Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20346A502 + (IMC 0308 Att 3 App D Technical Basis for Public Radiation Safety Significance Determination Process)
- ML18087A416 + (IMC 0308 Att 3 App F Technical Basis for FP SDP at Power Operations)
- ML20246G438 + (IMC 0308 Att 3 App G Technical Basis for Shutdown Operations Significance Determination Process)
- ML20191A308 + (IMC 0308 Att 3 App H Technical Basis for Containment Integrity Significance Determination Process)
- ML20202A478 + (IMC 0308 Att 3 App K Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process)
- ML21311A002 + (IMC 0308 Att 3 App L Technical Basis for Extensive Damage Mitigation Guidelines Significance Determination Process)
- ML20226A074 + (IMC 0308 Att 3 App a Technical Basis for the At-Power Significance Determination Process)
- ML20308A601 + (IMC 0308 Att 3 App a Technical Basis for the At-Power Significance Determination Process -ROP Public Meeting 11182020)
- ML21271A120 + (IMC 0308 Att 3 Technical Basis for Significance Determination Process)
- ML050700153 + (IMC 0308 Att 3, App F, Technical Basis for Fire Protection Significance Determination Process at Power Operations)
- ML20272A234 + (IMC 0308 Att 5 Technical Basis for Enforcement)
- ML19116A201 + (IMC 0308 Att 6 Basis Document for Security Cornerstone of the Reactor Oversight Process)
- ML18291B046 + (IMC 0308 Attachment 03 Appendix M Technical Basis for the Significance Determination Process (SDP) Using Qualitative Criteria)
- ML23191A533 + (IMC 0308 Attachment 04 Technical Basis for Assessment)
- ML20262H116 + (IMC 0308 Attachment 1 Technical Basis for Performance Indicators)
- ML17114A050 + (IMC 0308 Attachment 2 Technical Basis for Inspection Program)
- ML24120A202 + (IMC 0308 Attachment 2, Technical Basis for Inspection Program)
- ML25072A255 + (IMC 0308 Attachment 2, Technical Basis for Inspection Program)
- ML21312A432 + (IMC 0308 Attachment 3 Appendix E, Technical Basis for the Baseline Security Significance Determination Process)
- ML24150A361 + (IMC 0308 Attachment 3 Appendix F, Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609 Appendix F) at Power Operations)
- ML21246A285 + (IMC 0308 Attachment 3 Appendix J, Technical Basis for Steam Generator Tube Integrity Findings)
- ML23335A013 + (IMC 0308 Attachment 3 Appendix K, Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process)
- ML24257A172 + (IMC 0308 Attachment 3 Technical Basis for Significance Determination Process)
- ML25182A329 + (IMC 0308 Attachment 3, Appendix I, Technical Basis for Licensed Operator Requalification Significance Determination Process)
- ML24214A205 + (IMC 0308 Attachment 3, Appendix M, Technical Basis for the Significance Determination Process (SDP) Using Qualitative Criteria)
- ML25232A186 + (IMC 0308 Attachment 6, Basis Document for Security Cornerstone of the Reactor Oversight Process)
- ML22125A164 + (IMC 0308 Reactor Oversight Process Basis Document)
- ML24269A231 + (IMC 0308 Reactor Oversight Process Basis Document)
- ML23214A382 + (IMC 0308, Attachment 2, Technical Basis for Inspection Program)
- ML23234A176 + (IMC 0309 Reactive Inspection Decision Basis for Power Reactors)
- ML25027A460 + (IMC 0309 Reactive Inspection Decision Basis for Power Reactors)
- ML19011A360 + (IMC 0310 Aspects within the Cross Cutting Areas)
- ML19197A140 + (IMC 0326 Draft Operability Determinations_8_1)
- ML19273A878 + (IMC 0326 Operability Determinations)
- ML19291D493 + (IMC 0326 Operability Determinations Implementation and Staff Training (October 17, 2019))
- ML23193A962 + (IMC 0327 SG Tube Primary-To-Secondary Leakage)
- ML18093B067 + (IMC 0327 Steam Generator Tube Primary-to-Secondary Leakage)
- ML20325A180 + (IMC 0335 Changes Tests and Experiments)
- ML20325A150 + (IMC 0335 Changes Tests and Experiments - Public Meeting December 1 2020)
- ML21029A125 + (IMC 0335 Comment Resolution - Public Industry Comments)
- ML041340685 + (IMC 0350 Meeting Slides)
- ML021190773 + (IMC 0350 Oversight Panel Memo)
- ML23271A156 + (IMC 0350 Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance And/Or Operational Concerns)
- ML17116A273 + (IMC 0350 Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance And/Or Operational Concerns)
- ML041450337 + (IMC 0350 Panel Process Plan)
- ML041100408 + (IMC 0350 Panel Process Plan)
- ML041100151 + (IMC 0350 Panel Process Plan)
- ML041100449 + (IMC 0350 Restart Checklist, Revision 3)
- ML20218A563 + (IMC 0375 Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance)
- ML25204A113 + (IMC 0375, Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance)
- ML19025A257 + (IMC 0608 Performance Indicator Program)
- ML24240A098 + (IMC 0608 Performance Indicator Program)