective Action on Human Performance Issues Results in Two Trains of Auxiliary Feedwater Inoperable)
  • 05000333/FIN-2010006-03  + (Inadequate Corrective Action on RHRSW Strainer Housing Wall Degradation)
  • 05000317/FIN-2010005-04  + (Inadequate Corrective Action to Address Equipment Repairs in the Material Processing Facility)
  • 05000277/FIN-2010002-01  + (Inadequate Corrective Action to Address Multiple Slow Control Rods with Adverse SSPV Diaphragms)
  • 05000277/FIN-2012002-01  + (Inadequate Corrective Action to Address Emergency Diesel Generator Control Power Circuit Chronic Internal Faults)
  • 05000277/FIN-2012002-02  + (Inadequate Corrective Action to Address Residual Heat Removal Heat Exchanger Graphite Gasket Leaks)
  • 05000272/FIN-2014004-02  + (Inadequate Corrective Action to Prevent Recurrence of Silent Steam Generator Feed Pump Coast-Downs)
  • 05000346/FIN-2007002-02  + (Inadequate Corrective Actions (ISFSI))