- 05000458/FIN-2014007-01 + (Improper Sequencing of Maintenance of 4160 Vac Circuit Breakers Prior to As-Found Tests)
- 05000498/FIN-2013007-02 + (Improper Sequencing of Maintenance of 4160 VAC Circuit Breakers Prior to As-Found Tests)
- 05000315/FIN-2013004-03 + (Improper Setting in Digital Control System)
- ENS 56921 + (Improper Shipment Handling)
- ENS 57632 + (Improper Shipment of Byproduct Materials)
- 05000219/FIN-2009003-03 + (Improper Solder Joint Causes Safety Related Station Battery Charger Failure)
- ENS 55562 + (Improper Source Shipment)
- 05000298/FIN-2008005-06 + (Improper Storage of Hazardous Chemicals)
- 05000289/FIN-2013005-01 + (Improper Storage of Material in Reactor Building)
- 05000285/FIN-2013008-37 + (Improper Storage of the RAW Water to Auxiliary Feedwater Emergency Tank Fill Hose)
- 05000387/FIN-2012005-04 + (Improper Stress Intensification Factor Results in RCS Pressure Boundary Leak)
- 05000293/FIN-2017002-04 + (Improper System Restoration Results in Suppression Pool Inoperability)
- ML20035A440 + (Improper Transfer/Disposal Scenarios for Generally Licensed Devices)
- 05000323/FIN-2018001-01 + (Improper Troubleshooting Results in Reactor Trip Signal and Loss of Source Range Nuclear Instrument Power)
- 05000413/FIN-2012009-03 + (Improper Unit 2 Zone G Modification)
- Information Notice 1993-63, Improper Use of Soluble Weld Purge Dam Material + (Improper Use of Soluble Weld Purge Dam Material)
- ML19031A920 + (Improper Use of Test Leads)
- 05000219/FIN-2008003-01 + (Improper Valve Reassembly Results in Instrument Air Transient)
- ENS 42844 + (Improper Valve Springs in Pressure Relief Valves)
- ML20214G992 + (Improper Weld Rod Used in Diesel Generator Bldg, Nuclear Safety Review Staff Investigation Rept on 851022-1214 Re Employee Concern XX-85-041-001)
- ENS 50888 + (Improper Weld Used on Gate Valve Cover)
- 05000282/FIN-2013004-01 + (Improper Work Instructions Rendered 2R-49 Inoperable)
- 05000282/FIN-2013003-01 + (Improper Work Instructions Rendered D1 EDG Inoperable)
- 05000282/FIN-2013004-02 + (Improper Work Instructions Rendered Reactor Protection Instrument AC Inverter 13 Inoperable)
- 05000247/FIN-2000006-03 + (Improper dissemination of information to public and local official - failure to meet planning standard I0 CFR 50.47 (b) (7), public inform at i o n)
- 05000482/LER-2025-001, Improperly Breached Control Building Doors Cause a Condition Prohibited by Technical Specifications + (Improperly Breached Control Building Doors Cause a Condition Prohibited by Technical Specifications)
- 05000237/FIN-2011004-02 + (Improperly Classifying the Unit 2 and 3 Containment Cooling Service Water (CCSW) Pump Vault Drain Check-Valves as Non-Safety-Related)
- 05000255/FIN-2017004-01 + (Improperly Connected M&TE Leads to Unexpected AFU Fan Trip)
- ENS 46363 + (Improperly Disposed of Tritium Signs)
- ENS 50232 + (Improperly Disposed of Tritium Signs)
- Information Notice 1983-69, Improperly Installed Fire Dampers at Nuclear Power Plants + (Improperly Installed Fire Dampers at Nuclear Power Plants)
- Information Notice 1985-75, Improperly Installed Instrumentation, Inadequate Quality Control and Inadequate Postmodification Testing + (Improperly Installed Instrumentation, Inadequate Quality Control and Inadequate Postmodification Testing)
- 05000397/FIN-2013004-01 + (Improperly Installed Jumper Results in Inoperable Remote Transfer Switch)
- ENS 44158 + (Improperly Installed Steel Angle Supports on Freezer Sublimer Vessel)
- ENS 41875 + (Improperly Labeled Radioactive Material Shipment)
- ENS 44889 + (Improperly Packaged Radioactive Material)
- 05000387/FIN-2012003-04 + (Improperly Performed Maintenance Impacts Secondary Containment)
- 05000282/FIN-2013002-05 + (Improperly Sized Motor Overload Heaters Render D6 EDG Inoperable)
- Information Notice 2013-12, Improperly Sloped Instrument Sensing Lines + (Improperly Sloped Instrument Sensing Lines)
- 05000277/FIN-2016002-01 + (Improperly Stored Material in Reactor Building)
- 05000263/FIN-2008002-01 + (Impropoer Procedure Implementation Results in Unevaluated Preconditioning of MSIVs)
- ML20072E206 + (Improved BENEFIT-COST Techniques in the U.S. Nuclear Regulatory Commission)
- TSTF-476 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- ML20030D736 + (Improved Criticality Search Techniques for LOW- and HIGH-ENRICHED Systems)
- ML20065N462 + (Improved Design Control Documentation for Crystal River Unit 3 Design Basis for Post-Accident Monitoring Instrumentation)
- ML20141A710 + (Improved Diagnostics & Monitoring Methods for Pumps & Related Equipment, Ltr Rept)
- ML20011E242 + (Improved EDDY-CURRENT Inspection for Steam Generator Tubing. Progress Report for January 1985 to December 1987)
- ML20195F659 + (Improved Embrittlement Correlations for Reactor Pressure Vessel Steels)
- ML20084Q959 + (Improved Field Experimental Designs and Quantitative Evaluation of Aquatic Ecosystems)
- ML13206A383 + (Improved Flood Mitigation System - Updated Strategy for FLEX Equipment Storage)