Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Request for Addl Info Re Cycle 2 Reload Rept". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17212B299  + (Forwards Request for Addl Info Re Core Performance.Response Requested by 820115)
  • ML19274G162  + (Forwards Request for Addl Info Re Core Performance,To Continue FSAR Evaluation)
  • ML16341B432  + (Forwards Request for Addl Info Re Core Performance to Complete OL Application Review.Outstanding Items Include Descriptions of Racks & Assumptions Made in Analysis Re Fuel Reactivity,Pool Water Temp & Assembly Placement)
  • ML17059A683  + (Forwards Request for Addl Info Re Core Shroud Repair for Plant,Per 950106 & 23 Applications.Response Requested by 950228)
  • ML17180B310  + (Forwards Request for Addl Info Re Core Shroud Repair for Plant Units 2 & 3)
  • ML17212A598  + (Forwards Request for Addl Info Re Core Thermal Dynamics,To Review Stretch Power Application)
  • ML20010F635  + (Forwards Request for Addl Info Re Core Thermal Hydraulics, in Support of Review of OL Application Fsar.Response Requested by 810831)
  • ML20037D554  + (Forwards Request for Addl Info Re Core Thermal Hydraulics. Response Requested by 811001)
  • ML20155F210  + (Forwards Request for Addl Info Re Core Uprate.Analysis or Justification That 2-inch Small Break LOCA for Plant Similar to North Anna Should Be Provided.Date for Submitting Response Requested within 15 Days of Ltr Receipt)
  • ML19347E040  + (Forwards Request for Addl Info Re Corrosion Engineering for FSAR Review.List of Matls & Specs Used for Each Component of Control Rod Drive Mechanism Should Be Provided.Response Requested by 810508)
  • ML20203J815  + (Forwards Request for Addl Info Re Corrosion Due to Chloride Contamination.Response Requested within 45 Days of Ltr Date)
  • ML20041C181  + (Forwards Request for Addl Info Re Cost Estimates,Sources of Funds,Rate Relief Requests & Financial Statistics to Continue CP Application Review.Response by 820331 Requested)
  • ML19323H359  + (Forwards Request for Addl Info Re Cracking in Low Pressure Turbine Discs.Recommends Development of Ultrasonic Insp for Next Fuel Outage.Ie Info Notice 79-37 & Summary of 800109 Meeting W/Ge Encl)
  • ML19323H411  + (Forwards Request for Addl Info Re Cracking in Low Pressure Turbine Discs.Recommends Development of Schedule for Ultrasonic Insp During Next Fuel Outage.Ie Info Notice 79-37 & Summary of 800109 Meeting W/Ge Encl)
  • ML19323G136  + (Forwards Request for Addl Info Re Cracks in Keyway & Bore Sections of Discs in Westinghouse Low Pressure Turbines. Summary of Related 800109 Meeting,Ie Info Notice 79-37 & Errata Encl)
  • ML19323G130  + (Forwards Request for Addl Info Re Cracks in Keyway & Bore Sections of Discs in Westinghouse Low Pressure Turbines. Summary of Related 800109 Meeting,Ie Info Notice 79-37 & Errata Encl)
  • ML19323G131  + (Forwards Request for Addl Info Re Cracks in Keyway & Bore Sections of Discs in Westinghouse Low Pressure Turbines. Summary of Related 800109 Meeting,Ie Info Notice 79-37 & Errata Encl)
  • ML19323G208  + (Forwards Request for Addl Info Re Cracks in Keyway & Bore Sections of Discs in Westinghouse Low Pressure Turbines. Summary of Related 800109 Meeting,Ie Info Notice 79-37 & Errata Encl)
  • ML19323G265  + (Forwards Request for Addl Info Re Cracks in Keyway & Bore Sections of Discs in Westinghouse Low Pressure Turbines. Recommends Ultrasonic Insp During Next Major Outage.Ie Info Notice 79-37 & Related Documents Encl)
  • ML17215A481  + (Forwards Request for Addl Info Re Creep Collapse in C-E Fuel Remaining in-core for Resolution of License Condition Imposed in Amend 63 to License DPR-67)
  • ML20210T253  + (Forwards Request for Addl Info Re Criteria for Underground Cable Installations for Class 1E Sys.Info Needed to Complete Review of Application)
  • ML17194A663  + (Forwards Request for Addl Info Re Criteria for Evaluating Exemption Request & Design Descriptions of Mod Required to Meet Section III.G.3 of App R to 10CFR50 & 10CFR50.48(C)(5), Alternative Safe Shutdown)
  • ML17054A114  + (Forwards Request for Addl Info Re Criticality Analysis Supporting Requested Spent Fuel Pool Expansion.Request Formally Documents 830823 Telex Request.Response Must Be Submitted in Time to Complete NRC Review by 830930)
  • ML20199J359  + (Forwards Request for Addl Info Re Crystal River 3 Nuclear Plant,Summary Rept on Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,)
  • ML17278B047  + (Forwards Request for Addl Info Re Current Condition of Unit 2 Compared to Regulations,License & Commitments to Fire Protection Program.Requests Response within 30 Days of Ltr Receipt)
  • ML19347E554  + (Forwards Request for Addl Info Re Cycle 2 Reload Rept)
  • ML20041G301  + (Forwards Request for Addl Info Re Cycle 6 Phase Ii.Info Should Be Provided within 30 Days)
  • ML19319A896  + (Forwards Request for Addl Info Re Cycle 3 Reload Application.W/O Encl)
  • ML20133N775  + (Forwards Request for Addl Info Re Cycle 9 Reload Including Explanation of Addl Margin for Future Cycles in Changes to Tech Spec Figures 2.1-2,3.10-2,3.10-3,3.10-9 & 3.10-10)
  • ML19343D154  + (Forwards Request for Addl Info Re Cycle 2 Reload Rept & Supporting Documents.Complete Description of Cetop Program Methodology,Algorithm & Usage for Reload Should Be Provided)
  • ML15223A701  + (Forwards Request for Addl Info Re Cycle 6 Reload.Nrc Assumptions Discussed in Encl Should Be Verified as Correct & Applicable to Facility for Proposed Cycle of Operation)
  • ML20024F027  + (Forwards Request for Addl Info Re Cycle 2 Reload.Response Requested by 830909)
  • ML19352A344  + (Forwards Request for Addl Info Re Cycle 2 Reload Rept & Instrumentation & Controls Sys in Response to Util 810220 & 0305 Submittals.Questions Re Other Issues Addressed in 800829 Submittal Provided)
  • ML17215A696  + (Forwards Request for Addl Info Re Cycle 2 Reload to Complete Review of Application to Amend License NPF-16)
  • ML19210A714  + (Forwards Request for Addl Info Re Cycle 2 Reload.Requests Response within 10 Days of Receipt of This Ltr)
  • ML20211C720  + (Forwards Request for Addl Info Re DOE 750926 Request for Review of Model AL-L8)
  • ML19326A804  + (Forwards Request for Addl Info Re Decay Heat Pump 1A Shaft Failure Per 780707 Submittal)
  • ML20198K878  + (Forwards Request for Addl Info Re Decommissioning Plan & License Termination Request for Facility License R-97 for Georgia Tech Research Reactor Submitted on 980701)
  • ML20213A644  + (Forwards Request for Addl Info Re Decommissioning Plan Supporting Application for Authorization to Decommission Facility.Response Requested within 30 Days)
  • ML20248J995  + (Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity)
  • ML20236C938  + (Forwards Request for Addl Info Re Decommissioning Phase II Plan Submitted on 880610 & Suppls on 880621 & 1207.Response Requested within 15 Days of Ltr Date)
  • ML20205E807  + (Forwards Request for Addl Info Re Decommissioning Plan. Response Requested by 851121)
  • ML20055E044  + (Forwards Request for Addl Info Re Decommissioning Plan, Submitted by .Response Requested within 30 Days of Ltr Date)
  • ML20059K104  + (Forwards Request for Addl Info Re Decommissioning Funding Plan)
  • ML20028H408  + (Forwards Request for Addl Info Re Decommissioning Plan)
  • ML13330A170  + (Forwards Request for Addl Info Re Dedicated Shutdown Sys for Fire Protection.Info Requested within 45 Days of Ltr Receipt)
  • ML17298A886  + (Forwards Request for Addl Info Re Deficiency Rept DER 81-35 Concerning Leaks in Temporary Water Lines That Distributed Backfill Under Seismic Category I Structures.Responses Requested within 2 Wks of Ltr Receipt)
  • ML20052B117  + (Forwards Request for Addl Info Re Deficiencies in Structural Steel Bolting Mfg by Morrison-Knudson)
  • ML19350D518  + (Forwards Request for Addl Info Re Degraded Grid Protection for Class IE Power Sys within 45 Days)
  • ML20049H558  + (Forwards Request for Addl Info Re Degraded Grid Voltage Protection.W/O Encl)
  • ML14190A318  + (Forwards Request for Addl Info Re Degraded Grid Voltage in Order to Review Util 790124 Submittal)