Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22322A275 + (HOL010 - Mission Plan for the Civilian Radioactive Waste Management Program (June 1985))
- ML22322A276 + (HOL011 - Ocrwm Mission Plan Amendment (June 1987))
- ML22322A277 + (HOL012 - Office of Civilian Radioactive Waste Management Annual Capacity Report (June 1987))
- ML22322A278 + (HOL013 - Curriculum Vitae of Christopher F. Tierney)
- ML22322A279 + (HOL015 - Resume of James B. Buckley, Jr)
- ML22322A280 + (HOL021 - Resume of Allen Goulette)
- ML20265B761 + (HOUSING,PREA-MP Rvd)
- ML20266C334 + (HP 2 Piping from Hpc I Pump)
- ML22229A479 + (HP Baseline Inspection Document Request)
- ML22031A177 + (HP Comments on Cimarron Responses Rev. 1)
- ML22038A061 + (HP Comments on Cimarron Responses_Epm)
- ML20027A029 + (HP Position:New Training Rule for Nuclear Power Plant Personnel)
- 05000354/FIN-2010002-02 + (HPCI Booster Pump Outboard Bearing Low Oil Level and Leak)
- ML20265C936 + (HPCI Boundary Diagram. No Rev Date)
- ML20265C932 + (HPCI Boundary Diagram. No Rev Date)
- ENS 55423 + (HPCI Declared Inoperable)
- ENS 57582 + (HPCI Declared Inoperable)
- 05000293/LER-1979-050-03, HPCI Exhaust Line Snubber SS-23-3-31 Strut Assembly Found Bent & Thread Assembly Out of Wall Mount.Caused by Transient Hydro Shock. Snubbers Upgraded & Addl Snubbers Added + (HPCI Exhaust Line Snubber SS-23-3-31 Strut Assembly Found Bent & Thread Assembly Out of Wall Mount.Caused by Transient Hydro Shock. Snubbers Upgraded & Addl Snubbers Added)
- 05000321/LER-1980-069-01, HPCI Failed to Inject to Reactor Pressure Vessel After Receiving Auto Initiation Signal Due to Isolating on Steam Line High Dp.Caused by Poor Turbine Speed Control Calibr & Operability Procedures + (HPCI Failed to Inject to Reactor Pressure Vessel After Receiving Auto Initiation Signal Due to Isolating on Steam Line High Dp.Caused by Poor Turbine Speed Control Calibr & Operability Procedures)
- 05000254/FIN-2014005-01 + (HPCI Flood Barrier Degraded)
- 05000293/LER-1982-013-03, HPCI High Temp Switch TS2373C,contributing to Trip Logic of HPCI Turbine,Did Not Actuate.Caused by Heat Gun Reducing Output & Air Currents in Area of Switches During Test.Heat Output to Be Shielded + (HPCI High Temp Switch TS2373C,contributing to Trip Logic of HPCI Turbine,Did Not Actuate.Caused by Heat Gun Reducing Output & Air Currents in Area of Switches During Test.Heat Output to Be Shielded)
- ENS 55403 + (HPCI Inoperability)
- 05000353/LER-1918-001, HPCI Inoperability Due to Discharge Check Valve Failure to Close + (HPCI Inoperability Due to Discharge Check Valve Failure to Close)
- 05000354/LER-2008-003, HPCI Inoperability Due to Instrument Failure Initiated Turbine Trip + (HPCI Inoperability Due to Instrument Failure Initiated Turbine Trip)
- 05000387/LER-2011-003, HPCI Inoperability Due to Valve Packing Leak + (HPCI Inoperability Due to Valve Packing Leak)
- 05000237/LER-2023-001, HPCI Inoperable Due to Air Void Accumulation + (HPCI Inoperable Due to Air Void Accumulation)
- 05000352/LER-2021-001, HPCI Inoperable Due to Remote Shutdown Panel Switch Failure + (HPCI Inoperable Due to Remote Shutdown Panel Switch Failure)
- ML061450508 + (HPCI Line Piping Replacement Status)
- 05000249/LER-2002-001, HPCI Not in Standby Operation When Required by the Technical Specifications + (HPCI Not in Standby Operation When Required by the Technical Specifications)
- 05000354/FIN-2011004-02 + (HPCI Operability during SBLOCA/LOOP with the A EDG Failure)
- 05000388/FIN-2016002-07 + (HPCI Overridden Prior to Manual Reactor Scram)
- ML20265B324 + (HPCI Pump Turbine)
- 05000259/LER-2077-002, HPCI Restraints R-24 & R-35 on Pump Discharge Line Were Discovered with Loose Bolts & Broken Cinch Anchors Upon Completion of Operation of HPCI System During Reactor Scram on 1/26/1977 + (HPCI Restraints R-24 & R-35 on Pump Discharge Line Were Discovered with Loose Bolts & Broken Cinch Anchors Upon Completion of Operation of HPCI System During Reactor Scram on 1/26/1977)
- ML20260D614 + (HPCI Routing of Associated Circuits by Fire Zone. Sheet 5A)
- 05000331/FIN-2008005-01 + (HPCI Steam Exhaust Vacuum Breaker Piping Configuration Not in Conformance with Piping Design Basis Analysis of Record)
- 05000259/LER-2076-015, HPCI Steamflow Indicators (Pdis 73-1A & -1B) Were Reading Low During Startup Testing + (HPCI Steamflow Indicators (Pdis 73-1A & -1B) Were Reading Low During Startup Testing)
- 05000366/LER-1980-150-03, HPCI Steamline Pressure a Logic Did Not Auto Isolate Until 89 Psig.Possibly Caused by Switches Not Environmentally Qualified.Switches to Be Replaced by Analog Transmitter Sys + (HPCI Steamline Pressure a Logic Did Not Auto Isolate Until 89 Psig.Possibly Caused by Switches Not Environmentally Qualified.Switches to Be Replaced by Analog Transmitter Sys)
- 05000278/LER-1982-026-03, HPCI Sys Declared Inoperable to Investigate Delayed Opening of Turbine Stop Valve Upon Sys Initiation.Caused by Failure of Corroded Steam Trap to Drain Inlet Steam Line.Trap Rebuilt + (HPCI Sys Declared Inoperable to Investigate Delayed Opening of Turbine Stop Valve Upon Sys Initiation.Caused by Failure of Corroded Steam Trap to Drain Inlet Steam Line.Trap Rebuilt)
- 05000366/LER-1980-101-03, HPCI Sys Failed to Manual Start Due to Failure of F006 HPCI Injection Valve.Caused by Motor Winding Failure Due to Design Problem.Motor Replaced. Valve Tested & Returned to Svc + (HPCI Sys Failed to Manual Start Due to Failure of F006 HPCI Injection Valve.Caused by Motor Winding Failure Due to Design Problem.Motor Replaced. Valve Tested & Returned to Svc)
- 05000260/LER-1978-014-03, HPCI Sys Sustained Damage to High Pressure Pump & Reduction Gear Set Which Drives Low Pressure Pump.Caused by Failure to Open Valve in Lubrication Oil Line.Instruction Revised + (HPCI Sys Sustained Damage to High Pressure Pump & Reduction Gear Set Which Drives Low Pressure Pump.Caused by Failure to Open Valve in Lubrication Oil Line.Instruction Revised)
- 05000293/LER-2008-005, HPCI System Declared Inoperable During Surveillance Testing Due to Human Error + (HPCI System Declared Inoperable During Surveillance Testing Due to Human Error)
- 05000277/FIN-2018003-01 + (HPCI System Exhaust Pressure Switches Exceeded Documented Qualified Life)
- 05000354/LER-2007-004, HPCI System Inoperability Due to Feedwater Injection Valve Failure to Stroke Open + (HPCI System Inoperability Due to Feedwater Injection Valve Failure to Stroke Open)
- 05000254/LER-2019-001, HPCI System Inoperable Due to Blown Fuse in the Motor Speed Changer Circuit + (HPCI System Inoperable Due to Blown Fuse in the Motor Speed Changer Circuit)
- 05000333/FIN-2014002-01 + (HPCI System Inoperable for Longer than Allowed by TS)
- 05000259/FIN-2018002-01 + (HPCI System Over Pressurization due to Failure to Maintain Procedure)
- ML20260D621 + (HPCI System Routing of Associated Circuits by Fire Zone. Sheet 5B)
- ML20260D318 + (HPCI System Routing of Associated Circuits by Fire Zone. Sheet 7A)
- ML20260D325 + (HPCI System Routing of Associated Circuits by Fire Zone. Sheet 7B)
- ML20265F349 + (HPCI System Sheet 1 ISI Boundary Diagram)