Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "IMC 0308 Reactor Oversight Process Basis Document". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20346A502  + (IMC 0308 Att 3 App D Technical Basis for Public Radiation Safety Significance Determination Process)
  • ML18087A416  + (IMC 0308 Att 3 App F Technical Basis for FP SDP at Power Operations)
  • ML20246G438  + (IMC 0308 Att 3 App G Technical Basis for Shutdown Operations Significance Determination Process)
  • ML20191A308  + (IMC 0308 Att 3 App H Technical Basis for Containment Integrity Significance Determination Process)
  • ML20202A478  + (IMC 0308 Att 3 App K Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process)
  • ML21311A002  + (IMC 0308 Att 3 App L Technical Basis for Extensive Damage Mitigation Guidelines Significance Determination Process)
  • ML20226A074  + (IMC 0308 Att 3 App a Technical Basis for the At-Power Significance Determination Process)
  • ML20308A601  + (IMC 0308 Att 3 App a Technical Basis for the At-Power Significance Determination Process -ROP Public Meeting 11182020)
  • ML21271A120  + (IMC 0308 Att 3 Technical Basis for Significance Determination Process)
  • ML050700153  + (IMC 0308 Att 3, App F, Technical Basis for Fire Protection Significance Determination Process at Power Operations)
  • ML20272A234  + (IMC 0308 Att 5 Technical Basis for Enforcement)
  • ML19116A201  + (IMC 0308 Att 6 Basis Document for Security Cornerstone of the Reactor Oversight Process)
  • ML18291B046  + (IMC 0308 Attachment 03 Appendix M Technical Basis for the Significance Determination Process (SDP) Using Qualitative Criteria)
  • ML23191A533  + (IMC 0308 Attachment 04 Technical Basis for Assessment)
  • ML20262H116  + (IMC 0308 Attachment 1 Technical Basis for Performance Indicators)
  • ML17114A050  + (IMC 0308 Attachment 2 Technical Basis for Inspection Program)
  • ML24120A202  + (IMC 0308 Attachment 2, Technical Basis for Inspection Program)
  • ML25072A255  + (IMC 0308 Attachment 2, Technical Basis for Inspection Program)
  • ML21312A432  + (IMC 0308 Attachment 3 Appendix E, Technical Basis for the Baseline Security Significance Determination Process)
  • ML24150A361  + (IMC 0308 Attachment 3 Appendix F, Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609 Appendix F) at Power Operations)
  • ML21246A285  + (IMC 0308 Attachment 3 Appendix J, Technical Basis for Steam Generator Tube Integrity Findings)
  • ML23335A013  + (IMC 0308 Attachment 3 Appendix K, Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process)
  • ML24257A172  + (IMC 0308 Attachment 3 Technical Basis for Significance Determination Process)
  • ML25182A329  + (IMC 0308 Attachment 3, Appendix I, Technical Basis for Licensed Operator Requalification Significance Determination Process)
  • ML24214A205  + (IMC 0308 Attachment 3, Appendix M, Technical Basis for the Significance Determination Process (SDP) Using Qualitative Criteria)
  • ML25232A186  + (IMC 0308 Attachment 6, Basis Document for Security Cornerstone of the Reactor Oversight Process)
  • ML22125A164  + (IMC 0308 Reactor Oversight Process Basis Document)
  • ML24269A231  + (IMC 0308 Reactor Oversight Process Basis Document)
  • ML23214A382  + (IMC 0308, Attachment 2, Technical Basis for Inspection Program)
  • ML23234A176  + (IMC 0309 Reactive Inspection Decision Basis for Power Reactors)
  • ML25027A460  + (IMC 0309 Reactive Inspection Decision Basis for Power Reactors)
  • ML19011A360  + (IMC 0310 Aspects within the Cross Cutting Areas)
  • ML19197A140  + (IMC 0326 Draft Operability Determinations_8_1)
  • ML19273A878  + (IMC 0326 Operability Determinations)
  • ML19291D493  + (IMC 0326 Operability Determinations Implementation and Staff Training (October 17, 2019))
  • ML23193A962  + (IMC 0327 SG Tube Primary-To-Secondary Leakage)
  • ML18093B067  + (IMC 0327 Steam Generator Tube Primary-to-Secondary Leakage)
  • ML20325A180  + (IMC 0335 Changes Tests and Experiments)
  • ML20325A150  + (IMC 0335 Changes Tests and Experiments - Public Meeting December 1 2020)
  • ML21029A125  + (IMC 0335 Comment Resolution - Public Industry Comments)
  • ML041340685  + (IMC 0350 Meeting Slides)
  • ML021190773  + (IMC 0350 Oversight Panel Memo)
  • ML23271A156  + (IMC 0350 Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance And/Or Operational Concerns)
  • ML17116A273  + (IMC 0350 Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance And/Or Operational Concerns)
  • ML041450337  + (IMC 0350 Panel Process Plan)
  • ML041100408  + (IMC 0350 Panel Process Plan)
  • ML041100151  + (IMC 0350 Panel Process Plan)
  • ML041100449  + (IMC 0350 Restart Checklist, Revision 3)
  • ML20218A563  + (IMC 0375 Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance)
  • ML25204A113  + (IMC 0375, Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance)
  • ML19025A257  + (IMC 0608 Performance Indicator Program)
  • ML24240A098  + (IMC 0608 Performance Indicator Program)