_ _ _ _ _ _.
~
'/.
'o UNITED STATES
' g, E'
NUCLEA'R REG'ULATORY COMMISSION
.,, 7 [ g 3"
/
C WASHIN 3 TON, D. C. 20555 3
(PR10jggg Y, ]\\g,,% g+
/4
....+
Docket No.:
STN 50-483 yb(
8 3
&pQ
']
Mr. John K. Bryan 9
Vice President e
Union Electric Company g' #
e M9 1901 Gratiot Street
'A dE P. O. Box 149 St. Louis, Missouri 63166
Dear Mr. Bryan:
Subject:
Request for Additional Infonnation for the Review of the Callaway Plant, Unit 1 As a result of our continuing review of the Callaway Plant, Unit 1 FSAR, we find that we need additional information to complete our evaluation. The specific information required is in the area of corrosion engineering and is presented in the Enclosure.
To maintain our licensing review schedule for the Callaway Plant FSAR, we will need responses to the enclosed request by May 8, 1981.
If you cannot meet this date, please inform us within seven days after receipt of this letter on the date you plan to submit your responses so that we may review our schedule for any necessary changes.
Please contact Mr. Dromerick, Callaway Licensing Project Manager, if you desire any discussion or clarification of the enclosed request.
Sincerely, S M ac3 Robert L. Tedesco, Assistant Director for Licensing Division of Licensing
Enclosure:
As stated cc:
See next page 810415003%
Wh
fir. J. K. Bryan Vice President - Nuclear Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 cc: Mr. Nicholas A. Petrick Mr. William Hansen Executive Director - SNUPPS Resident Insoector/Callaway NPS 5 Choke Cherry Road c/o USNRC Rockville, Maryland 20850 Steednan, Missouri 65077 Gerald Charnoff, Esq.
l -
Shaw, Pittman, Potts &
Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 Mr. J. E. Birk Assistant to the General Ccuissel linion Electric Company P. O. Box 149 St. Louis, Missouri 63166 Dr. Vern Starks Route 1, Box 863 Ketchikan, Alaska 99901 Ms. TrevaHearn, Assistant General Counsel Missouri Public Service Commission P. O. Box 360 Jefferson City, Missouri 65102 Mr. D. F. Schnell Manager-Nuclear Engineering Union Electric Company P. O. Box 149 St. Louis, Missouri 63166 9
I
. l
~
ENCLOSURE 1
1 UNION ELECTRIC COMPANY SNUPPS - CALLAWAY PLANT, UNITS 1 & 2 DOCKET NUMBERS STN-50-483 AND 50-486
~
282.0 282.1 To evaluate the compatibility of the control rod drive structural 4.5.1 materials with the reactor coolant water, provide the list of materials and specifications which are used for each co ponent of the control rod drive mechanism.
The information in the FSAR does not adequately identify the materials.
282.2 Provide the following on your secondary water chemistry control and 10.3.5 monitoring programs:
1.
Sampling schedule for the critical parameters and of control points for these parameters for the cold startup mode of operation; 2.
Procedures used to measure the values of the critical parameters; 3.
Procedure for the recording and management of data; 4.
Procedures defining corrective actions
- for off-control point chemistry conditions; and 5.
A procedure identifying (a) the authority responsible for the inter-pretation of the data and (b) the sequence and timing of administra-tive events required to initiate corrective action.
Verify that the steam generator secondary water chemistry control program incorporates technical recommendations of the NSSS. Any significant deviations from NSSS recommendations should be noted and justified technically.
'f
- Branch Technical Position MTEB 5-3 describes the acceptable reans for monitoring secondary side water chemistry in PWR steam generators, including corrective actions for off-control point chemistry conditions.
However, the staff is amenable to alternatives, particularly to Branch Technical Position B.3.b(9) of MILB 5-3 (96-hour time limit to repair or plug confirmed condenser tube leaks).
.