Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19209C868 + (Human Reliability in Monitoring Power Plant Operations)
- ML18305A362 + (Human Resources Management System (Hrms) Pia)
- ML21025A267 + (Human Resources Management System Cloud (Hrmsc) Privacy Impact Assessment (Pia))
- ML20046D362 + (Human Resources Strategic Planning within the Nuclear Regulatory Commission.A Guide for Office Directors,Regional Administrators,Managers,Supervisors)
- ML20216A923 + (Human-Sys Interface Design Process & Review Criteria)
- ML25153A599 + (Human-System Interaction in Nrc’S Risk-Informed Framework for Advanced Reactors: an Overview of 10 CFR Part 53 and Self-Reliant Mitigation Facilities (Srmfs))
- ML22140A335 + (Humberstonem-hv-w12)
- ML22145A209 + (Humberstonem-w12-bio)
- ML083430489 + (Humbold Bay, Unit 3, Weighting Factors RAI Response Email)
- ML083430517 + (Humbold Bay, Unit 3, Weighting Factors RAI Response, SE Input)
- NRC-2010-0346, Humboldt Bay 20.2002 EA + (Humboldt Bay 20.2002 EA)
- HBL-14-016, Humboldt, Unit 3 and ISFSI - License Amendment Request for Proposed Revision to Humboldt Bay Site Emergency Plan + (Humboldt, Unit 3 and ISFSI - License Amendment Request for Proposed Revision to Humboldt Bay Site Emergency Plan)
- ML17115A107 + (Humbolt Bay Partial Site Release)
- ML023240595 + (Humbolt Bay Power Plant Unit 3, License Amendment, Converting Current Technical Specifications to Set of Permanently Defueled Technical Specifications Based on Format Consistent with Standard Technical Specifications (NUREG-1430 Through NUR)
- ML023250203 + (Humbolt Bay Power Plant Unit 3, Technical Specifications (Ts), Converting Current TS to Set of Permanently Defueled Technical Specifications Based on Format Consistent with Standard Technical Specifications (NUREG-1430 Through NUREG-1434))
- ML083450035 + (Humbolt Bay Power Plant, Unit 3 - Approval to Use Effective Dose Equivalent Weighting Factors for External Radiation Exposure)
- ML101310177 + (Humbolt Bay Power Plant, Unit 3, Issuance of Amendment Deletion of Fuel Storage Pool Liner Water Level Technical Specification)
- ML023240460 + (Humbolt Bay, Biweekly Notice Memo, Notice of Issuance of Amendment 34 to License DPR-7, Replacing the Current TS with Set of Permanently Defueled TS to Reflect the Permanently Defueled Condition of the Plant)
- ML101310196 + (Humbolt Bay, Unit 3, Technical Specifications)
- ML22140A336 + (Hunterc-hv-th21)
- ML22145A278 + (Hunterc-th21-bio)
- ML19204A146 + (Hurricane Barry)
- ENS 40166 + (Hurricane Force Winds within 500 Nautical Miles of Plant)
- ENS 53601 + (Hurricane Notification Per Technical Requirement for Hurricane Florence)
- ENS 47203 + (Hurricane Notification Per Technical Requirements Manual)
- ML19319D432 + (Hurricane Protection Positions)
- ENS 52957 + (Hurricane Warning Issued Affecting Site within 36 Hours)
- ENS 50258 + (Hurricane within 500 Nautical Miles of the Facility)
- ENS 46226 + (Hurricane within 500 Nautical Miles of the Facility)
- ML20280A447 + (Hutchinson - Spatial Analysis of the Charleston Fault Rev 1)
- ML18127B060 + (Hutchinson Island ,Unit 1 - Drawing 8770 B-276, Revision 1, Control & Block Diagram. Sheet 25.3)
- ML18127B270 + (Hutchinson Island - Drawing 8770551, Rev. 15, Electrical Schematic Hutchinson Island Safety Features Actuation System)
- ML18127A955 + (Hutchinson Island -Drawing No. 59N17-5, Revision M Electrical Schematic, Sheet 1 of 4)
- ML18127B002 + (Hutchinson Island Plant No. 1 - Drawing No. 8770-G 664-1, Revision 5 Circulating Water System Ocean Intake & Discharge Profile)
- ML18127A976 + (Hutchinson Island Plant No. 1 - Drawing No. 8770-G-227, Revision 5, Reactor Auxiliary Building Instrument Arrangement Sheet 4 of 4)
- ML18127A983 + (Hutchinson Island Plant No. 1 - Drawing No. 8770-G-374, Revision 20 Reactor Aux. Bldg. Penetration Area Conduit Trays and Grounding Sh 1)
- ML18127A962 + (Hutchinson Island Plant Unit 1 - Drawing No. 8770-G-226, Revision 7 Reactor Building Instrument Arrangement Sht. 2 of 3)
- ML18144A738 + (Hutchinson Island Plant Unit 1 - Forwards 1970 Annual Report)
- ML17312A033 + (Hutchinson Island Plant Unit 1 1973 890MW Installation Control & Block Diagram)
- ML17317A382 + (Hutchinson Island Plant Unit 1 Cable and Conduit List Installation Details.Sheet 10)
- ML17317A030 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Station Auxiliaries a Annunciator B Sh 2 RTGB 101.Sheet 1021)
- ML17317A029 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Station Auxiliaries a Annunciator B Sh 1 RTGB 101.Sheet 1020)
- ML17312A245 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram List of Abbreviations.Sheet 11)
- ML17312A134 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Engineered Safeguards Annunciator Q Sh 2 RTGB 106.Sheet 365)
- ML17312A149 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Waste Management Annunciator N Sh 2 RTGB 105.Sheet 590)
- ML17312A247 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram List of Abbreviations.Sheet 14)
- ML17312A136 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Engineered Safeguard Annunciator P Sh 1 RTGB 106.Sheet 366)
- ML17317A027 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Diesel Generator 1A Ann Front View. Sheet 961)
- ML17317A024 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Circulating Intake & Cooling Water Annunciator E Sh 2 RTGB 102.Sheet 842)
- ML17312A249 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram List of Abbreviations.Sheet 15)
- ML17317A025 + (Hutchinson Island Plant Unit 1 Control Wiring Diagram Generator Main & Aux Transf Annunciator C Sh 1 RTGB 101.Sheet 861)